Submission Date
25 SEP 2026Opening Date
25 SEP 2026Tender Estimated Cost
Refer DocumentEMD
Refer DocumentTender Document Fees
Refer DocumentPrepare a complete bid response for this tender in under 30 minutes.
0000_xyzw_00000_0
Gujarat Metro Rail Corporation Limited has invited bids for the detailed design consultancy services for metro cum rrts hybrid corridor from vakil bridge metro station to badrabad metro station, elevated viaduct (12.38 km), elevated station (6 stations) including viaduct portion within the stations and transition spans on either side of the stations (phase - 3b2), 02 nos. of depot cum workshop and staff quarters in connection with ahmedabad metro rail project, phase - 3, "detailed design consultancy services for metro cum rrts hybrid corridor from apmc metro station to rakhial metro station, elevated viaduct (14.5 km), elevated station (11 stations) including viaduct portion within the stations andtransition spans on either side of the stations (phase - 3c1) in connection with ahmedabad metro rail project, phase - 3, detailed design consultancy services for metro cum rrts hybrid corridor from malek saban lake metro station to nehru nagar metro station, elevated viaduct (21.6 km), elevated station (15 stations)including viaduct portion within the stations and transition spans on either side of the stations (phase - 3c2) in connection with ahmedabad metro rail project, phase - 3.. Please refer to the tender document for project value and EMD details. Interested bidders can submit applications until 25 September 2026, with the technical opening scheduled for 25 September 2026.
Loading.....
Please refer to the tender document for EMD details.
Bids close on 25 September 2026; bid opening is on 25 September 2026.
Gujarat Metro Rail Corporation Limited, Gujarat.