Submission Date
09 OCT 2026Opening Date
12 OCT 2026Tender Estimated Cost
₹ 4.54 Cr.EMD
₹ 6.81 LakhTender Document Fees
Refer DocumentPrepare a complete bid response for this tender in under 30 minutes.
0000_xyzw_00000_0
Bangalore Metro Rail Corporation Limited has invited bids for the package-p2-partial and full demolition/dismantling of buildings/structures identified from mysore road station to kottigepalya junction in corridor-1, from kottigepalya junction to sunkadakatte depot entry/exit incl sunkadakatte station in corridor-2. The estimated project cost is ₹4.54 Cr, with an EMD of ₹0.07 Cr. Interested bidders can submit applications until 9 October 2026, with the technical opening scheduled for 12 October 2026.
Loading.....
The EMD is ₹6.81 Lakh.
Bids close on 9 October 2026; bid opening is on 12 October 2026.
Bangalore Metro Rail Corporation Limited, Karnataka.
₹4.54 Cr.