repair & maintenance on panjwar bathri road km. 0/00 to 9/00/sh:-painting work on bridge and parapets etc at rd. 5/904 rhs),/r & m/o on link road saloh nalka to salch pond km. 0/00 to 1/00(sh-c/o /wall rd. 0/572 50 to 0/695 & c/o cc pavement rd. 0/614.30 to 0/618.60),repair & restoration work of link road from the house of paramjit ward no.6 to the house of joga singh ward no.4 gp dulehar (sh:-c/o r/wall phase-deposit work ofc,restoration of rain damages on link road to village nagnoli
et road km. 0/00 to 5/560 in khad section under khad sub-division hppwd, division harolli (sh-hiring of excavator cum loader for terming of access soil in berm, removal of slips & c/o unlined drain, clearing of rcc culvert & hume pipe culverts in rainy season),construction of govt. degree collage at haroli distt. una (sh:-landscaping, beautification & plantation work phase-ill,restoration of rain damage on link road lower badhera to lower kangar via mohalla paharian km. 0/00 to 2/00 (sh:-construction of solid causeway at itd. 0/514.75 to 0/519.75),repair & maintenance on panjwar bathri road km. 0/00 to 34/00(sh- painting work on bridge and parapets etc. rd. 5/904 lhs),restoration of rain damage on link road saloh naika to salch pond km. 0/00 to 1/00(sh-c/o r/wall rd. 0/650 to 0/672:50 & c/o cc pavement rd. 0/610 to 0/614.30),balance work for the construction of driving training track & traffic park at rora haroli distt. una (sh:-murals art on inner right side of boundary wall penci no.3 & 4) deposit work,restoration of rain damages on (i) link road to harizan basti via mohalla brahmna, gujran chaperian umter seep km. 0/0 10 3/345 () link road,panjawar bathri road km. 0/00 to 1/00 in khad section under khad sub-division hppwd, division haroll (sh-hiring of excavator cum loader for removal of slips & c/o unlined drain, clearing of rcc culvert & hume pipe culverts in rainy season),restoration of rain damage on link road lower badhera to lower kangar via mohalla paharian km. 0/00 to 2/00 (sh:-construction of solid causeway at rd. 0/509.90 0/514.75),repair & maintenance on link road to village khad km. 0/00 to 2/240(sh painting work on bridge and parapets etc, at rd. 0/516),balance work for the construction of govt. degree collage at haroli distt. una (sh-art painting on stage elevation wall-phase-iv)deposit work,construction of govt. degree collage at haroli distt. una (sh-landscaping. beautification & plantation work phase-i,restoration of rain damage on link road lower badhera to lower kangar via mohalla paharian km. 0/00 to 7/00 (sh:-construction of solid causeway at rd. 0/500 to 0/505),balance work for the construction of govt. degree collage at haroli distt. una (sh-art painting on stage elevation wall-phase-iii) deposit work,balance work for the construction of driving training track & traffic park at rora haroli distt. una (sh:-murals art on inner right side of boundary wall penel no.2 & 3) deposit work,construction of govt. degree collage at haroil distt. una (sh:-landscaping, beautification & plantation work)phase-,restoration of rain damage on link road lower badhera to lower kangar via mohalla paharian km. 0/00 to 2/00 (sh:-construction of solid causeway at rd. 0/505 to 0/509.90),balance work for the construction of govt. degree collage at harali distt. una (sh:-art painting on stage elevation wall phase-11) deposit work,a/r & m/o on panjwar bath road km. 0/00 to 34/00(sh:-supplying & stacking of machine brick in haroli sub-division),a/r & m/o on panjwar bathri road km. 0/00 to 34/00(sh:-supplying & stacking of machine brick in khad sub-division) deposit work,a/r & m/o on link road gondpur turf jaichand to jhol manjra km. 0/00 to 2/500(sh:-supplying & stacking of machine brick in tahilwal sub-division, hppwd tahliwal) deoposit work,construction of additional 50-bedded civil hospital at haroli distt. una (sh preparation of working estimate & onit including submission of hard and soft copies) deposit work,restoration of rain damages on laluwal gondpur jaichand to singan jungian up to punjab boundary km. 0/00 to 13/570 (sh: c/o retaining wall at rd. 0/410 to 0/919.40 lhs) under pdna 2025),a/r & m/q paniraeus a 2025),a/r & m/o panjwar bathri road km. 0/00 to 34/00 (sh-painting work on bridge at rd. 29/500 and parapets etc.),a/r & m/o on ajouli santoshgarh polian km. 0/00 to 17/400)mdr 39 (sh-painting work on rcc crah barrier & parapet etc.),restoration of rain damages on lalhari to pollan road km. 0/00 to 8/00 (sh-p/l cc in berm at rd. 5/250 to 5/320 bhs),a/r & m/o on una jaljon road km. 0/00 to 23/00 (sh:-painting work on rcc crah barrier & parapet etc.),restoration of rain damages on lalhari to pollian road km. 0/00 8/00 (sh p/l cc in berm at rd. 5/580 to 5/g51 bhs),restoration of rain damages on lalhari to polian road km. 0/00 to 8/00 (sh-p/l cc in berm at rd. 5/510 to 5/580 bhs),restoration of rain damages on various road in ghaluwal section under sub-division haroli hppwd (sh:-deployment of excavator cum loader for remova of debries, slips & c/o unlined drain, clearance of road side drains),restoration of rain damages on link road pollan to janani km 0/00 to 2/090 link road baba bodal shah km., 3/00 to 6/00 (sh-deployment of excavator cum loader & tractor for trening of access sail in berm removal of slips & c/o unlined drain etc. in rainy season etc.),restoration of rain damages on 1) link road to vill. singan to hp boundary 0/00 to 1/300, 2) link road to village gondpur turf jaichand km 0/00 to 0/800 3) link road to village jongpur from laluwal to gondpur road km. 0/00 to 1/200) (sh:- deployment of excavator cum loader & tractor for treming of access soil in berm removal of silps & c/o unlined drain etc. in rainy season etc.),restoration of rain damages on link road to village suainsowal km. 0/00 to 2/205 (sh:-repair of rain cuts at various rds from km. 0/500 to 2/205),repair & restoration work of link road from the house of paramjit ward no.6 to the house of joga singh ward no.4 mohal gp dulchar(sh-c/o retaining wall length=9.00 mtr. & helpist-3.00 mtr (phase-1) deposit-(ofc),a/r & m/o on various road under khad sub-division hppwd tehsil harol distt. una hp (sh:- providing and supplying of delineators),a/r & m/o on various road under tahliwal sub-division hppwd tehsil haroli distt. una hp (sh:-providing and supplying of delineators),a/r & m/o on various road under harali sub-division hppwd tehsil haroli distt. una hp (sh:-providing and supplying of delineators),restoration of rain damages on link roud pollan to janani km. 0/00 to 3/00 (sh:-deployment of excavator cum loader & tractor for treming of access soil in berm removal of slips & c/o unilned drain etc. in rainy season etc.),restoration of rain damages on liek road to village sainsowal km, 0/00 to 2/225(sh-c/o u-shape drain at rd. 2/155 to 2/183 lhs),restoration of rain damages on link road to village sainsawal km. 0/00 to 2/225(sh:-c/o u-shape drain at rd. 2/183 to 2/210.50 (hs),restoration of rain damages on link road gondpur jaichand road to thol majra km. 0/00 to 2/500 (sh-deployment of excavator cum loader & tractor for treming of access soil in berm removal of slips & c/o unlined drain etc. in rainy season etc.),restoration of rain damages on link road to village sainsowel km. 0/00 to 2/225(sh-c/o u-shape drain at rd. 2/210.50 to 2/238:30 lhs),restoration of rain damages on panjwar bathri road km. 0/00 to 9/00(sh-repair of bridge ms railing at rd. 2/390),restoration of rain damages on link road village gondpur bulla km 00/0/150, link road from umrali to dulehar vis ghoua kim. 0/00 to 4/200 (sh deployment of excavator cum loader & tractor with trolley removal of slips & debries, & c/o unlined drain & clearance of road side drains in rainy season ets,balance work estimate for the restoration & reconstruction of sampark marg from main road to thakur duwara gp pubowal (sh: p/l 60mm thick paver block at rd. 0/164 0/188)(under mmsy),balance work estimate for the restoration & reconstruction of sampark marg from main road to thakur duwara gp pubowal (sh:- p/l 60mm thick paver block at rd. 0/188 to 0/211.90) (under mmsy),restoration of rain damages on laluwal gondpur jaichand to singan junglan up to punjab boundary km. 0/00 to 13/570 (sh: c/o retaining wall at rd. 0/400 to 0/410 lhs) under pona 2025),restoration of rain damages on panjwar bathri road to gondpur jaichand via baliwal (linder pona 2025 (sh:-c/o retaining wall at rd. 15/542 to 15/552 lhs) under pona 2025),restoration of rain damages on link road to village mohalla tiperian km. 0/00 to 6/650 in pandoga section under khad sub division hppwd division haroll(sh:-hiring of excavator cum loader for removal of slips, c/o unlined drain clearing of rcc culvert &b hume pipe culverts in rainy season)km. 0/00 to 3/300),restoration of rain damages on ajouli santoshgarh tahliwal polian jaljon road (hp boundary) km. 0/00 to 13/400, (under pdna 2025) (sh:-c/o retaining wall at frd. 11/400 to 11/410.20 lhs,restoration of rain damages on harijan basti via mohalla brahmna, gujran chaperian km. d/00 to 3/345(sh-c/o b/wall in rd 0/987 to 0/997 rh5),restoration of rain damages on link road subowana bankhandi via harijan basti haroli 0/00 to 1/300 (sh:-c/o r/wall at rd. 0/664.20 to 0/673.20 lhs(under pona-2025),restoration of rain damages on link road subowana bankhandi via marijan pasti haroli 0/00 to 1/300 (sh: c/o r/wall at rd. 0/655 to 0/664.20 lhs(under pdna-2025),restoration of rain damages on link road panjwar bathri to gondpur turf jaichand 0/00 to 20/600(sh-c/o b/wall at rd. 3/800 to 3/813.60 lhs) (under pona-2025),restoration of rain damages on link road panjwar bathri to gondpur turf jaichand 0/00 to 20/600 (sh:-c/o b/wall at rd. 3/813.60 to 3/827.30 lhs) (under pdna-2025),restoration of rain damages on ajouli santoshger tahliwal pollan jaijon road (hp boundary) km. 0/00 to 13/400 under pdna 2025 (sh:-c/o r/wall at rd. 11/410.20 to 11/417.20 lhs) (under pdna-2025,restoration of rain damages on link road to village bhoolgarh km. 0/100 to 2/600 (sh-deployment of excavator cum loader & tractor treming of access soil in berm, removal of slips & c/o unlined drain in rainy season etc.),restoration of rain damages on link road panjwar bathri to gondpur turf jaichand 0/00 to 20/600(sh:-c/o b/wali at rd. 3/827.30 to 3/841.10 lhs) (under pdna-2025),restoration of rain damages on link road to village khatrian mohalla saloh km. 0/00 to 7/250 (sh:-deployment of excavator cum loader & tractor treming of access soil in berm, removal of slips & c/o unlined drain in rainy season etc.),restoration of rain damages on taluwal gondpur jaichand to singan thungian upto punjab border (mdr-125) km. 12/470 to 13/570, tahirwal bathri road km. 0/00 to 8/00 (sh-deployment of excavator cum loader & tractor with trolley for removal of slips & debries, c/o unlined drain & clearance of road side drains in rainy season etc.),restoration of rain damages on panjwar bathri road km. 0/00 to 9/00 (sh-c/o r/wall in rd. 2/130 to 2/140 rhs),restoration of rain damages on panjwar bathri road km. 0/00 to 9/00 (sh:-c/o r/wall in rd. 2/120 to 2/130 rhs),
Description : tender estimated cost & dates are tentative only. please refer nit or tender document for precise information.
5
Days Left
Submission Date
Refer Document
Opening Date
23 SEP 2026
Tender Estimated Cost
₹ 99.95 K
EMD
₹ 2.00 K
Apply with Surety Bond
Tender Document Fees
Refer Document
AI Bid Assistant
Prepare a complete bid response for this tender in under 30 minutes.
Tender247 tries to ensure accurate & authentic tender information at its level best however it cannot be held responsible for Omissions, Errors, etc. Users are advised to refer to Tender Document published by Procuring entity before participating / submitting bid.