pop work including material, installation, paint & labour: supply and installation of pop material as per site requirements. , providing necessary gi framework/support structure wherever required. , fixing and shaping of pop boards/designs with proper alignment. , joint filling and treatment of all joints and gaps. , corner, edge and profile finishing. , surface preparation, putty/primer where required. , sanding and smooth finishing of the complete pop surface. , painting/colour finishing
e completed 2 coats emulsion paint. , complete labour charges for cutting, fixing, finishing and painting. , all necessary consumables and adhesive materials required for the work. , scope includes: pop material + framework + fixing accessories + jointing/finishing + putty + primer + painting (2 coats) + labour + installation + final finishing-1925.00 sq,
Tender247 tries to ensure accurate & authentic tender information at its level best however it cannot be held responsible for Omissions, Errors, etc. Users are advised to refer to Tender Document published by Procuring entity before participating / submitting bid.