corrigendum : supply of igbt based 3-phase drive propulsion equipment with physical medium i.e. esd/emd/ ofg for multi - functional vehicle bus (mvb) as per iec 61375, terminal bracket, busbar link and cu braid required for connection between main transformer and tractionconverter, auxiliary converter, interfacing connectors, cables and cable loom required for connection from vcu1/2 to sb1/2 panel. as per spec. no. i) rdso/2008/el/spec/0071,rev.5 for igbt based 3-phase drive propulsion
, ii) clw/es/3/0458 alt.e for control cables, iii) clw/es/3/0459 alt. c for screened cable, iv) clw/es/3/0124 alt. o . in addition to above description, the propulsion system should also comply requirement mentioned in "schedule of requirement" (sor), copy attached with tender documents. annual maintenance for three (03) years will be as per comprehensive annual maintenance specification no. clw/amc/c-d&d/01 issued in march 2016 (warranty period : upto 72 months from the date of delivery.) [ warranty period: 72 months after the date of delivery ] ]
Description :igbt based 3-phase drive propulsion equipment with physical medium i.e. esd/emd/ ofg for multi - functional vehicle bus (mvb) as per iec 61375, terminal bracket, busbar link and cu braid required for connection between main transformer and tractionconverter, auxiliary converter, interfacing connectors, cables and cable loom required for connection from vcu1/2 to sb1/2 panel. as per spec. no. i) rdso/2008/el/spec/0071,rev.5 for igbt based 3-phase drive propulsion equipment, ii) clw/es/3/0458 alt.e for control cables, iii) clw/es/3/0459 alt. c for screened cable, iv) clw/es/3/0124 alt. o . in addition to above description, the propulsion system should also comply requirement mentioned in "schedule of requirement" (sor), copy attached with tender documents. annual maintenance for three (03) years will be as per comprehensive annual maintenance specification no. clw/amc/c-d&d/01 issued in march 2016 (warranty period : upto 72 months from the date of delivery.) [ warranty period: 72 months after the date of delivery ] ]
1
Day Left
Submission Date
19 SEP 2026
Opening Date
19 SEP 2026
Tender Estimated Cost
Refer Document
EMD
₹ 50.00 Lakh
Apply with Surety Bond
Tender Document Fees
Refer Document
AI Bid Assistant
Prepare a complete bid response for this tender in under 30 minutes.
Tender247 tries to ensure accurate & authentic tender information at its level best however it cannot be held responsible for Omissions, Errors, etc. Users are advised to refer to Tender Document published by Procuring entity before participating / submitting bid.