FILTERS
development of 4/6 lane green field bypass for etmadpur and tundla town on section of agra etawah nh 19 from design km. 0.000 to km. 16.200 in the state of uttar pradesh on epc mode.
View Insights
corrigendum : construction of four lane with paved shoulder of bhagalpur kharhara village (dhaka more) from km 0.000 to km 36.600 (total length 36.600 km) of nh-133e in the state of bihar on epc mode
corrigendum : 4l of kolhapur sangli sec of nh166 from sangli phata km 0.00 to chokak km 7.738 n chokak km 145.300 to ankali km171.171 length33.609 km in maharashtra to be executed on hybrid annuity mode under nh o
corrigendum : upgradation to two lane with paved shoulder of porbandar bhanvad jamjodhpur kalavad section of nh-151k from design km 0.000 to design km 119.500 in the state of gujarat on ham.
upgradation of the missing link of the amritsar jamnagar economic corridor between maliya and pipaliya section of nh151a (length 24.2 km) in the state of gujarat on epc.
corrigendum : bw cons. 4lane gf dake from jalandhar moga road (nh703) to jalandhar-kapurthala road (nh703a) (km 303.900 to 319.400) and jalandhar moga road (nh703) to kapurthala sultanpur lodhi road (nh703a) (km 0 to 24.000) in punjab (p10)
corrigendum : construction and upgradation of existing 2l.ps to 4l with paved shoulder configuration from km 77.000 (near village prithvipur) to km 116.200 (mp/up border near village barahi) of nh-719 in madhya pradesh on hybrid annuity mode (package2).
balance works of 4 lane bangalore chennai expressway from arakkonam to kancheepuram (km 204.500 to km 230.000) (phase iii/package iii) in tamil nadu on epc mode.
corrigendum : construction of 4 lane access controlled bypass to tiruvannamalai town starting from design km 75.150 of new nh38 and ending at design km 88.030 of new nh38 (design length 22.710km) in the state of tamil nadu on epc mode
corrigendum : widening and strengthening of existing 2 lane to 2 lane with paved shoulder from km. 68.600 to km. 162.700 and km. 178.400 to km. 183.732 of nh-326 in the state of odisha under epc mode (package-1)
corrigendum : upgradation to 2 lane with paved shoulders from design km 0.000 to km 48.742 and km 61.732 to km 102.284 of bagasara-una section of nh-351k in the state of gujarat on hybrid annuity mode
corrigendum : upgradation of existing intermediate lane flexible pavement to 2 lane with paved shoulders flexible pavement from km 0.000 (orchha) to km 75.000 (length 75.000 km) on orchha tikamgarh shahgarh nh-539 in the state of madhya pradesh on epc mode
corrigendum : upgradation of chitrod-rapar-balasar section of nh-927c to two-lane with paved shoulders from design km 0.00 to km 57.848 in the state of gujarat on epc mode.
corrigendum : widening and strengthening of stretch from hansdiha (design ch 92.380 km) to chopa more (design km 129.370) of nh-133 to 4 lane with paved shoulder in the state of jharkhand under epc mode
corrigendum : carrying out slope protection works from km 27.410 to km 27.540 and other associated works including construction of approach road, box culvert etc. at melli yard in connection with construction of sivok rangpo new bg railway line project
corrigendum : widening and strengthening of daringbadi ghat portion from km 231.000 to 256.000 (design chainage from km 229.500 to 256.468) of nh-59 under nh(o) in hybrid annuity mode plan 2023-24 in the state of odisha (design length 26.968 kms).
corrigendum : resurfacing of runway alongwith connected works at af station ambala
corrigendum : construction of bypass to the holenarasipura town from km 87.280 near chikknahalli to km 97.580 near hullahalli on nh 373 in the state of karnataka on epc mode under nh o annual plan 2023 24
corrigendum : const.of 4l ac gf alignment of southern bypass to jhansi and cl for nh44 n nh39 from km.16.920 of nh44 near bangay khas vill.dc 0.030 and terminating forming t junc at km6.650 of nh39 near orchha tigela dc15.542 l15.572km in mp and up on epc mode
corrigendum : widening and strengthening of existing 2 lane to 2 lane with paved shoulder from km. 205.373 to km. 311.700 of nh-326 in the state of odisha under epc mode (package-2)
corrigendum : upgradation of shahgarh buxwaha narsinghgarh damoh section of nh-34 (from ch 113/00 to ch 176/500) to 2-lps in the state of madhya pradesh on epc mode
construction of 4 lane mukundra bypass on kota-jhalawar section of nh-52 in the state of rajasthan on epc mode.
upgradation and construction work for nasirabad sarwar kekri road (sh 26) from 2-lane to 4-lane (phase-ii) in the state of rajasthan on engineering, procurement, and construction (epc) basis (total design length 48.419 km).
upgradation and construction work for nasirabad sarwar kekri road (sh 26 from 2 lane to 4 lane (phase-ii) in the state of rajasthan on engineering procurement and construction (epc) (total design length 48.419 km)
provision of infrastructure development works (earthwork in embankment, bridge extension, retaining wall cum boundary wall, road works, etc.) in connection with development of land for proposed poh cum new emu maintenance depot with emu stabling sidings at vangaon (km 112/1 to km 115/1, west side of existing railway tracks between vangaon & dahanu road stations) under mutp iii & mutp iiia.
corrigendum : construction of 6 no. of mangobandhar, kendua,tolesono,jhajha, narganjo and bhairoganj bypasses (total length 19.450 km) along with 2 no. of dlp free sections (total length 21.821 km) to 2l plus ps standard of nh-333a in the state of bihar.
corrigendum : rfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
corrigendum : one time improvement of nh-9 (rohtak road) from punjabi bagh underpass till tikri border in the state of delhi on epc mode
corrigendum : upgradation to 2 lane with paved shoulders of naliya narayan sarovar section from design km 220.773 to km 288.987 of nh 41 in the state of gujarat on epc mode.
corrigendum : construction of 6 lane viaduct and service road from baikampady (km.365.200) to kiocl junction (km.368.275) of nh-66 in the state of karnataka on epc mode
construction of kugging tinali road from km 0.00 to km 36.96 net length 36.96 kms greenfield alignment to nhsl specifications under 1448 bcc 761 brtf in aor of project brahmank in arunachal pradesh on epc mode
upgradation of all gravel and wbm roads to bt/cc and taking up end-to-end pavements with allied infrastructure both in high and medium density areas of gvmc
corrigendum : rehabilitation and upgradation of nh 548b from km 289.300 to km 342.890 maharashtra karnataka border to two lane with paved shoulder configuration in the state of maharashtra on epc mode total length 52.556 km
corrigendum : rehabilitation upgradation and widening of akola to mahan section from km 35.265 to km 64.574 (length 29.309 km) including construction of 4 lane with paved shoulder configuration of barshi takli bypass (length 3.160 km) on nh161a the state of maharashtra on epc mode. length 32.47 km tpc
corrigendum : construction of maski bypass starts at existing km 144.220 and ends at existing km 151.760 and sindhanur bypass starts at existing km 168.370 and ends at existing km 180.800 on nh 150a in the state of karnataka
corrigendum : widening of existing 2 lane to 4 lane with paved shoulder from km 32.950 to km 55.400 (thavar to zerda section of nh-168a in the state of gujarat on epc mode.
corrigendum : const. of 4l from kadur km 256.530 to hasnapur potulamadugu km 267.360 mahabubnagar bypass of hyderabad panaji sec of nh167 l 10.830km under nh o in the state of telangana on epc mode.
corrigendum : public health rajamahendravaram circle - hybrid annuity model (ham) - execution of roads with drains, central medians, street lighting, parks and other development works in 4 urban local bodies of ph rajamahendravaram circle - rjy package -ii covering urban local bodies of east godavari district
public health circle, nellore - urban infrastructure - providing of roads, central medians, street lighting, parks, construction of integrated market complex and other development works in 6 nos urban local bodies of nellore public health circle under hybrid annuity model (ham) in package - 2
corrigendum : construction improvement of road gue pong mha icbr iii from existing new to nhsl specification between km 0pt0 to km 28pt460 total length 28pt460 km on epc mode under 108 rcc hq 759 brtf p roject deepak in the state of himachal pradesh
widening and strengthening/reconstruction work of govindpur-sahebganj adb road (sh-18) from km 139.00 to km 190.930 (total length-51.930 km) road to two lane with paved shoulder under road division dumka for the year 2026-27.
corrigendum : rehabilitation and upgradation of exist 2l to 4l of nh146 from km 0.000 km 158.600 near berkheri vill to km 23.423 km 181.800 near lehdara vill in the state of madhya pradesh on epc mode tl 23.423 km
public health circle, nellore - urban infrastructure - providing of roads, central medians, street lighting, parks and other development works in 11 nos urban local bodies of nellore public health circle under hybrid annuity model (ham) in package - 3
corrigendum : construction of four-lane access control arwal bypass from km 54.200 to km 66.500 (design ch. 67.680) of existing nh-139 on naubatpur- hariharganj road in the state of bihar under epc mode.
corrigendum : widening strengthening and maintenance of selected r and bd roads in the sangareddy 3 package in telangana under hybrid annuity mode phase i package 27 (2nd call)
corrigendum : widening re-construction to four lane from km 0.000 to km 15.870 near miriyan telangana karnataka border chincholi section of nh 167n in kalaburagi district in the state of karnataka on ham under annual plan 2023 24
corrigendum : construction of 4-lane divided cw from nh to electronic city (electronic city approach road) under pernem constituency of pernem taluka
corrigendum : widening to 2 lane with paved shoulder from existing chainage 12.00 to 40.50 (badwala to lakhwar bend) (realignment from km 12.00 to 31.122) on nh-507
design, construction and commissioning of peb sheds, structures, buildings, water supply arrangement, drainage, sewerage, fire fighting works, road works, track works, traversers, shower testing arrangements, static and oh water tanks, tubewells, parking facilities, boundary wall/fencing, eot cranes, supply installation and commissioning of machinery and plant, electric substations, and power supply arrangements, general electrical works, associated telecom & it works etc. i.e. including all civil, electrical, mechanical, it & telecom works in connection with construction of new workshop at rail coach factory (rcf), kapurthala, punjab (india) on epc mode.
construction of road.