Submission Date
29 SEP 2026Opening Date
30 SEP 2026Tender Estimated Cost
₹ 83.64 Cr.EMD
₹ 50.00 LakhTender Document Fees
Refer DocumentPrepare a complete bid response for this tender in under 30 minutes.
0000_xyzw_00000_0
Hindustan Copper Limited has invited bids for the construction of tailing pond on epc mode for copper concentrator plant at musabani ghatshila india pkg02. The estimated project cost is ₹83.64 Cr, with an EMD of ₹0.5 Cr. Interested bidders can submit applications until 29 September 2026, with the technical opening scheduled for 30 September 2026.
Loading.....
The EMD is ₹50 Lakh.
Bids close on 29 September 2026; bid opening is on 30 September 2026.
Hindustan Copper Limited, Jharkhand.
₹83.64 Cr.
Yes, a corrigendum has been issued. Review it before bidding.