supply of - 2u chassis based 16 port xpon olt with 16x10g xpon gpon ports class , gpon epon wi-fi 6 ont, 4xgbe lan, 1 phone port, 802 11ax dual band , nms controller software- olt ont management, 3rd party ont support , layer 3 distribution switch, 28x10g sfp,dual psu, loaded with 8 lr sfp , 1 16 plc splitter in uv-resistant fde ip54, sc apc, splice tray , 1 4 plc splitter in fde ip54, sc apc connectors and adaptors , 2u 48 port liu with s tray, sc apc adpt pigtails 24 lc-sc sc-sc pc , outdoor
-way joint enclosure for 24-core ofc , uv resistant 24 port 4 way outdoor wall mount fdb, sc apc pigtails, ip65 , 2 meter sc sc apc sm armored simplex patch cords 5mm , 1 meter sc sc apc sm armored simplex patch cords 5mm , 2-core ftth terminal box , 24-core sm armored fiber cable, steel tape, itu-t g 652 d, 2500n tensile , 6-core sm armored fiber cable, steel tape, itu-t g.652.d, 2500n tensile , 2-core sm armored fiber cable, steel tape, itu-t g.652.d , hdpe pipe 32mm , hdpe duct coupler and end plugs , pvc channel-conduit uv-treated 25mm , sc-apc pigtails , sc-sc-apc patch cords 3 mtr , gi route markers along fiber route , 3-mtr octagonal pole 5mm thick with 400x400x900mm rcc foundation m20 , digging and refilling - soft soil 300x300mm , digging and refilling - hard soil 300x300mm , laying hdpe pipes in approved route , laying 24-core fiber optic cable in hdpe pipes , instal fixing of pvc cond on wall laying of armd fiber in conduit inside , termination of 2-core fiber to ftth terminal box on wall , installation of route markers on fiber path , fixing outdoor splitter and distribution encl on existing wall etc , otdr loss testing of all backbone fiber links and splitter links , optical power measurement and loss report , as-built drawings autocad and pdf, onsite training and handover docs - sitc and maintenance of gpon xpon based network connectivity at abviiitm campus | quantity - 37495
Description : - 2u chassis based 16 port xpon olt with 16x10g xpon gpon ports class , gpon epon wi-fi 6 ont, 4xgbe lan, 1 phone port, 802 11ax dual band , nms controller software- olt ont management, 3rd party ont support , layer 3 distribution switch, 28x10g sfp,dual psu, loaded with 8 lr sfp , 1 16 plc splitter in uv-resistant fde ip54, sc apc, splice tray , 1 4 plc splitter in fde ip54, sc apc connectors and adaptors , 2u 48 port liu with s tray, sc apc adpt pigtails 24 lc-sc sc-sc pc , outdoor 3-way joint enclosure for 24-core ofc , uv resistant 24 port 4 way outdoor wall mount fdb, sc apc pigtails, ip65 , 2 meter sc sc apc sm armored simplex patch cords 5mm , 1 meter sc sc apc sm armored simplex patch cords 5mm , 2-core ftth terminal box , 24-core sm armored fiber cable, steel tape, itu-t g 652 d, 2500n tensile , 6-core sm armored fiber cable, steel tape, itu-t g.652.d, 2500n tensile , 2-core sm armored fiber cable, steel tape, itu-t g.652.d , hdpe pipe 32mm , hdpe duct coupler and end plugs , pvc channel-conduit uv-treated 25mm , sc-apc pigtails , sc-sc-apc patch cords 3 mtr , gi route markers along fiber route , 3-mtr octagonal pole 5mm thick with 400x400x900mm rcc foundation m20 , digging and refilling - soft soil 300x300mm , digging and refilling - hard soil 300x300mm , laying hdpe pipes in approved route , laying 24-core fiber optic cable in hdpe pipes , instal fixing of pvc cond on wall laying of armd fiber in conduit inside , termination of 2-core fiber to ftth terminal box on wall , installation of route markers on fiber path , fixing outdoor splitter and distribution encl on existing wall etc , otdr loss testing of all backbone fiber links and splitter links , optical power measurement and loss report , as-built drawings autocad and pdf, onsite training and handover docs
16
Days Left
Submission Date
03 OCT 2026
Opening Date
03 OCT 2026
Tender Estimated Cost
₹ 79.58 Lakh
EMD
₹ 3.98 Lakh
Apply with Surety Bond
Tender Document Fees
Refer Document
AI Bid Assistant
Prepare a complete bid response for this tender in under 30 minutes.
Tender247 tries to ensure accurate & authentic tender information at its level best however it cannot be held responsible for Omissions, Errors, etc. Users are advised to refer to Tender Document published by Procuring entity before participating / submitting bid.