Submission Date
01 OCT 2026Opening Date
01 OCT 2026Tender Estimated Cost
₹ 15.22 Cr.EMD
₹ 15.50 LakhTender Document Fees
Refer DocumentPrepare a complete bid response for this tender in under 30 minutes.
0000_xyzw_00000_0
Karnataka Urban Infrastructure Development And Finance Corporation Limited has invited bids for the construction of sewage treatment plants (stp) of capacity 3.03 & 3.37 mld at aurad & hallikhed-b ulbs of bidar district, 2.26 & 3.56 mld at yelburga& kustagi ulbs of koppal district along with 5 years operation & maintenance (including 1-year defect liability period) under swachh bharat mission (u)-2.0 fund through design, built, operate and transfer (dbot) model. (package-sbm/klb-pkg-7) call 6. The estimated project cost is ₹15.22 Cr, with an EMD of ₹0.16 Cr. Interested bidders can submit applications until 1 October 2026, with the technical opening scheduled for 1 October 2026.
Loading.....
The EMD is ₹15.5 Lakh.
Bids close on 1 October 2026; bid opening is on 1 October 2026.
Karnataka Urban Infrastructure Development And Finance Corporation Limited, Karnataka.
₹15.22 Cr.