FILTERS
composite work (civil, electrical & s&t) comprising formation, viaducts, minor/major bridges, rubs/subways, station buildings, staff quarters, platforms, passenger amenities, supply & spreading of ballast, track linking and p-way works, along with design, supply, erection, testing & commissioning of 25 kv ac ohe and supply, installation, testing & commissioning of telecom outdoor systems including trenching, laying, blowing, splicing & jointing of 48f x 2 ofc on both sides of the track, one-side quad cable, emergency communication system and other associated works between jamaniya (excluding) to tirla (excluding) from km 125.92 to km 147 (21.08 km) in connection with the chhotaudepur-dhar new broad gauge line project in vadodara division of western railway.
View Insights
corrigendum : gunupur-theruvali new bg line project : design and construction of new bg railway line from km 122.750 to km 141.940 (excluding rcc box, rob br. no 388 from km 137.725 to 137.925 but including p way & ohe works) involving 08 nos of tunnels (t-2 to t-9) & from km 110.02 to km 113.12 involving 1 no tunnel(t-1), blt works & its approaches and earthwork in formation in embankment/cutting, blanketing, side drains, catch water drains, minor bridges, major bridge, road over bridge (robs), road under bridge (rubs), protection works, p.way track works with contractor's own material supplies including supply of track ballast, new wide based psc sleeper, special psc sleepers (for turnouts, improvised sejs, guard rails etc), point (thick web switches & wcms crossing, glued joints, h- beam/ composite sleepers over girder bridges, improvised sejs, all p-way fittings, ohe foundations, supply and erection of ohe masts, provision of 1x25 kv conventional type ohe (ohe-22.660tkm) including 2.86 km rocs in tunnel, provision of one feeding post (tss) modifications/conversion to underground for overhead electrical ht/lt power line crossings, construction of platforms, station buildings, fob, service buildings, sp/ssp buildings and residential buildings, water supply, indoor and outdoor electrification works etc in waltair division of east coast railway.
jeypore - nabarangpur new bg railway line project: design & construction of new bg railway line between ambaguda(excluding) (13.60 km) to nabarangpur(including) (43.996km) involving earthwork in formation in embankment/cutting, blanketing, side drains, catch water drains, minor bridges, major bridges(excluding bridge no. 85 at km. 37.080 i.e. indravati bridge), road over bridges (robs), road under bridges (rubs), protection works, p.way track works with contractor's own material supplies including supply of track ballast, new wide based psc sleepers, special psc sleepers (for turnouts, improvised sejs, guard rails etc), points (thick web switches) & wcms crossings, glued joints, h-beam/composite sleepers over girder bridges, improvised sejs, all p-way fittings, 2x25 kv ac ohe works, 2x25 kv tss with sp/ssp works along with scada, modification/conversion to underground for overhead electrical ht/lt power line crossings, electrical general services, construction of platforms, station buildings, service buildings, sp/ssp buildings, trd depot building with tower wagon shed, residential buildings, water supply, indoor and outdoor electrification etc. on epc basis in rgda division of east coast railway"
earthwork in formation, construction of major & minor bridges, retaining wall, drains, supply of ballast, p. way materials & track linking works, construction of building and allied works from ch 9/190 km (take-off) to ch 15/342 km (de) in connection with proposed siding for the work of rail connectivity for proposed phase-ii silo (02 nos. -20mty) at lakhanpur area of mcl at jharsuguda, odisha. pkg-ii
scr construction organization- nanded division- proposed yard arrangements at dinegaon yard from km. 167.500 to 170.200 (2.70kms) and jalna yard at km. 174.975 to 177.450 (2.475kms) (total:5.175kms) in connection with proposed doubling of track from chhatrapati sambhaji nagar to parbhani stations and as a part of jalna- jalgaon newline: execution of earth work in formation, construction of minor bridges, fob, station building, rbg rooms, goompties, staff quarters, high level platform, collection of ballast, transportation of p.way materials, laying and linking of track and other connected miscellaneous works etc
balance work of earthwork in cutting and filling in embankment with mechanical compaction, supplying, spreading and compaction of stone dust blanketing, extension of minor bridges, construction of gate lodge, extension of level crossing gates, retaining wall, demolition of infringing structures, linking of track, points & crossing, supplying, stacking & spreading of machine crushed stone ballast, transporting of p. way materials and other ancillary works from ch-48.940km. at kalyani (excluding) to ch-71.588 at ranathat (excluding) in connection with construction of 3rd line between naihati & ranaghat.
supplying of 65 mm gauge machine crushed railway track ballast in stacks &loading same ballast into railway ballast hoppers at haralaya ballast depot of jodhpur division.
provision of ballast less track at line no. 01 & 03 of patna saheeb station and line no. 02 & 03 of fatuha station under jurisdiction of sr.den/track/dnr of danapur division
supplying and stacking of 75,000 cum of machine crushed track ballast 50mm size from recognized quarry conforming to rdso's & specification for track ballast in stack measurement and loading the same into any type of railway wagon at jhajha ballast siding under danapur division.
ajj-jtj, ajj-ru & cgl-ajj sections: collection and supply of 50mm size machine crushed stone ballast at ajj ballast depot including loading into bkh wagons & unloading from bkh wagons for various track works.
widening, strengthening, interlocking tiles and construction of r.c.c. roads and drains at i.a. sector-22 meerut road, ghaziabad.
supply of ballast (i) at cess for new track from neyyatinkara (excluding) to parassala (including) stations (ii) at eraniel depot/nanguneri depot/ valliyur depot/any other depot within the lead specified in connection with doubling of track between thiruvananthapuram - kanniyakumari project.
supplying and stacking, loading and unloading of 54000cum of 65 mm gauge machine-crushed hard stone ballast conforming to railway specification is/rdsoge/0001:2023 (february 2023) and latest correction slips, from ramkumarpura mining area, village ramkumarpura, tehsil khetri, district jhunjhunu, rajasthan, or khanak mining area (under the control of hsiidc), tehsil tosham, districtbhiwani, haryana, or any other mining source producing similar quality machine crushed hard stone ballast as above, at cess/bank in c/w 3rd & 4th line between tilak bridge - anand vihar railway station.
supply, delivery and stacking of 1,00,000 cum 50mm gauge machine crushed track ballast as per railway's specification at saragbundia (srba) depot from outside railway land and loading into railway wagons under the jurisdiction of aden/champa of bilaspur division.
construction of 24 nos. type-iii residences stilt floor to six floor, sub station, external electrical work, c.c. road, drain, interlocking. rain water harvesting, 16 persons lift and 250kva d.g. set at jagadguru rambhadracharya divyang state universit
supply, stacking and spreading of 29000 cum machine crushed, hard granite stone ballast of 65mm gauge in various yards and locations between prayagraj-kanpur section under the jurisdiction of sr. divisional engineer/ii/prayagraj.
corrigendum : renovation works including installation of ms angles, ms chain, hook, tiles, stone, railing on public ghats situated in har ki paudi area and along right and left banks of upper ganga canal, mayapur escape channel and ghats situated in dhudhiyabundh
supplying, stacking and loading of 65mm machine crushed hard and durable track stone ballast as per rly's specification for track ballast is/rdso-ge/0001:2023 including all lead, lift, taxes, royalties, duties etc. at khanna banjari depot under assistant divisional engineer (maintenance) katni sub division
recarpeting of bituminous concrete roads, construction of cement concrete roads, and development of footpaths with ipb tiles in sector 22a, ward no. 3, division 3a, under mcg.
vm ballast depot- collection, supply and training out of machine crushed track ballast in sr.den/north/tpj jurisdiction.
supply of 60,000 cum 65 mm gauge stone ballast (mechanically broken) and loading into rail rakes/bobs at the goods siding, hoshiarpur on jrc-hsx section under aden/jrc.
supply and stacking of 50,000 cum machine crushed track ballast as per railway's specification at sikir depot from outside railway land/quarry and loading into railway's wagons under the jurisdiction of aden/titlagarh of sambalpur division.
supply of ballast in various yards i.c.w. improvement in various yards of sse/p.way/ldh under aden/ldh in the jurisdiction of sr. den-i/fzr
balance work in connection with doubling of track between mangaluru junction and panambur including linking of track, assembling and insertion of turnouts, supply and dumping of ballast, transportation of p.way materials, welding of track, modification of track etc. for mangaluru junction in palakkad division of southern railway under dyce/c-i/ers.
corrigendum : supply of 0.30 lmt limestone on f.o.r. basis for flue gas desulphurisation system for kstps - supply of 0.30 lmt limestone on f.o.r. basis for flue gas desulphurisation system installed at kstps, kota power plant of rvun as per specifications
"ms-vm sections : collection and supply of 50mm size machine crushed stone ballast at pei ballast depot including loading into bkh wagons & unloading from bkh wagons for various track works.(i) ctr(s) - 1.451 km (ii) ttr(fs+tws+wcmsc)-52 set. (iii) ttr(fs+tws+wcmsc)-9 set (iv) tsr(p)- 11.755 km (v) tsr(s)-5.334 km (vi) ttr(fs+tws+wcmsc)- 115 sets & (vii) ttr(fs+tws+wcmsc)- 87 sets"
supply of 50000 cum 65mm gauge machine crushed stone ballast for bg track duly stacked and loaded in to rail borne trucks/bob's in the ballast depot at dhansu under aden/track/ambala on jakhal-hisar section.
manufacturing, supplying and stacking of machine crushed track ballast in between km: 99.400 to km: 116.654 in connection with taranga hill-abu road via ambaji new bg line project of ajmer division.
sw i: bza - roof repairs and replacement of perished doors, windows and tiles of service buildings in sse/w/east/bza section under aden/buildings/bza jurisdiction.sw ii: (i) : repairs to perished doors, cupboards, mesh doors, compound wall and brightening in officers colony under sse/w/gvpt/bza.(ii): bza- repairs to perished doors, windows, mosquito roof mesh, roof leakage, tiles, drainage and safety grills in traffic, loco and green park colony under sse/w/e/bza section. sw iii: stpm - repairs to drains, rear side compound wall, perished doors, safety grills, mosquito mesh, roof leakages etc., at east (temple) colony in sse/works/stpm under aden/buildings/bza jurisdiction.sw iv: repair works (roof leakage arresting works, repair to perished doors and windows, mesh doors and mesh to windows , repairs to balcony drops and parapet walls and safety grills etc.,) in quarters of winchpet, upyard and traffic colonies in sse/w/west/bza section under aden/buildings/bza jurisdiction.sw v: renovation and conversion of old cash office into sr.dsc/rpf office under sse/w/east/bza section.sw vi: bza- repairs to prem office at drm office compound under sse/w/east/bza section.
p/l interlocking tiles in bir road, guru gobind singh nagar, hazoora kapoora and jivi nagar. chandsar basti. kanhiya nagar, ganesh nagar. paras ram nagar, udham singh nagar, balraj nagar, kheta singh basti, kaka sidhu colony. ram bagh road. kartar basti, kikar dass mohalla. basant vihar, jain street, guru nanak nagar streets at mc bathinda
p/l interlocking tiles in bir road, guru gobind singh nagar, hazoora kapoora and jivi nagar, chandsar basti, kanhiya nagar, ganesh nagar, paras ram nagar, udham singh nagar, balraj nagar, kheta singh basti, kaka sidhu colony, ram bagh road etc.
provision of floor tiles (550 no. qtrs.) & renovation of toilets/bathroom (400 no. qtrs) in type-ii quarters in main colony at rcf, kapurthala.
supplying, stacking and loading into railway hoppers of machine crushed ballast as per revised specification rdso/ irse-ge-i of june 2016 with latest amendment at miraj depot under aden/ mrj's section.
(dhanbad division: tsr (p) -37.769 tkm), tsr(p) with new 60kg psc wider/modifed wider sleeper(bytrt)= 37.769 tkm under the jurisdiction of sr.den/2/dhn.
hubballi division: supply of ballast at kotturu(kty) depot & cess ballast at ginigera(gin) yard in sr.den/east/ubl jurisdiction.
corrigendum : p/l interlocking tiles and const. of ccf streets in various wards of zone no. 3 (p/l interlocking tiles in various street of w.no. 42 in m.c.ptk. (e.cost. 34.99 lacs), p/l interlocking tiles in various street of w.no. 43 in m.c.ptk. (e.cost 36.99 l
repairs to staff quarters like roof leakage, sunshades, doors, windows, cup boards, fly proof mesh, floor tiles ,periodical paintings etc. under the jurisdiction of aden/psa.
construction of interlocking tiles on damaged internal roads in sumeru vihar, village selaqui, village ummedpur, village ambiwala, village thakurpur, and village khusalpur, within the sahaspur constituency of dehradun district, under the state sector.
replacement of full set of t/out, switches & sleeper sets work of 51 nos i.e. ( 38 nos 60kg 1 in 12 turnout) & (13 nos. 60 kg 1 in 8.5 turnout) in c/with " ttr(fs cs cmsc) - 54 sets, ttr tws 4 set ttr (tsr) 22 sets & ttr(tws+wcmsc) - 23 sets on psc sleepers" in ceu, jrc, scpd, awl,kkl, kupr, nas & hsx yards under aden-jrc.
construction of rcc drain and interlocking tiles work at harsha compound,loni road, site-2, distt. ghaziabad.
1) works in hapur district under the infrastructure head, comprising: strengthening of the road from eidgah road to shivgarhi; strengthening of the road from the hapur-bulandshahr main road (via mohalla masjidpura) to ramgarhi crossing; and park maintenance, drain construction, and interlocking tile installation in ambedkar nagar scheme no. 01, 2) solid waste management services for the developed area (128.11 hectares) of siddharth vihar scheme, ghaziabad, covering door-to-door collection, transportation, and processing (at minimum rates), 3) civil construction work for an overhead water tank with a capacity of 600 kiloliters and a staging height of 26 meters in ajantapuram scheme, ghaziabad. (hindi image)
dhanbad division-tsr(p)-21.274 tkm (tsr/p) with new 60kg psc wider/modified wider sleeper in the jurisdiction of aden(2)/dhn.
maintenance/ upgradation of bituminous concrete road and interlocking tile works of roads no-4, 5, 6, 7 and 8 of i.a. bhogaon distt- mainpuri.
[i] sbc-jtj section: proposed construction of rub at trespassing location at km 339/300-400 between hdih-kjm stations in aden/sbc sub-division- trd works[ii] sbc-jtj section: proposed construction of pedestrian subway at km.230/000-100 between pu-mar stations in aden/bwt sub-division [iii]recoupment of ballast at tss,sp/ssp and provision of cable trench covers in sbc-jtj section.[iv]bifurcation of elementary section at skpt station and modification of umbrella structures at ypr station. [v]provision of earthing and bonds at ssp/sp,fob and platform shelters in sbc-jtj section.[vi] kjm-augmentation of kjm shed for increasing homing capacity from 175 to 300 electric locomotives-detailed estimate. [vii]ohe modifications in connection with construction of new ac loco trip shed at ypr. [viii] ynk-bwt section: proposed an approach road on lh side in rub 85a at km 96/200-300 between cmy-svs stations [ix] ohe modifications in connection with construction of ac loco trip shed at smvb.
supply of ballast in various yards i.c.w. improvement in various yards under aden- jrc in the jurisdiction of sr. den-i/fzr
reconstruction of road using interlocking tiles on the route extending from melaghat main road via baggha colony to mayur vihar sectors 2, 3, ward no. 09, in khatima constituency of udham singh nagar district under the state plan.
provision of floor tiles (260 no. qtrs.) & renovation of toilets/bathroom (180 no. qtrs) in type-ii & iii quarters in west colony at rcf, kapurthala.
renovation of 2 type iv and 7 type iii quarter building 128 quarters outside roof treatment sanitary water supply door windows tiles etc at baisnabghata patuli staff quarter complex kolkata
dnit for construction of 3 ... - const of 3 no. acrs in gps mandola, const of 4 acrs and girls toilet in ggps jannabad, 6 acrs, interlocking tiles, b/w and toilets in gms gindhokhar and const of 6 acrs, interlocking tiles, b/w and toilets in gms kassauli distt. rewari (under dee)