Submission Date
13 OCT 2026Opening Date
13 OCT 2026Tender Estimated Cost
Refer DocumentEMD
₹ 8.06 LakhTender Document Fees
Refer DocumentPrepare a complete bid response for this tender in under 30 minutes.
0000_xyzw_00000_0
Integral Coach Factory has invited bids for the supply of s & i frp paneling with fixing requirements for side wall, end wall and roo f of emu/3ph coaches to specn.no. icf/md/spec-167a,issue status-01, rev-05 with amd-01 t o 04 and general arrangement and dimensions to drg.no.emu/c/3ph(616)-4-2-001, col-i, al t-b, items- 1 to 9 and icf/mrvc/c3/bt-4-4-302, col-i, alt- k. please visit icf vendor portal for dow nloading drawing https://vp.icf.gov.in/vendtendordetnew.php using key: 07269gguwlp2721 [ warra nty period: 30 months after the date of delivery ] [quantity tolerance (+/-): 5 %age , item category : normal , total po value variation permitt ed: max 8 lacs ] ] furnishing - s & i frp panelling for side wall., with an EMD of ₹0.08 Cr. Please refer to the tender document for project value details. Interested bidders can submit applications until 13 October 2026, with the technical opening scheduled for 13 October 2026.
Loading.....
The EMD is ₹8.06 Lakh.
Bids close on 13 October 2026; bid opening is on 13 October 2026.
Integral Coach Factory, Tamil Nadu.