supply & other work - ms nut & bolt off size, stay clamp for sp 23 double end, earth wire clamp for sp-23 with n/b, pp & clamp with n&b st pole sp-23, stay insulator 75x90 mm, bracing clamp top for sp-23 with n/b, bracing clamp bottom for sp-23 with n/b, erection of earthing rod, fabrication of steel, excavation of pit for stay set, erection of 11 kv stay set, grouting of stay set, excavation of pit for pole, erection of sp-23 double pole, grouting of pole, muffing of pole, dismantling of 25
a dtr, painting of sp-21/23 pole, inst. of 25 kva dtr on pole structure, laying of rabbit conductor in ht line, lopping & choppingof tree branches, cartage sp-21/23 pole, 101-150km, cartage of petty material,101-150km, headload cartage sp-21/23 pole(0-1 km), headload cartage of material(0-1 km), headload cartage of 25 kva dtr(0-1 km) for shifting 25 kva t/f at vill rikwasi to road side and ht line construction under edsd molekhal under head capital 2025-26.
Tender247 tries to ensure accurate & authentic tender information at its level best however it cannot be held responsible for Omissions, Errors, etc. Users are advised to refer to Tender Document published by Procuring entity before participating / submitting bid.