part-i:- design, supply, erection, testing, commissioning, infringement removal of 25kv ac, single phase ohe in connection with 25 kv ac ohe modification work in manmad yard, in connection with doubling work between daund- manmad (a- route), part-ii:-design, supply, erection, testing, commissioning & infringement removal work in connection with manmad ssp shifting work in connection with doubling work between daund- manmad (a-route), part-iii :- design, supply, erection testing and commissioning
of 25 kv, single phase, ac ohe works, in connection with provision of 25 kv / 240 v, 25 kva at & 50 kva at supply for work, in conection with 3rd line between mmr-jl in bhusawal division of central railway, part-iv:- design, supply, erection, testing & commissioning of 25 kv ac, single phase ohe including modification in existing ohe, due to construction of rob at lc- 98 , lc- 88, lc- 93a & lc- 94 & removal of lt, ht infringement in connection with construction of the above rob/rub work & electrification of 2nos. sub way, in bhusawal division of central railway, part-v:- design, supply, erection, testing & commissioning of 25 kv ac, single phase ohe including modification in existing ohe in downside of nandgaon yard in connection with leftover work of manmad-jalgaon 3rd line, part-vi:- design, supply, erection, testing & commissioning of 25 kv ac, single phase ohe including modification in existing ohe due to 9 nos. new fobs in connection with 3rd line between mmr- jl.part-vii:-temporary lighting & emergency power supply arrangement during non-interlocking works at site as per the requirement of railway, in connection with 3rd line between mmr-jl.
Tender247 tries to ensure accurate & authentic tender information at its level best however it cannot be held responsible for Omissions, Errors, etc. Users are advised to refer to Tender Document published by Procuring entity before participating / submitting bid.