Submission Date
20 OCT 2026Opening Date
20 OCT 2026Tender Estimated Cost
Refer DocumentEMD
₹ 9.67 LakhTender Document Fees
Refer DocumentPrepare a complete bid response for this tender in under 30 minutes.
0000_xyzw_00000_0
Integral Coach Factory has invited bids for the supply of shell kit for rapid metro c shell a) sidewall complete to drg no (573)icf/mrv c/c/bt-1-4-001, alt'f' - col-i -1 no (573)icf/mrvc/c/bt-1-4-001, alt'f' - col-ii 1 no roof assembly t o drg no 77216001, alt 'nil' - col-i 1 no. the firm shall fulfil the requirement as per icf/md/specn. 2 00, issue status 01, rev 04 with amendment no 01. b) end wall to drg no (616) emu/c/3ph-1-5-0 01-alt 'f'-col-i -1no (616) emu/c/3ph-1-5-002-alt 'd'-col-i -1no the firm shall fulfil the require ment as per icf/md/spec-315,issue status-01, rev.00, amendment no 01. c) under frame to dr g no (573)icf/mrvc/c/bt-1-1-001, alt'k' col-i- 1 no the manufacturing facility as per icf/md/s pec-147, issue status-01 rev.02 with amendment no.02. d) body shell items to drg no (717)emu /c/mmts-1-0-002, alt 'a' col-i-1 no supply condition: back pieces for seats, partition frame & grab pole to drg no (717)emu/c/mmts-1-0-002, alt 'a' col-i-1 no, to be welded on under frame and suppli ed. special condition : a) packing as per icf/j&t/misc-2201, alt 'f', b) packing as per icf/j&t/sk- 1809, alt 'a'. c) packing condition as per drg.no.icf/j&t/misc-2487, alt 'b' the under frame should be supplied as normal side up & side bearer side down d) packing condition as pe r icf/j&t/sk-1865, alt "a". note: application of aluminium welding coat to rcf spec mdts-28272 lates t revision on top surface of cross members shall be ensured before welding the trough floor with cross members to avoid bi-metallic corrossion. [safety item] [ warranty period: 30 months after the dat e of delivery ] [quantity tolerance (+/-): 5 %age , item category : normal , total po value variation permitt ed: max 8 lacs ] ] - shell kit (rapid metro c)., with an EMD of ₹0.1 Cr. Please refer to the tender document for project value details. Interested bidders can submit applications until 20 October 2026, with the technical opening scheduled for 20 October 2026.
Loading.....
The EMD is ₹9.67 Lakh.
Bids close on 20 October 2026; bid opening is on 20 October 2026.
Integral Coach Factory, Tamil Nadu.