Submission Date
29 SEP 2026Opening Date
29 SEP 2026Tender Estimated Cost
Refer DocumentEMD
Refer DocumentTender Document Fees
Refer DocumentPrepare a complete bid response for this tender in under 30 minutes.
0000_xyzw_00000_0
Integral Coach Factory has invited bids for the supply of supply and application of one coach set epoxy pu paints for memu/dmc 3ph co aches (drg no.745-8-3-003,alt- nil. as detailed below : 1.two component p.u surfacer to spe cification rdso/m&c/pcn/100/2018, chapter-iv-25 ltrs. 2.thinner compatible for unsaturated polyster base kniffing putty,p.u surfacer and p.u gloss enamel finishing pai nt to specification rdso/m&c/pcn/100/2018, chapter-iii,iv,v-40 ltrs. 3.full gloss polyurathane enamel (two pack) exterior finishing paint to specification rdso/m&c/pcn/10 0/2018,chapter-v colour :pu signal blue ral-5005 (metallic finish)-30 ltrs. 4.full gloss poly urathane enamel (two pack) exterior finishing paint to specification rdso/m&c/pcn/100/20 18,chapter-v colour :pu pearl light grey ral-9022 (metallic finish)-45 ltrs. 5.full gloss pol yurathane enamel (two pack) exterior finishing paint to specification rdso/m&c/pcn/100/2 018,chapter-v colour :signal black ral-9004 (metallic finish)-02 ltrs 6.full gloss polyurat hane enamel (two pack) exterior finishing paint to specification rdso/m&c/pcn/100/2018,ch apter-v colour :sarson yellow ral-1021 (metallic finish)-08 ltrs. [ warranty period: 30 mont hs after the date of delivery ] [quantity tolerance (+/-): 5 %age , item category : normal , total po value variation permitte d: max 8 lacs ] ] furnishing depot/icf,chennai, - unf sni of paint for memu/dpc.. Please refer to the tender document for project value and EMD details. Interested bidders can submit applications until 29 September 2026, with the technical opening scheduled for 29 September 2026.
Loading.....
Please refer to the tender document for EMD details.
Bids close on 29 September 2026; bid opening is on 29 September 2026.
Integral Coach Factory, Tamil Nadu.