supply of - a. dismantling disposal and civil works - dismantling and disposal of existing facility , civil work - wall repair and repainting , b. clean room panel system walls ceiling and flooring - wall cladding - partition panel system , coving at wall-to-wall wall-to-ceiling and floor-to-wall junctions , ra return air riser at partition base , rcc beam and ceiling cladding - return air plenum areas , false ceiling , esd anti-static pvc vinyl flooring , double-glazed vision - view panels ,
uble-glazed vision - view panels - count , c. doors - clean-room compatible doors general - equipment movement , emergency exit door , face-biometric access control system at main entry , d. lighting and fixtures - clean-room grade led light fixtures , e. hvac system - ahu - treated fresh air tfa unit - supply installation testing and commissioning , ductwork - gi-aluminium- insulated- clean- room compatible , terminal hepa fan filter units -ffu , exhaust air system - chemical room , f. electrical- power- gas and plumbing services - electrical switches - 16-5a- wall-mounted , three-phase power connection points , wiring and fixtures , power backup - dedicated ups port , grounding system - copper strip , gas line - commercial nitrogen -n2 , gas line - compressed air , gas line - blank- spare line , water chiller inlet and outlet piping , process chilled water -pcw- piping network , ss316 ep tubing for gases with fittings , user utility points -water- gas- air- with fittings , g. building management system -bms- bms - central monitoring station , direct digital control -ddc- panel , field and room sensors with cabling , bms integration- programming and validation , h. electrification -distribution and luminaires- distribution boards -lighting- power- ups-emergency , cable management system , wires- cables- lighting- power- lan and communication , switch-sockets and mcbs , clean-room bottom-accessible led luminaires , led luminaires - grey- plenum areas , i. safety and surveillance systems - smoke detection system , electronic surveillance -cctv- system , biometric access control system , j. furniture and fixtures - air shower -if required , cross-over bench with shoe rack underneath , dressing cupboard , dry nitrogen and water gun , esd-compatible work table , ss stools , clean-room compatible chairs , emergency eye wash cum safety shower , shoe cover dispenser , k. utility systems - air curtain at clean room entry , motion sensor cctv cabling , fire alarm and smoke detector relocation , l. post-installation testing- validation and certification - clean room - hvac validation and performance qualification - renovation | quantity - 2981
Description : - a. dismantling disposal and civil works - dismantling and disposal of existing facility , civil work - wall repair and repainting , b. clean room panel system walls ceiling and flooring - wall cladding - partition panel system , coving at wall-to-wall wall-to-ceiling and floor-to-wall junctions , ra return air riser at partition base , rcc beam and ceiling cladding - return air plenum areas , false ceiling , esd anti-static pvc vinyl flooring , double-glazed vision - view panels , double-glazed vision - view panels - count , c. doors - clean-room compatible doors general - equipment movement , emergency exit door , face-biometric access control system at main entry , d. lighting and fixtures - clean-room grade led light fixtures , e. hvac system - ahu - treated fresh air tfa unit - supply installation testing and commissioning , ductwork - gi-aluminium- insulated- clean- room compatible , terminal hepa fan filter units -ffu , exhaust air system - chemical room , f. electrical- power- gas and plumbing services - electrical switches - 16-5a- wall-mounted , three-phase power connection points , wiring and fixtures , power backup - dedicated ups port , grounding system - copper strip , gas line - commercial nitrogen -n2 , gas line - compressed air , gas line - blank- spare line , water chiller inlet and outlet piping , process chilled water -pcw- piping network , ss316 ep tubing for gases with fittings , user utility points -water- gas- air- with fittings , g. building management system -bms- bms - central monitoring station , direct digital control -ddc- panel , field and room sensors with cabling , bms integration- programming and validation , h. electrification -distribution and luminaires- distribution boards -lighting- power- ups-emergency , cable management system , wires- cables- lighting- power- lan and communication , switch-sockets and mcbs , clean-room bottom-accessible led luminaires , led luminaires - grey- plenum areas , i. safety and surveillance systems - smoke detection system , electronic surveillance -cctv- system , biometric access control system , j. furniture and fixtures - air shower -if required , cross-over bench with shoe rack underneath , dressing cupboard , dry nitrogen and water gun , esd-compatible work table , ss stools , clean-room compatible chairs , emergency eye wash cum safety shower , shoe cover dispenser , k. utility systems - air curtain at clean room entry , motion sensor cctv cabling , fire alarm and smoke detector relocation , l. post-installation testing- validation and certification - clean room - hvac validation and performance qualification
12
Days Left
Submission Date
29 SEP 2026
Opening Date
29 SEP 2026
Tender Estimated Cost
Refer Document
EMD
₹ 5.00 Lakh
Apply with Surety Bond
Tender Document Fees
Refer Document
AI Bid Assistant
Prepare a complete bid response for this tender in under 30 minutes.
Tender247 tries to ensure accurate & authentic tender information at its level best however it cannot be held responsible for Omissions, Errors, etc. Users are advised to refer to Tender Document published by Procuring entity before participating / submitting bid.