Find the latest steel bridge tenders in western railway for 2026 from government departments, corporations and state PSUs. Get tender details and bidding information.
FILTERS
jru-kjg sec: replacement of steel girder up line bridge no.35 at ch: 303/500-600 span 3x12.20m steel girder+2x3.05m rcc slab (land arch closed) by cast-in-situ rcc box 3 nos. twin-cell rcc box (2 x 4.6m x 3.3m each)
View Insights
supply of gangway bridge complete to icf drg.no.lwsczac-2-5-055, alt.d or latest with bridge sheet to drg.no.lwsczac-2-5-026 alt.-a to aisi 304. special condition: the welding of item bridge sheet assy.(ss) with the allied brackets shall be done with m4 class electrode conforming to irs spec n.no.m28 with is code e 23.12lr26 (heavy coated) equivalent to aws code a5.4:e309l.. [ warranty period: 30 months after the date of delivery ] [quantity tolerance (+/-): 5 %age , item category : normal , total po value variation permitt ed: max 8 lacs ] ] amm(w)bvp, wr
corrigendum : construction of sarkhej-dholera semi high-speed double railway line, including spur lines to lothal nmhc and dholera airport terminal; comprising civil works, which includes formation & viaduct, bridges, station buildings, & associated works; track system (ballasted & blt), overhead traction system including electrical general services; signalling & telecommunication system, operating control centre, integration of all systems complete in all respect including testing & commissioning and all appurtenant works under jurisdiction of western railway
composite work (civil, electrical & s&t) comprising formation, viaducts, minor/major bridges, rubs/subways, station buildings, staff quarters, platforms, passenger amenities, supply & spreading of ballast, track linking and p-way works, along with design, supply, erection, testing & commissioning of 25 kv ac ohe and supply, installation, testing & commissioning of telecom outdoor systems including trenching, laying, blowing, splicing & jointing of 48f x 2 ofc on both sides of the track, one-side quad cable, emergency communication system and other associated works between tanda road (excluding) to jamaniya (including) from km 101.29 to km 125.92 (length: 24.63 km) in connection with the chhotaudepur-dhar new broad gauge line project in vadodara division of western railway.
composite work (civil, electrical & s&t) comprising formation, viaducts, minor/major bridges, rubs/subways, station buildings, staff quarters, platforms, passenger amenities, supply & spreading of ballast, track linking and p-way works, along with design, supply, erection, testing & commissioning of 25 kv ac ohe and supply, installation, testing & commissioning of telecom outdoor systems including trenching, laying, blowing, splicing & jointing of 48f x 2 ofc on both sides of the track, one-side quad cable, emergency communication system and other associated works between jamaniya (excluding) to tirla (excluding) from km 125.92 to km 147 (21.08 km) in connection with the chhotaudepur-dhar new broad gauge line project in vadodara division of western railway.
construction of new railway bg line in km 28/970 to 42/040 in between kulthana including and rajpura stations including earthwork, minor bridges (03 nos) and major bridges (07 nos), station buildings, tunnels (7 nos) and mega bridge ( 03 nos) in connection with ratlam mhow khandwa gauge conversion in the state of madhya pradesh
providing project general management services for various constructionsites/sections for new line, doubling, bypass line, rob/rubs projectsbeing executed by construction organization in the jurisdiction of northwestern railway.
construction of twelve mega/major bridges between ambamahuda and kui in c/w taranga hill abu road via ambaji new bg line project in ajmer division.
request for proposal for engineering, procurement & construction (epc) mode for construction of major bridges (34 nos) between hosapete (excl.) and ballari (excl.) stations, as part of ballari- hosapete 3rd & 4th line project.
group work - (1) dhola- dhasa section - construction of lhs of size 5.00 x 4.50 m at lc no. 18 at km 24/9-25/0 in prcl section. (size 1 x 5.00 m x 4.50 m box) (2) surendranagar - dhola section: construction of rub in lieu of manned lc no.114 at km 15/7-8 on prcl line. (size 2.00 x 5.00 m x 4.00 m box). (3) surendranagar- dhola section - construction of lhs/rub in lieu of manned lc no. 115 at km 17/3-4 in prcl line. (4) surendranagar -dhola section: construction of rub in lieu of manned lc no. 116, c-class at km 20/1-2. (5) surendranagar - dhola section: construction of rub in lieu of lc no. 127 at km 32/2-3 and lc no. 129 at km 33/9 - 34/0 on prcl line. (size 1 x 5.00 m x 4.50 m box) (6) surendranagar-dhola section - construction of lhs of size 5 x 4.50 m at lc no. 128 at km 32/9-33/0 in prcl section. (7) surendranagar - dhola section: construction of rub in lieu of lc no. 148 at km 58/4-5, lc no. 156 at km 68/8-9 and lc no. 159 at km 73/0-1 on prcl line. (size 1 x 5.00 m x 4.50 m box) (8) sihor -palitana section- construction of lhs in lieu of lc no 7 at km 6/7-8. (9) sabarmati-botad section - construction of rub in lieu of manned lc no.42, c-class at km 34/6-7 (size 4 m x 5 m box) (10) sabarmati-botad section construction of rub in lieu of manned lc no. 153, b2- class at km 159/9-160/0 (size 4 m x 5 m box) (11) sabarmati-botad section: construction of rub in lieu of lc no. 105 at km 106/5-6, lc no. 116 at km 123/2- 3.
rfp (request for proposal) for design and construction of major bridges (28 no's) with substructure, super structure, formation on approaches of 50 m on either side of the bridges and other connected protection works including surveying, soil and other connected parameters investigations, testing and commissioning the bridges in connection with doubling of chikjajur-rayadurg-ballari section of mysore and hubballi divisions in south western railway on epc mode.
earthwork in formation, construction/strengthening of major/minor bridges, construction of side drains, boundary walls and retaining walls etc between mumbai central to khar road stations in connection with the 6th line between mumbai central to borivali stations of mumbai division of western railway.
additional work for completion of devgarh madariya - nathdwara gc section including protection works, rob/rub approaches, platforms, platform shelters,rub covering shed, circulating area, drain, retaining wall, quarter works and other ancillary works connection with devgarh madariya - nathdwara gauge conversion project under ajmer division of north western railway.
construction of 4 lane road over bridge of 1 x 42.00m clear span composite girder at km: 370/33-35 in lieu of l-xing no. 190 at dhoswas yard between chanderiya-ratlam section and re-building of rob no. 289 (existing 2-lane to new 4-lane of 54.50m span composite girder) at km 654/54-55 at ratlam yard, between godhra-nagda section - ratlam division of western railway.
virar - joravasan section : rebuilding of various arch bridges by rcc boxes under sr. den/north jurisdiction.
ratlam division: providing subway(rub) (rcc box 02 nos.) at km: 53/23-25 bet spbg- ujn at hariphatak ujjain.
provision of rub of size 2x4.00m x2.50m at lc no. 140 (kote gate phatak) and pedestrian subway of size 4m x 2.5m at lc no. 141 (sankhla phatak) with covering and other ancillary work in bikaner-lalgarh section over bikaner division.
spgr-ask section: proposed construction of rub in lieu of lc no. 72 at km 122/500-600 between bsn-rdi stations
closure of interlocked lc gates (traffic/engineering) at lc no.46 between tk-mlsa stations, lc no.58 at bet gbb-ntr stations no.59 nittur station yard,lc no.56 between gubbi-nittur stations lc no.86 between ttr-hvl stations, lc no.88 between tk-ask section, lc no.138 between nvf-ajp stations, lc no.35 between kiat-ndv stations, lc no.38 between kiat-tk stations, lc no.39 between kiat-tk stations and lc no.71 between mlu-cpl stations, in lieu of rob/rub work over sbc & mys division.
hubballi division: gadag hosapete (gdg-hpt) section: construction of limited height subway in lieu of lc no.44 at km 78/100-200 in between harlapur-somapur (rlp-soq) stations (maintenance period-04 years).
[i] ohe modifications in connection with replacing low ht shelter of pf 7&8, provision of shelter in open area between second entry building and platform entrance including granite flooring [ii] ohe modifications in connection with augmentation of ac loco trip shed at sbc. [iii] provision of ohe for pit line no.1 at sbc yard. [iv] conversion of tramway ohe to conventional at sbc yard [v] bid- ohe modifications in connection with provision of proposed rd-06(spur line of 686m) with shunting neck of 650m towards sbc end duly dismantling existing goods unloading platform adjacent to rd-5 [vi] ohe modification in connection with proposed extension of pf-1 and pf-2 for a length of 150 mtrs and 5 mtr width at kndv station in sbc-y section [vii] ohe modification of shifting y tss down line ptfe [viii] sbc division- ohe modifications in connection with construction of foot over bridge(fob) at km55/200 at chanapattna (cpt) yard near lc no.47 (gangway:32mx3m, staircase:2x20m) for pedestrian movement (4t crossing)
[i] sbc-jtj section: proposed construction of rub at trespassing location at km 339/300-400 between hdih-kjm stations in aden/sbc sub-division- trd works[ii] sbc-jtj section: proposed construction of pedestrian subway at km.230/000-100 between pu-mar stations in aden/bwt sub-division [iii]recoupment of ballast at tss,sp/ssp and provision of cable trench covers in sbc-jtj section.[iv]bifurcation of elementary section at skpt station and modification of umbrella structures at ypr station. [v]provision of earthing and bonds at ssp/sp,fob and platform shelters in sbc-jtj section.[vi] kjm-augmentation of kjm shed for increasing homing capacity from 175 to 300 electric locomotives-detailed estimate. [vii]ohe modifications in connection with construction of new ac loco trip shed at ypr. [viii] ynk-bwt section: proposed an approach road on lh side in rub 85a at km 96/200-300 between cmy-svs stations [ix] ohe modifications in connection with construction of ac loco trip shed at smvb.