Submission Date
28 SEP 2026Opening Date
28 SEP 2026Tender Estimated Cost
₹ 19.56 LakhEMD
₹ 19.60 KTender Document Fees
Refer DocumentPrepare a complete bid response for this tender in under 30 minutes.
0000_xyzw_00000_0
State Bank Of India has invited bids for the sitc of 10 kwp capacity on-grid rooftop solar power plant at sbi senior officers residential complex, alipore , sitc of 5 kwp capacity hybrid rooftop solar power plant at sbi david hare residential complex, durgapur , sitc of 6 kwp capacity hybrid rooftop solar plant plant at sbi michael faraday residential complex, durgapur , sitc of 1 kwp capacity hybrid rooftop solar power plant at sbi officers residential complex, golf green , sitc of 6 kwp capacity hybrid rooftop solar power plant at sbi officers residential complex, salt lake - sitc of ongrid hybrid solar plants at various branches under sbi lho kolkata | quantity - 9. The estimated project cost is ₹0.2 Cr, with an EMD of ₹0 Cr. Interested bidders can submit applications until 28 September 2026, with the technical opening scheduled for 28 September 2026.
Loading.....
The EMD is ₹19.6 Thousand.
Bids close on 28 September 2026; bid opening is on 28 September 2026.
State Bank Of India, West Bengal.
₹19.56 Lakh.