✦ AI Summary
What this tender is about
supply of materials - 1. cement (per bag/ton), 2. sand (per cubic meter), 3. bajarpur (per cubic meter), 4. 20 mm bajri (per cubic meter), 5. 40 mm bajri (per cubic meter), 6. first class brick fm-150 (per piece/thousand), 7. second class brick fm-275 (per piece/thousand), 8. interlock tile 80 mm (per piece/thousand), 9. interlock tile 60 mm (per piece/thousand), 10. finishing equipment for panchayat bhawan / repair of panchayat bhawan (per piece/unit), 11. renovation equipment/repair (per /unit), 12. wall tiles (per square meter), 13. floor tiles (per square meter), 14. saria (per quintal), 15. iron angle/pipe (per quintal), 16. iron mesh (per quintal), 17. cement sheet/tin sheet (per square meter/piece), 18. soil filling (per cubic meter), 19. wooden doors/commercial/timber/plywood (per piece), 20. solar light new/repair equipment (per piece), 21. street light new/repair equipment (per piece), 22. e-rickshaw (per piece), 23. road roller (per piece), 24. electrical equipment (per piece/square meter), 25. iron fencing wire (per piece), 26. fogging machine/spray machine (per piece), 27. c.c. desk bench (per piece), 28. hand pump/community toilet repair (per piece), 29. garbage cart/dustbin/cleaning kit (per piece), 30. sohim, hypochlorite, bleaching powder & other insecticides & disinfectants (per kg/packet), 31. parmer iron wood (per liter), 32. distemper wall putty, paint, sanosam etc. (per kg), 33. pvc pipe & g.i. pipe tapping repair material (per running meter), 34. hand pump repair material (per running meter), 35. hand pump repair material (per running meter), 36. plywood & marker (per square foot), 37. r.c.c. pad/dump pipe (per running meter), 38. water cooler r.o. with (per piece), 39. running water supply equipment (per foot), 40. incinerator (per piece), 41. plumbing material (per piece), 42. open gym play ground equipment/barat ghar construction repair (per piece), 43. electrification work material (per piece), 44. iron gate & window (per piece), 45. water storage tank (per piece), 46. pulsar rod 40 mm (per cubic meter), 47. other material (per cubic meter), 48. complete work (per square meter/cubic meter/piece), 49. additional classroom (not specified), 50. unspecified location (not specified), 51. library (not specified), 52. cement bench (not specified), 53. light (not specified), 54. hardening (not specified) for construction work at the specified construction site for construction work under the financial year 2026-27 from the funds received from the 5th state finance, 15th finance, mnrega, swachh bharat mission (rural), odf plus, panchayat award, multipurpose panchayat bhawan scheme and other heads. (hindi image) Description : tender estimated cost & dates are tentative only. please refer nit or tender document for precise information.
Hide full brief & description