FILTERS
corrigendum : construction of sarkhej-dholera semi high-speed double railway line, including spur lines to lothal nmhc and dholera airport terminal; comprising civil works, which includes formation & viaduct, bridges, station buildings, & associated works; track system (ballasted & blt), overhead traction system including electrical general services; signalling & telecommunication system, operating control centre, integration of all systems complete in all respect including testing & commissioning and all appurtenant works under jurisdiction of western railway
View Insights
corrigendum : nhidcl/meghalaya/ hsc/package-03/2026 - development, maintenance, management and operation of greenfield high-speed corridor from mawlyngkhung (near shillong) in meghalaya to panchgram (near silchar) in assam by 4-laning with paved shoulders on hybrid annuity basis. (package-3)
corrigendum : construction of the new integrated high court complex on plot bearing ct.s. no. 629/1234/a/1 at bandra government colony bandra (e)mumbai. epc (engineering, procurement and construction)
engineering procurement and construction (epc) of construction of viaducts, ror/rfo, major bridges, minor bridges, animal underpass, rub/lhs, tunnel/cut- cover, earthwork, blanketing, trolley refuge, turfing, buildings, retaining wall, toe wall etc. and other associated worksfor construction of new double line track for dfcc loading from ch.158.00 to ch.184 in koderma detour section in sonnagar- andal 3rd and 4th line project on epc mode in dhanbad division of east central railway.
development of high-speed access controlled greenfield corridor from shamli-gorakhpur from ch. 510.700 to ch.579.950 in the state of uttar pradesh on ham mode (package-10) (design length 69.25 km.)
construction of elevated corridor from yeshwanthapura (methikere cross) to old madras road (tin factory junction kr puram) via iisc - mekri circle - jayamahal - st. john church road - ulsoor lake (3 lane x 2 flyover) in bengaluru city on boot (toll) mode - dynamic duration
development of greenfield high-speed access controlled corridor from shamli-gorakhpur from ch.143.100 to ch.212.600 in the state of uttar pradesh on ham mode (package-3)
development of greenfield high-speed access controlled corridor from shamli gorakhpur from ch. 274.000 to ch. 348.039 in the state of uttar pradesh on ham mode (package-6)
corrigendum : development of link connector corridor between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg2 from km7.926-km18.560 (tl 26.039km mcw fob loop ramp) in up on ham
corrigendum : development of link / connector corridor between national highway-19 (nh-19) and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city package 1 from km 0+000 to km 7+926 (total length is 20.000 km including mcw /loop/ramp/link road) in the state of uttar pradesh on hybrid annuity mode
development of greenfield high-speed access controlled corridor from shamli gorakhpur from ch. 212.600 to ch. 274.000 in the state of uttar pradesh on ham mode (package-5)
development of greenfield high speed access controlled corridor from shamli gorakhpur from ch. 84.500 to ch. 143.100 in the state of uttar pradesh on ham mode (package 2)
development of greenfield high-speed access controlled corridor from shamli gorakhpur from ch. 348.453 to ch. 422.500 in the state of uttar pradesh on ham mode (package7)
corrigendum : 55262-002-ind jharkhand action for generating responsive and inclusive transformations in health infrastructure (jagriti) - jagriti/rims2/cw/01 construction of 2,800 bedded phase-i (1400 beds)multi specialty teaching hospital cum medical college at ranchi (jharkhand), india (design and build contract)
construction of elevated corridor from marenahalli main road (ragigudda junction) to kanakapura main road via bwssb pipeline road (thalaghattapura junction) in bengaluru city on boot (toll) mode dynamic duration
corrigendum : construction of civil works of barrage and stilling basin, u/s plastic cutoff trench, power intake structures, tunnel, outfall structure, associated hm works including adit plug, etc and associated works of link-3 project in himachal pradesh
corrigendum : const. of 4l gf corridor ghazipur zamania saiyad raja of nh24 old nh97 with extens. up to varanasi ranchi kolkata corridor km 0.000 to km 51.850 tl 51.850 km in uttar pradesh on ham mode pkg ii
corrigendum : development, operation and maintenance of the pm mitra mega textile and apparel park at lucknow, uttar pradesh through public private partnership (ppp) on design, build, finance, operate and transfer (dbfot) basis. - development, operation and maintenance of the pm mitra mega textile and apparel park at lucknow, uttar pradesh through public private partnership (ppp) on design, build, finance, operate and transfer (dbfot) basis
corrigendum : development of high-speed access controlled greenfield corridor from shamli gorakhpur from ch. 422.500 to ch.466.000 in the state of uttar pradesh on ham mode (package8) (design length 43.500 km.).
corrigendum : rfp for development of a link / connector corridor connecting the national highway31 (nh-31) & varanasi ring road, along the river varuna for decongestion of varanasi city package 2 from km 11+744 to km 19+420 (total length is 14.720 km including mcw/loop/ramp) in the state of uttar pradesh on hybrid annuity mode.