rate analysis of datacenter and war room sysyem related items for new administrative building of pcmc - 1. supply, installation, testing and commissioning (sitc) of active videowall as per the detailed technical specifications mentioned at 13.a.1 in the annexure 13 enclosed separately including all necessary accessories and associated components, along with a comprehensive warranty for a period of five (5) years. 2. supply, installation, testing and commissioning (sitc) of windows
l controller as per the detailed technical specifications mentioned at 13.a.2 in the annexure 13 enclosed separately including all necessary accessories and associated components, along with a comprehensive warranty for a period of five (5) years. 3. supply, installation, testing and commissioning (sitc) of kvm console as per the detailed technical specifications mentioned at 13.a.3 in the annexure 13 enclosed separately including all necessary accessories and associated components, along with a comprehensive warranty for a period of five (5) years. 4. supply, installation, testing and commissioning (sitc) of kvm standalone transmitter as per the detailed technical specifications mentioned at 13.a.4 in the annexure 13 enclosed separately including all necessary accessories and associated components, along with a comprehensive warranty for a period of five (5) years. 5. supply, installation, testing and commissioning (sitc) of operator workstations as per the detailed technical specifications mentioned at 13.b.1 in the annexure 13 enclosed separately including all necessary accessories and associated components, along with a comprehensive warranty for a period of five (5) years. 6. supply, installation, testing and commissioning (sitc) of 31.5" full hd curved led monitor as per the detailed technical specifications mentioned at 13.8.2 in the annexure 13 enclosed separately including all necessary accessories and associated components, along with a comprehensive warranty for a period of five (5) years. 7. supply, installation, testing and commissioning (sitc) of fire alarm system as per the detailed technical specifications mentioned at 13.c.1 in the annexure 13 enclosed separately including all necessary accessories and associated components, along with a comprehensive warranty for a period of five (5) years. 8. supply, installation, testing and commissioning (sitc) of clean agent (gas-based) fire suppression system - server room & ups/battery room as per the detailed technical specifications mentioned at 13.c.2 in the annexure 13 enclosed separately including all necessary accessories and associated components, along with a comprehensive warranty for a period of five (5) years. 9. supply, installation, testing and commissioning (sitc) of vesda system as per the detailed technical specifications mentioned at 13.c.3 in the annexure 13 enclosed separately including all necessary accessories and associated components, along with a comprehensive warranty for a period of five (5) years. 10. supply, installation, testing and commissioning (sitc) of wld system as per the detailed technical specifications mentioned at 13.c.4 in the annexure 13. enclosed separately including all necessary accessories and associated components, along with a comprehensive warranty for a period of five (5) years. 11. supply, installation, testing and commissioning (sitc) of rodent repellent system as per the detailed technical specifications mentioned at 13.c.5 in the annexure 13 enclosed separately including all necessary accessories and associated components, along with a comprehensive warranty for a period of five (5) years. 12. supply, installation, testing and commissioning (sitc) of precision air conditioning (pac) system as per the detailed technical specifications mentioned at 13.c.6 in the annexure 13 enclosed separately including all necessary accessories and associated components, along with a comprehensive warranty for a period of five (5) years. 13. supply, installation, testing and commissioning (sitc) of video wall (4 x 2) 55" as per the detailed technical specifications mentioned at 13.d.1 in the annexure 13 enclosed separately including all. 14. necessary accessories and associated components, along with a comprehensive warranty for a period of five (5) years. 15. supply, installation, testing and commissioning (sitc) of windows based_videowall controller as per the detailed technical specifications mentioned at 13.d.2 in the annexure 13 enclosed separately including all necessary accessories and associated components, along with a comprehensive warranty for a period of five (5) years. 16. supply, installation, testing and commissioning (sitc) of kvm console as per the detailed technical specifications mentioned at 13.d.3 in the annexure 13 enclosed separately including all necessary accessories and associated components, along with a comprehensive warranty for a period of five (5) years. 17. supply, installation, testing and commissioning (sitc) of kvm standalone transmitter as per the detailed technical specifications mentioned at 13.d.4 in the annexure 13 enclosed separately including all necessary accessories and associated components, along with a comprehensive warranty for a period of five (5) years. 18. integration capability for interfacing the video wall processor/control-room display controller system with the campus managerment digital twin system (cmsdts) using oem's api/sdk/https/standard protocol/any type of communication license with the capability of visualization of data in the cmsdts.
Description :rate analysis of datacenter and war room sysyem related items for new administrative building of pcmc 411018 : pcmc pimpri
open tender
pimpri chinchwad municipal corporation||electrical dept
5
Days Left
Submission Date
22 SEP 2026
Opening Date
23 SEP 2026
Tender Estimated Cost
Refer Document
EMD
Refer Document
Apply with Surety Bond
Tender Document Fees
Refer Document
AI Bid Assistant
Prepare a complete bid response for this tender in under 30 minutes.
Tender247 tries to ensure accurate & authentic tender information at its level best however it cannot be held responsible for Omissions, Errors, etc. Users are advised to refer to Tender Document published by Procuring entity before participating / submitting bid.