Submission Date
05 OCT 2026Opening Date
05 OCT 2026Tender Estimated Cost
₹ 26.81 Cr.EMD
₹ 26.81 LakhTender Document Fees
Refer DocumentPrepare a complete bid response for this tender in under 30 minutes.
0000_xyzw_00000_0
Bangalore Metro Rail Corporation Limited has invited bids for the shifting of bescom utilities at orr from pes college to laggere pipeline road in package-2 of bmrcl phase-3 project. The estimated project cost is ₹26.81 Cr, with an EMD of ₹0.27 Cr. Interested bidders can submit applications until 5 October 2026, with the technical opening scheduled for 5 October 2026.
Loading.....
The EMD is ₹26.81 Lakh.
Bids close on 5 October 2026; bid opening is on 5 October 2026.
Bangalore Metro Rail Corporation Limited, Karnataka.
₹26.81 Cr.