repair & maintenance on panjwar bathri road km. 0/00 to 9/00/5h-painting work on bridge and parapets etc. al rd. 5/904 rhs),a/r & m/o on link road saloh nalka to saloh pond km. 0/00 1/00(sh)-c/d r/wall rd. 0/672.50 to 0/695 & c/o cc pavement rd. 0/614.30 0/618.60),repair & restoration work of link road from the house of paramjit ward no.6 to the house of joga singh ward no.4 gp dulehar (sh-c/o r/wall phase-1),deposit work ofc,restoration of rain damages on link road to village nagnoli
ret road km. 0/00 to 5/560 in khad section under khad sub-division hppwd, division haroli (sh-hiring of excavator cum loader for terming of access soil in berm, removal of slips & c/o unlined drain, clearing of rcc culvert & hume pipe culverts in rainy season),construction of govt. degree collage at haroli distt. una (sh:-landscaping beautification & plantation work) phase-ill,restoration of rain damage on link road lower radhera to lower kangar via mohalla paharian km. 0/00 to 2/00 (5h-construction of solid causeway at rd 0/514.75 to 0/519.75),repair & maintenance on panjwar bathri road km. 0/00 to 34/00(sh: painting work on bridge and parapets etc. rd. 5/904 lhs),restoration of rain damage on link road saloh nalka to salch pond km. 0/00 to 1/00(sh-c/o r/wall rd, 0/650 to 0/672.50 & c/o cc pavement rd. 0/610 to 0/614.30),balance work for the construction of driving training track & traffic park at rora haroli distt. una (sh:-murals art on inner right side of boundary wall pencl no.3 & 4) deposit work,restoration of rain damages on (i) link road to harizan basti via mahalla brahmna, gujran chaperian umter seep km. 0/0 to 3/345 (ii) link road panjawar bathri road km, 0/00 to 1/00 in khad section under khan sub-division hppwd, division haroli (sh-hiring of excavator cum loader for removal of slips & c/o unlined drain, clearing of rcc culvert & hume pipe culverts in rainy season),restoration of rain damage on link road lower badhera to lower kangar via mohalla paharian km. 0/00 to 2/00 (sh-construction of solid causeway at rd. 0/509.90 0/514.75),repair & maintenance on link road to village khad km. 0/00 to 2/240/54 painting work on bridge and parapets etc. at rd. 0/516),balance work for the construction of govt. degree collage at haroli distt. lina (sh-art painting on stage elevation wall-phase-iv)deposit work,construction of govt. degree collage at haroli distt. una (sh-landscaping, beautification & plantation work phase-i,restoration of rain damage on link road lower badhera to lower kangar via mohalla paharian km. 0/00 to 2/00 (sh:-construction of solid causeway at rd. 0/500 to 0/505),balance work for the construction of govt. degree collage at haroli distt. una (sh:-art painting on stage elevation wall-phase-iii)deposit work,restoration of rain damages on link road to village sainsowal km. 0/00 to 2/225(sh-c/o u-shape drain at rd. 7/210.50 to 2/238 30 lhs),restoration of rain damages on panjwar bathri road km. 0/00 to 9/00(sh-repair of bridge ms railing at rd. 2/390),restoration of rain damages on link road village gondpur bulla km 00/0/350, link road from umrali to dulehar viu ghous km. 0/00 to 4/200 (sh-deployment of excavator cum loader & tractor with trolley removal of slips & debries, & c/o unlined drain & clearance of road side drains in rainy season etc),balance work estimate for the restoration & reconstruction of sampark marg from main road to thakur duwara gp pubowal (sh:- p/l 60mm thick paver block at rd. 0/164 0/188) under mmsy),balance work estimate for the restoration & reconstruction of sampark marg from main road to thakur duwara gp puhowal (sh:- p/l 60mm thick paver block at rd. 0/188 to 0/211.90)(under mmsy),restoration of rain damages on laluwal gondpur jaichand to singan jungian up to punjab boundary km. 0/00 to 13/570 (sh: c/o retaining wall at rd 0/400 0/410 lhs) under pona 2025),restoration of rain damages on panjwar bathri road to gondpur jaichand via baliwal(under pdna 2025 (sh:- c/o retaining wall at rd. 15/542 to 15/552 lhs) under pdna 2025),restoration of rain damages on link road to village mohalla tiperian km. 0/00 to 6/650 in pandoga section under khad sub division hppwd division haroli(sh:-hiring of excavator cum loader for removal of slips, c/o unlined drain clearing of rcc culvert & hume pipe culverts in rainy season)km. 0/00 3/300),restoration of rain damages on ajouli santoshgarh tahliwal polian jaijon road (hp boundary) km. 0/00 to 13/400, (under pdna 2025) (sh:-c/o retaining wall at rd. 11/400 to 11/410.20 lhs),restoration of rain damages on harijan basti via mohalla brahmna, gujran chaperian km. 0/00 to 3/345(sh-c/o b/wall in rd. 0/982 to 0/997 rhs),restoration of rain damages on link road subowana bankhandi via harijan basti haroli 0/00 to 1/300 (sh: c/o r/wall at rd. 0/664.20 0/673.20 lhs(under pdna-2025),restoration of rain damages on link road subowana bankhandi via harijan pasti haroli 0/00 to 1/300 (sh:-c/o r/wall at rd. 0/655 to 0/664.20 lhs(under pdna-2025),restoration of rain damages on link road panjwar bathri to gondpur turf jaichand 0/00 to 20/600(sh:-c/o b/wall at rd. 3/800 3/813.60 lhs) (under pona-2025),restoration of rain damages on link road panjwar bathri to gondpur turf jaichand 0/00 10 20/600 (sh:-c/o b/wall at rd. 3/813.60 to 3/827.30 lhs) (under pdna-20251,restoration of rain damages on ajouli santoshgarh tahliwal polian jaijon road (hp boundary) km. 0/00 to 13/400 under pdna 2025 (sh:-c/o r/wall at rd. 11/410.20 to 11/417.20 lhs) (under pdna-2025),restoration of rain damages on link road to village bhoolgarh km. 0/00 to 2/600 (sh deployment of excavator cum loader & tractor treming of access soil in berm, removal of slips & c/o unlined drain in rainy season etc.).,restoration of rain damages on link roud panjwar bathri to gondour turf jaichand 0/00 to 20/600/sh:-c/o b/wall at rd. 3/827.30 to 3/841.10 lhs) (under pdna-2025),restoration of rain damages on link road to village khatrian mohalla salch km. 0/00 to 7/750 (sh:-deployment of excavator cum loader & tractor treming of access soil in berm, removal of slips & c/o unlined drain in rainy season etc.),restoration of rain damages on laluwal gondpur jaichand to singan jhungian upto punjab border (mdr-125) km. 12/470 to 13/570, tahilwal bathri road km. 0/00 to 8/00 (sh:-deployment of excavator cum loader & tractor with trolley for removal of slips & debries, g/o unlined drain & clearance of road side drains in rainy season etc.),restoration of rain damages on panjwar bathri road km. 0/00 to 9/00 (sh-c/o r/wall in rd. 2/130 2/140 rhs),restoration of rain damages on panjwar bathri road km. 0/00 to 9/00 (sh.-c/o r/wall in rd. 2/120 to 2/130 rhs),
Tender247 tries to ensure accurate & authentic tender information at its level best however it cannot be held responsible for Omissions, Errors, etc. Users are advised to refer to Tender Document published by Procuring entity before participating / submitting bid.