supply of supply and installation body shell items & partition frames for km/dtc/rvn l coaches as per drg nos, 1. 98210029, alt 'b' - 1 no 2. 98210028, alt 'b' - 1 no 3. 98210027, alt 'ni l' - 2 nos 4. 99410146, alt 'a' - 1 no. 5. 99410145, alt 'a' - 1 no. 6. 99410144, alt 'nil' - 1 no. 7. 99410 143, alt 'nil' - 1 no 8. 99410142, alt 'nil' - 1 no 9. 99410141, alt 'nil' - 1 no. 10.99410140, alt 'a' - 1 n o. 11.99410006, alt 'a' - 1 no. 12.99510008, alt 'a' - 2 nos. 13.99510007, alt 'a' - 2 nos.
4.99510004, alt 'a' - 6 nos. 15.99510003, alt 'a' - 6 no. 16.99410003, alt 'nil' - 1 no, 17.99410005, alt 'a' - 1 no. 18 .98210006, alt 'd' - 1 no. 19.98210007, alt 'c' - 1 no, 20.98210047, alt 'b' - 2 nos, 21.99410001, item- 14, alt 'nil' - 8 nos 22.99410001, item-15, alt 'nil' - 8 nos. the firm shall fulfil the manufacturi ng facility as per icf/md/spec-313, issue status-01, rev.01. special condition : installation r equired annexure 'a' dated 13.09.2023 to be followed. 1. the frame work and weld parts shall be packed in the container/steel pallet as per icf/j&t/sk-1865-alt 'b'. 2. the weld parts shall be placed at the bottom and frame work at the top. 3. other partition frames not fitting in the container shall be stacked one over the other, secured using packing strip and placed in steel pallet. 4. packing and plac ing of the items to be such that the frames could be removed easily from the packing prior to weld pa rts without any damages. 5. the height of each stack shall not exceed 750mm for easy handling. 6. s uitable and sufficient packing strips to be used such that stacked items do not disintegrate during tra nsit, storage and handling. "there will be minor changes in the drawings. the supplier shal l obtain the latest drawings before commencing manufacturing". [safety item] [ warran ty period: 30 months after the date of delivery ] [quantity tolerance (+/-): 5 %age , item category : normal , total po value variation permitt ed: max 8 lacs ] ] - s & i of body shell items & partition frames (km dtc)
Tender247 tries to ensure accurate & authentic tender information at its level best however it cannot be held responsible for Omissions, Errors, etc. Users are advised to refer to Tender Document published by Procuring entity before participating / submitting bid.