Find the latest transformer tenders in western railway for 2026 from government departments, corporations and state PSUs. Get tender details and bidding information.
FILTERS
design, supply, erection, testing and commissioning of 2x25 kv auto-transformer (at) feeding system, including 220/55 kv makkajipalli (mkj) traction substations, dharmavaram (dmm) sectioning posts (sps), nagasamudram (ngm) and penukonda (pkd) sub-sectioning posts (ssps), in bangalore-dharmavaram section in bangalore division of south western railway
View Insights
provision, installation, testing, commissioning of 200 va, 750/415 v control transformers in da set switchgear panel in lhb power car of mumbai division.
supply of excitation transformer kel part no:-c22004 for 8 kw rru unit (type kela 12125fm ) for 8 wheeler tower detc tower wagon as per icf specification no: icf/md/spec300 states : 00 rev 01 date:18/03/2020 or latest. make:- kel, bhel, cgl, or its equivalent. [ warranty period: 30 months after the date of delivery ] ]
supply of control transformer, 200va, 750/415v, type-ii, 50hz, single phase, "h" class i nsulation, dry type & air cooled, along with fuses complete, suitable for use in switch board cabinets of eog/hog lhb type ac coaches, powers cars, lhb garib rath ac coache s & smart lhb hog ac coaches, confirming to rdso specification no. rdso/pe/spec/ac/020 3/-2020 (rev-0). make as per letter. no. el/7.1.108/sbc/main file dt: 16.04.2021 are bhasin packar d, nacei, trolex, ramyaa, trinitron, kontact consortium, abrol or ask powertec only. [ warranty period: 30 months after the date of delivery ] [quantity tolerance (+/-): 5 %age , item category : normal , total po value variation permitt ed: max 8 lacs ] ]
supply of primary voltage transformer (pos no. 3) 25kv/200 volts-50 hz, 30 va, abb document no. 3ehp 585856r0001. (clw specification no. clw/es/3/0009 alt c & sketch no. clw/es/3/sk-1/0009 alt.c). [ warranty period: 30 months after the date of deli very ] ] sr. section engineer ( diesel )
supply of traction transformer complete with cooling system & accessories like h.t cable along with pr otection shield in passenger compartment & under frame area, thermostat etc. related protection equipme nt & with safety chain arrangement including termination crimping lugs, cable markers with heat shrinkabl e sleeves for power & control cables, equipment mounting & earthing hardware & accessories or equivalent . make - bhel, drawing no - 24661950068, 1276 kva. as per specification. [ warranty period: 30 months after the date of delivery ] ] senior section engineer
supply of dry type air cooled control transformer of type iv ,single phase ,100 va,750 v/110 v,ac 50h z for the set of panels of lhb non ac hog coaches conforming to rdso/pe/spec/ ac /0203-2020 (rev 0). a ccepted make: ask power tech, bhasin packard, trolex, trinitron control system, abrol engin eering, nacei, ramyaaelectro gear, kontactconsortium or similar, these shall comply the specificat ion including bom as per annexure a of rdso/pe/spec/ ac /0203-2020 (rev 0) only. firm shall submit oem/ authorized dealer certificate. [ warranty period: 30 months after the date of delivery ] ] section engineer electrical
supply of load resistor to primary voltage transformer as per clw spec clw/es/3/0024/a. [ warranty period: 30 months after the date of delivery ] [quantity tolerance (+/-): 5 %age , item category : normal , total po value variation permitted: max 8 lacs ] ]
supply of complete pcb control card with buzzer, transformer, reset option, high and low voltage cut off (suitable for all cls panels like 30a, 60a, 150a, 300a) as per rdso specification no. ti/spc/psi/cls/0025 suitable for eastland, suntron, supreme, control and systems make cls panels. [ warranty period : 30 months after the date of delivery ] ] - complete pcb control card with buzzer, transformer, reset option, high and low voltage cut off (suitable for all cls panels like 30a, 60a, 150a, 300a)
supply of bracket complete as per drg.no. 3 10113.0.76.095.077 alt. 'a' or latest, packing. f or 60 kva transformer of lhb ac coaches. [ warranty period: 30 months after the date of delivery ] ] - bracket complete as per drg.no. 3 10113.0.76.095.077 alt. 'a' or latest, packing. for 60 kva transformer of lhb ac coaches.
supply of 25kv ac memu transformer 1050 kva confirming to rdso spec rdso/pe/spec/emu/0 137. [ warranty period: 30 months after the date of delivery ] ] - 25kv ac memu transformer 1050 kva confirming to rdso spec rdso/pe/spec/emu/0137
supply of 25 kv current transformer (ct) 2 core ps class ratio 1500-750/5a as per rdso specification no. ti/spc/psi/ct/0210(07/2021) with a&c slip 1 or latest. [ warranty period: 30 months after the date of delivery ] ] - 25 kv current transformer (ct) 2 core ps class ratio 1500-750/5a as per rdso specification no. ti/spc/psi/ct/0210(07/2021) with a&c slip 1 or latest.
supply of control transformer, 200va, 750/415v, type-ii, 50hz, single phase, "h" class insul ation, dry type & air cooled, along with fuses complete, suitable for use in switch board ca binets of eog/hog lhb type ac coaches, powers cars, lhb garib rath ac coaches & smart lhb hog ac coaches, confirming to rdso specification no. rdso/pe/spec/ac/0203/-2020(rev-0). make as per letter. no. el/7.1.108/sbc/main file dt: 16.04.2021 are bhasin packard, nacei, trolex, ramyaa, trinitron, kontact consortium, abrol or ask powertec only. [ warranty period: 30 months afte r the date of delivery ] ] - control transformer, 200va, 750/415v, ty
aii div.: replacement of transformers on age cum condition basis at 'a' pointin diesel shed, aburoad.
replacement of auxiliary transformer in connection with replacement of indoor & outdoor signalling equipment with electronic interlocking at bhilad & bilimora stations in virar-surat of mumbai division
repair/ reconditioning of 7775 kva transformer for 3 phase electric locomotive. qty. 1 no. vide sanctioned brsp item no. 712/25-26.
supply of supply of 21.6 / 30.24 mva, 132/27 kv, 50 hz, single phase, onan / onaf, traction power tra nsformer along with all the accessories required for its erection, testing and commissioning and first fill of tr ansformer oil as per rdso specification no. ti/spc/psi/trnpwr/3201 with a&c slip no.01 or latest [ warran ty period: 30 months after the date of delivery ] [quantity tolerance (+/-): 5 %age , item category : normal , total po value variation permitted: m ax 8 lacs ] ]
supply of 132 kv current transformer of ratio 400-200/5 amp as per rdso specification no. ti/spc/psi/ ct/0210(07/2021) with a&c slip no. 1 or latest. [ warranty period: 30 months after the date of delivery ] ]
supply of 25 kv neutral current transformer with 10nos terminal connectors for each n ct ,ration 2/1amp ,as per rdso specification no eti/psi/90(6/95) slip no 1 to 9 or latest make:-r dso/core approved sources. the following connectors to be supplied along with each nct i)expansion type terminal connector- drg. no. eti/psi/p/11060 mod e -3nos ii) rigid type terminal connector- drg. no. e ti/psi/p/11090 mod c -4nos iii) terminal connector to suit zebra acsr conductor and 30 dia cu stud of ct /cb/traction power transformer - drg. no. eti/psi/p/11010 mod c-3nos [ warranty period: 30 months aft er the date of delivery ] ] sse/e/trd/hvr, swr
supply of 25 kv outdoor, single phase oil filled type current transformer with terminal connectors of r atio 200-100/5 amps as per rdso specification no. ti/spc/psi/ct/0210 (07/2021) with a & c slip no. 01. [ warranty period: 30 months after the date of delivery ] [quantity tolerance (+/-): 5 %age , item category : normal , total po value variation permitted: max 8 lacs ] ] - 25 kv outdoor, single phase oil filled t [25 kv outdoor, single phase oil filled type current transformer with terminal connectors of ratio 200-100/5 amps as per rdso specification no. ti/spc/psi/ct/0210 (07/2021) with a & c slip no. 01.]