Submission Date
28 SEP 2026Opening Date
28 SEP 2026Tender Estimated Cost
₹ 20.78 Cr.EMD
Refer DocumentTender Document Fees
Refer DocumentPrepare a complete bid response for this tender in under 30 minutes.
0000_xyzw_00000_0
Transmission Corporation Of Andhra Pradesh Limited has invited bids for the supply, erection, testing and commissioning of (i) 132/33kv substation at sri city, satyavedu mandal in tirupati district (ii) 132kv dc line from 220/132kv ss racherla to proposed 132/33kv ss sri city, duly stringing 2nos. circuits on existing 132kv racherla-m/s. daikin air conditioning india ltd, mc line for a length of 7.5km and 2.5km of new 132kv dc line (iii) 2nos. 132kv feeder bays at 220/132kv ss racherla (cherivi) for proposed 132kv ss sri city feeders on turnkey basis. The estimated project cost is ₹20.78 Cr. Please refer to the tender document for EMD details. Interested bidders can submit applications until 28 September 2026, with the technical opening scheduled for 28 September 2026.
Loading.....
Please refer to the tender document for EMD details.
Bids close on 28 September 2026; bid opening is on 28 September 2026.
Transmission Corporation Of Andhra Pradesh Limited, Andhra Pradesh.
₹20.78 Cr.