Submission Date
23 SEP 2026Opening Date
23 SEP 2026Tender Estimated Cost
Refer DocumentEMD
Refer DocumentTender Document Fees
Refer DocumentPrepare a complete bid response for this tender in under 30 minutes.
0000_xyzw_00000_0
Integral Coach Factory has invited bids for the supply of hot finished seamless tube 152.4 od/9.52mm thick with plain ends in specific length of 5.9 mtrs and excess length in multiples of 0.235 mtrs upto a maximum length of 7.075 mtrs to specn. is:1161-98 with amendment no.1 or latest to 5 hfs quality to grade yst 210 with plain carbon steel and carbon equivalent of 0.39% maximum. i) the requirement of percentage of carbon to be 0.14 t0 0.22 with hardness of 140 to 170 hb ii) the material should be easily machinable special condition : suitable packing to be done t o avoid damage during transit, unloading and rust prevention during storage. [ warra nty period: 30 months after the date of delivery ] [quantity tolerance (+/-): 5 %age , item category : normal , total po value variation permitt ed: max 8 lacs ] ] - hot finished seamless tube.. Please refer to the tender document for project value and EMD details. Interested bidders can submit applications until 23 September 2026, with the technical opening scheduled for 23 September 2026.
Loading.....
Please refer to the tender document for EMD details.
Bids close on 23 September 2026; bid opening is on 23 September 2026.
Integral Coach Factory, Tamil Nadu.