construction of a compound wall of stone and iron angle around jijamata udyan: 1) excavation and concrete bed work, building a 3 feet high wall from the ground, and installing a 3 feet high s.s. mesh fence on it. 2) approximate measurement - 702.50 sq. ft. / 275 running meters (5%) 3) excavation - 702.34 cubic meters 4) bed concrete - 77.70 cubic meters 5) wall construction - 97.87 cubic meters 6) 40x40 mm angle = 162.00 sq. meters x 6 mm mesh (chain link) 7) grading - 2285.00 running meters.
Tender247 tries to ensure accurate & authentic tender information at its level best however it cannot be held responsible for Omissions, Errors, etc. Users are advised to refer to Tender Document published by Procuring entity before participating / submitting bid.