Submission Date
12 OCT 2026Opening Date
12 OCT 2026Tender Estimated Cost
₹ 20.55 LakhEMD
₹ 41.11 KTender Document Fees
Refer DocumentPrepare a complete bid response for this tender in under 30 minutes.
0000_xyzw_00000_0
Public Health Engineering Department has invited bids for the painting and minor repairing of, switch room, clearing, compound premises , making, temporary earthen road and, repairing of old valve chamber, etc of gramdihi piped water, supply scheme , p.h.e dte., block:-bhatar dist: purba, bardhaman., providing 15 nos fhtc, & laying of hdpe &, upvc pipe line for, village of dhanyakherur, majhergram pwss for, sajal gram of, manteswer block under, burdwan division.phe, dte., fixing of display, board with m.s, structure containing, land description at, dhenua pwss and, other schemes(64 nos.), within manteswer ,, galsi- ii block under, burdwan division , phe, dte., providing 48 nos fhtc, & laying of hdpe &, upvc pipe line for, village of majhergram of, majhergram pwss for, sajal gram of, manteswer block under, burdwan division.phe, dte., restoration of damaged pipeline, providing sluice valve, painting and minor repairing of switch room, clearing compound premises, making temporary earthen road and repairing of old valve chamber of orgram zone-1 piped water supply scheme , p.h.e dte. block:-bhatar dist: purba bardhaman, restoration of concrete road ,providing f.h.t.c. at karjjana piped water supply scheme of jjm in bhatar block , district purba bardhaman, durgapur sub division under burdwan division, p.h.e. dte., providing 48 nos fhtc & laying of hdpe & upvc pipe line for village of shigram of majhergram pwss for sajal gram of manteswer block under burdwan division.phe dte., laying of rising main in between tube well to distribution line (upvc pipe) at kulnagar for bhatar zone ii pipe water supply scheme in bhatar block under durgapur sub-division under burdwan division, p.h.e. dte., auger boring for laying of di pipe at bolgona chandrapur pwd road near 1 no. pump house of balgona pwss at bhatar block., repairing of distribution system pipeline, saddle (upvc), new fhtc for under kulnagar village of bhatar z-ii piped water supply scheme of bhatar development block within durgapur sub-division under burdwan division phe dte.., sinking of 250 x 200 mm. dia. 150 m. deep tube well by d.r. rig method using upvc pipe (cd) and upvc deep well screen (rds) under central circle, phe. dte. (1 no.) at bolgona railway par (replacement tw-iii) and pump house at beside mirickpara icds at patna village and laying of rising maing in between tube well and distribution line for head work site, pump house 3 ( rail line er dhar) and pump house 4 (patna village) under bolgona pwss [ sm/18326], construction of pump house , land development work , road restoration, remaining fhtc at bhatakul piped water supply scheme , p.h.e dte. block:-bhatar, dist: purba bardhaman., providing fhtc & land development of khurul piped water supply scheme under bhatar block, of durgapur sub division under burdwan division. [sm/13549], laying interconnection (zone 2) & road restoration at bhatakul piped water supply scheme, under durgapur sub division under burdwan division, p.h.e.dte. block bhatar, dist.-purba bardhaman., repairing of bursting & saddle replacement & ferrule wash of different dia. hdpe pipe of different location of paschim karampur water supply scheme and shushuna water supply schemes under manteswar block under durgapur sub division, p.h.e.dte., providing blance fhtc at bhatakul piped water supply scheme under durgapur sub-division under burdwan division, p.h.e.dte. block bhatar, dist.- purba bardhaman., repairing of pump house of bhatar z 1 ( 2 nos) pump houses with paint of boundery wall and repairing of old cholorine room at ohr premises at bhatar block within durgapur sub division (burdwan north ) under burdwan division phe dte., restoration of pipeline, providing sluice valve, painting and minor repairing of switch room, clearing compound premises ,remaining fhtc, making temporary earthen road and repairing of old valve chamber of orgram zone-ii piped water supply scheme , p.h.e dte. block:-bhatar dist: purba bardhaman. [sm/07814], providing of balance fhtc and restoration of damaged fhtc at different awc under bhatar block under durgapur sub division under burdwan division. phe dte. [project id:ph212239978s000], repairing of pump house & cleaning of pump house premises of bhatar zone-ii (5 nos)pump houses with paint of boundary wall at bhatar block within durgapur sub-division under burdwan division, phe dte., providing balance fhtc & laying of hdpe pipe line along with approach raod and other ancillary works for mandardihi pwss of bhatar block under burdwan division.phe dte. [sm/14052], laying of rising main in between tube well -2 (at ohr site) and distribution line and fhtc and pipe line at jenarar para under bhatar z-i pwss in bhatar block under durgapur sub-division under burdwan division, p.h.e. dte. [sm/08033]. The estimated project cost is ₹0.21 Cr, with an EMD of ₹0 Cr. Interested bidders can submit applications until 12 October 2026, with the technical opening scheduled for 12 October 2026.
Loading.....
The EMD is ₹41.11 Thousand.
Bids close on 12 October 2026; bid opening is on 12 October 2026.
Public Health Engineering Department, West Bengal.
₹20.55 Lakh.