Submission Date
20 OCT 2026Opening Date
20 OCT 2026Tender Estimated Cost
Refer DocumentEMD
₹ 12.55 LakhTender Document Fees
Refer DocumentPrepare a complete bid response for this tender in under 30 minutes.
0000_xyzw_00000_0
Integral Coach Factory has invited bids for the supply of a. one coach set of side wall complete for mrm3/tc2 to drg no 99714001, alt 'nil' - 1 n o. b. one coach set of roof complete for mrm3/tc2 to drg no 99516001, alt 'nil' - 1 no. firm shall f ulfill the manufacturing facility as per icf/md/specn-200, issue status-01, rev-04 with am endment no 01. special condition : packing as per icf/j&t/misc-2201,alt 'f'. "there will be min or modifications in design. firm shall obtain the final drawings before manufacturing". [safety item] [ warranty period: 30 months after the date of delivery ] [quantity tolerance (+/-): 5 %age , item category : normal , total po value variation permitt ed: max 8 lacs ] ] - c/s of side wall and roof complete (km tc rvnl)., with an EMD of ₹0.13 Cr. Please refer to the tender document for project value details. Interested bidders can submit applications until 20 October 2026, with the technical opening scheduled for 20 October 2026.
Loading.....
The EMD is ₹12.55 Lakh.
Bids close on 20 October 2026; bid opening is on 20 October 2026.
Integral Coach Factory, Tamil Nadu.