(i) s&t work: utility shifting of lc gate no. 01 between dbg-mhp and lc no. 28 between dbg-kkht in connection with the work " construction of rob at lc no.- 01 between darbhanga-muhamadpur and lc no. 28 between darbhanga- kakarghati, (ii) s&t work: utility shifting of lc gate no. 2 between dbg-mhp in connection with the work " construction of rob at lc no.- 2 between darbhanga-muhamadpur in darbhanga district(iii)s&t work: utility shifting of lc gate no. 18 between tlwa-lsi in connection
e work " construction of rob at lc no.- 18 between thalwara-laheriasarai in darbhanga district.
Tender247 tries to ensure accurate & authentic tender information at its level best however it cannot be held responsible for Omissions, Errors, etc. Users are advised to refer to Tender Document published by Procuring entity before participating / submitting bid.