Submission Date
03 OCT 2026Opening Date
03 OCT 2026Tender Estimated Cost
₹ 5.60 LakhEMD
Refer DocumentTender Document Fees
Refer DocumentPrepare a complete bid response for this tender in under 30 minutes.
0000_xyzw_00000_0
Uttar Pradesh Co-operative Sugar Factories Federation Limited has invited bids for the repair, maintenance, and installation of plant/ systems/equipments (version 2) - industry unit; fabricate and install the cane carrier guide according to the provided sample and conduct a satisfactory trial; buyer , repair, maintenance, and installation of plant/ systems/equipments (version 2) - industry unit; replace the fibrizer refector plate and conduct a satisfactory trial; buyer , repair, maintenance, and installation of plant/ systems/equipments (version 2) - industry unit; fabricate the src and irc runner boxes and conduct a satisfactory trial; buyer , repair, maintenance, and installation of plant/ systems/equipments (version 2) - industry unit; fabricate boots using the 8 10 mm ms plates provided by src and irc and conduct a satisfactory trial; buyer , repair, maintenance, and installation of plant/ systems/equipments (version 2) - industry unit; carry out strengthening work using the channels and angles provided by src and irc and conduct a satisfactory trial; buyer , repair, maintenance, and installation of plant/ systems/equipments (version 2) - industry unit; remove the bottom of the supply juice tank install the provided 12 mm plate in its place and conduct a satisfactory trial; buyer , repair, maintenance, and installation of plant/ systems/equipments (version 2) - industry unit; " fabricate the src and irc motor gear bed and conduct a satisfactory trial; buyer , repair, maintenance, and installation of plant/ systems/equipments (version 2) - industry unit; remove the worn out trpf headstock side plate install the provided 6mm plate in its place and conduct a satisfactory trial; buyer , repair, maintenance, and installation of plant/ systems/equipments (version 2) - industry unit; fabricate teeth for the hydraulic grab replace old damaged teeth with new ones and conduct a satisfactory trial; buyer , repair, maintenance, and installation of plant/ systems/equipments (version 2) - industry unit; constructing a pump base installing the pump and motor up to 20 hp and conducting a trial run; buyer , repair, maintenance, and installation of plant/ systems/equipments (version 2) - industry unit; "dismantling fabricating and erecting weak or corroded pipelines up to 12 inch and conducting a satisfactory leak proof trial run; buyer , repair, maintenance, and installation of plant/ systems/equipments (version 2) - industry unit; dismantling fabricating and erecting weak or corroded bends up to 12 inch and conducting a satisfactory leak proof trial run; buyer , repair, maintenance, and installation of plant/ systems/equipments (version 2) - industry unit; dismantling fabricating and erecting weak or corroded flanges up to 12 inch and conducting a satisfactory leak proof trial run; buyer , repair, maintenance, and installation of plant/ systems/equipments (version 2) - industry unit; remove the worn out runners from the main bagasse carrier bagasse elevator and return bagasse carrier install 8x65 10x50 mm flat iron in their place g.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - industry unit; cut and remove the worn out side plates of the main bagasse carrier bagasse elevator and return bagasse carrier install 6 8 10 mm plates in their place.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - industry unit; dismantling fabricating and erecting weak or corroded pipelines up to 12 inches and conducting a satisfactory leak proof trial run; buyer , repair, maintenance, and installation of plant/ systems/equipments (version 2) - industry unit; dismantling fabricating and erecting weak or corroded bends up to 12 inches and conducting a satisfactory leak proof trial run; buyer , repair, maintenance, and installation of plant/ systems/equipments (version 2) - industry unit; dismantling fabricating and erecting weak or corroded flanges up to 12 inches and conducting a satisfactory leak proof trial run; buyer , repair, maintenance, and installation of plant/ systems/equipments (version 2) - industry unit; remove the old and corroded quad condensate juice heater condensate syrup vessel fabricate a new one using 8 10 mm m s plate complete all connections .. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - industry unit; repair apply patches and strengthen the umbrella assembly within the vapor shell juice heater quad body and ensure a satisfactory trial run; buyer , repair, maintenance, and installation of plant/ systems/equipments (version 2) - industry unit; remove the corroded filtrate vessel of the vacuum filter fabricate and install a new filtrate vessel using 8 10 mm m s plate complete all connections .. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - industry unit; removal of the old corroded platform and installation of a new platform in its place; buyer , repair, maintenance, and installation of plant/ systems/equipments (version 2) - industry unit; dismantling the corroded or weak shell compartment of the door clarifier fabricating a new one using 6 8 mm plates installing it on site welding it an.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - industry unit; dismantling fabricating and erecting weak or corroded reducers 600 800 mm at the quad station followed by a satisfactory leak proof trial; buyer , repair, maintenance, and installation of plant/ systems/equipments (version 2) - industry unit; dismantling fabricating and erecting weak or corroded tees 600 800 mm at the quad station followed by a satisfactory leak proof trial; buyer , repair, maintenance, and installation of plant/ systems/equipments (version 2) - industry unit; dismantling the existing first and second vapor pipelines of the juice heater fabricating and installing new pipelines 500 650 mm diameter using 8 10 .. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - industry unit; dismantling fabricating and erecting weak or corroded tees up to 12 inches and conducting a satisfactory leak proof trial run; buyer , repair, maintenance, and installation of plant/ systems/equipments (version 2) - industry unit; dismantling fabricating and erecting weak or corroded nipples up to 12 inches and conducting a satisfactory leak proof trial run; buyer , repair, maintenance, and installation of plant/ systems/equipments (version 2) - industry unit; cut out and remove the weak neck section of the dome and the bottom; buyer , repair, maintenance, and installation of plant/ systems/equipments (version 2) - industry unit; remove the old neck angles channels from the pan shell and roof and reinforce the structure using the supplied new angles channels; buyer , repair, maintenance, and installation of plant/ systems/equipments (version 2) - industry unit; cut out and remove the weak 16 inch 20 inch manhole sections on the vapor pipes at the pan floor level and fabricate and install replacements using the.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - industry unit; cut and remove the ms pipeline approx 36 meters in total length 400 600 mm diameter associated with the spray pond cut and remove the nipples at all.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - industry unit; strengthen the dome s top plate using the specified angles channels and conduct a satisfactory trial run; buyer , repair, maintenance, and installation of plant/ systems/equipments (version 2) - industry unit; cut and remove the weak 12 inch duckfoot bend on the injection pump s delivery line fabricate install and fit a new replacement followed by a satisfac.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - industry unit; dismantle and modify the seed conveyor belt running from the dryer house to the pan floor as instructed remove the motor and reduction gear fabricate an.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - industry unit; dismantle the 16 inch vapour valve on the pan floor install the provided replacement valve and conduct a satisfactory trial run; buyer , repair, maintenance, and installation of plant/ systems/equipments (version 2) - industry unit; cut out and remove the molasses distributor from the inlet of the continuous machines fabricate a new one using the supplied plate and install it; buyer , repair, maintenance, and installation of plant/ systems/equipments (version 2) - industry unit; install the 20 inch 22 inch manhole assembly complete with the blind flange on the pan floor; buyer , repair, maintenance, and installation of plant/ systems/equipments (version 2) - industry unit; installation of 6 inch 18 inch manholes including blind flanges; buyer , repair, maintenance, and installation of plant/ systems/equipments (version 2) - industry unit; dismantling fabrication and erection of weak corroded tees up to 12 inch followed by a satisfactory leak proof trial; buyer , repair, maintenance, and installation of plant/ systems/equipments (version 2) - industry unit; dismantling fabrication and erection of weak corroded nipples up to 12 inch followed by a satisfactory leak proof trial; buyer , repair, maintenance, and installation of plant/ systems/equipments (version 2) - industry unit; dismantling fabrication and erection of weak corroded crosses up to 12 inch followed by a satisfactory leak proof trial; buyer , repair, maintenance, and installation of plant/ systems/equipments (version 2) - industry unit; dismantling fabrication and erection of weak corroded bends up to 12 inch followed by a satisfactory leak proof trial; buyer , repair, maintenance, and installation of plant/ systems/equipments (version 2) - industry unit; dismantling fabricating and erecting weak or corroded flanges up to 12 inch and conducting a satisfactory leak proof trial; buyer , repair, maintenance, and installation of plant/ systems/equipments (version 2) - industry unit; dismantling fabricating and erecting weak or corroded reducers up to 12 inch and conducting a satisfactory leak proof trial; buyer , repair, maintenance, and installation of plant/ systems/equipments (version 2) - industry unit; cutting out and removing weak or corroded ducting plates of the sugar hopper fabricating new ducting plates from the provided 3mm plate installing them .. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - industry unit; removal of the old corroded platform and installation of a new one in its place; buyer , repair, maintenance, and installation of plant/ systems/equipments (version 2) - industry unit; modification of the chute for discharging sugar into the melter followed by a satisfactory trial run; buyer. The estimated project cost is ₹0.06 Cr. Please refer to the tender document for EMD details. Interested bidders can submit applications until 3 October 2026, with the technical opening scheduled for 3 October 2026.
Loading.....
Please refer to the tender document for EMD details.
Bids close on 3 October 2026; bid opening is on 3 October 2026.
Uttar Pradesh Co-operative Sugar Factories Federation Limited, Uttar Pradesh.
₹5.6 Lakh.