corrigendum : notice inviting e-tender for supply, installation and commissioning of devices, equipments, instrument, machineries, tools etc. - 3 phase bulb load box (15 a), single-phase 110 v/ 110 v dcresistive load box (20 a), 3-phase variac, 400w small wind turbine system to generate electricity., 500 v megger (digital), moving iron portable voltmeter (with both 250v, 500 v sca, electronic ballast, big screw driver (4 head), single core connecting wires (1 sq.mm) (1 coil), single core
ting wires (1.5 sq.mm) (1 coil), contactor, box spanner set (socket set 1/2" sq drive 32 pcs hex & bi-hex box spanner goti set 8-, 32mm), box type solar cooker with varying reflector., clip-on meter to measure ac/dc current, ac/dc voltage., complete set up for 40w, 12v dc solar street lighting system for student demonstration., necessary components with installation are required., complete set up for p.f. improvement using static condenser., complete set up of poly crystalline silicon pv cell to measure the cell parameters - oc, voltage (voc), sc current, volage-current-power at maximum power point, fill factor,, complete set up of the solar pv plant to produce electricity., complete set up to measure thermal performance of a solar water heating system., experimental setup for speed control of separately excited dc motor with both field flu, control and armature voltage control, digital multimeter, display board containing sample of different types of overhead conductors, underground, cables., display board of dismantle mccb, elcb, rccb., experimental kit for speed control by rotor resistance method for 2hp, 3-phase slip ring, i/m., experimental kit to measure solar radiation using pyranometer on tilted surface at the, difference angles of inclination., experimental set up for back-to-back test of 1 kva transformer., experimental set up for brake test of 1hp dc series motor, experimental set up for direct load test of 1 hp, 3 phase squirrel cage i/m., experimental set up for load test of single phase 1 kva transformer., experimental set up for no-load and blocked rotor tests on 3-phase, 1 hp squirrel cage i/m, experimental set up of v' curve and inverted v curve (no load) of 3- phase, 415v, 2 hp, synchronous motor., experimental set up to determine the efficiency by hopkinson's test., line tester, make & test the control and power circuit for automatic star-delta starter operation of sq, cage i/m using contactor circuit., make & test the control and power circuit for forward and reverse rotation of sq. cage i/m, using contactor circuit., one-piece solar plate collector with complete set up and measuring facility of, temperature, flow, pressure., screw driver set, set up measure the output voltage of chopper for resistive load by varying the frequency, and/or duty cycle of chopper., set up to control the speed of a dc motor using dc drives and microcontroller., set up to control the speed of a single-phase capacitor split phase induction motor using, diac-triac circuit and facility to measure speed., set up to control the speed of a three phase i/m by varying frequency and facility to plot, the graph between speed and frequency., setup to measure change of speed of given dc separately excited motor by varying voltage, using step down chopper., setup to measure change of speed of given dc series motor by varying armature voltage, using step down chopper., speed control of the ac servo motor with reversing facility., speed control of the dc servo motor with reversing facility., speed control of the stepper motor with reversing facility., stop push switch, start push switch (5 each), wattmeter (750w), rlc trainer kit with voltmeter, ammeter & pf meter with variable input voltage &, frequency adjustable mechanism, tri vector meter for measuring kw, kvar and kva of power line., check the functioning and testing of the isolation transformer., check the functioning and testing of the pulse transformer., study and check the connections (vector grouping) of three phase transformer., demonstrate various power system faults by d.c. network analyzer, dynamic braking of three phase squirrel cage induction motor using contactor control, digital tachometer, crimping tool with ferrules set for electrical engineering, at adyapeath annada polytechnic college.
Description :aapc/ele/dtet/02/2026 700076 : aapc
open tender
technical education and training department||directorate of technical education and training
4
Days Left
Submission Date
21 SEP 2026
Opening Date
21 SEP 2026
Tender Estimated Cost
Refer Document
EMD
₹ 28.00 K
Apply with Surety Bond
Tender Document Fees
Refer Document
AI Bid Assistant
Prepare a complete bid response for this tender in under 30 minutes.
Tender247 tries to ensure accurate & authentic tender information at its level best however it cannot be held responsible for Omissions, Errors, etc. Users are advised to refer to Tender Document published by Procuring entity before participating / submitting bid.