FILTERS
corrigendum : request for qualification cum request for proposal for development of the second container terminal at kamarajar port limited under ppp mode on design, build, finance, operate and transfer (dbfot) basis 20th august
View Insights
corrigendum : gunupur-theruvali new bg line project : design and construction of new bg railway line from km 122.750 to km 141.940 (excluding rcc box, rob br. no 388 from km 137.725 to 137.925 but including p way & ohe works) involving 08 nos of tunnels (t-2 to t-9) & from km 110.02 to km 113.12 involving 1 no tunnel(t-1), blt works & its approaches and earthwork in formation in embankment/cutting, blanketing, side drains, catch water drains, minor bridges, major bridge, road over bridge (robs), road under bridge (rubs), protection works, p.way track works with contractor's own material supplies including supply of track ballast, new wide based psc sleeper, special psc sleepers (for turnouts, improvised sejs, guard rails etc), point (thick web switches & wcms crossing, glued joints, h- beam/ composite sleepers over girder bridges, improvised sejs, all p-way fittings, ohe foundations, supply and erection of ohe masts, provision of 1x25 kv conventional type ohe (ohe-22.660tkm) including 2.86 km rocs in tunnel, provision of one feeding post (tss) modifications/conversion to underground for overhead electrical ht/lt power line crossings, construction of platforms, station buildings, fob, service buildings, sp/ssp buildings and residential buildings, water supply, indoor and outdoor electrification works etc in waltair division of east coast railway.
corrigendum : construction of multi-purpose cargo berth (berth no 17) with allied civil works at new mangalore port, on epc basis
construction of special operation training centre at nsg campus manesar gurugram haryana sh construction of administrative block g plus 1 tower block g plus 6 50m modular shooting range shoot house g plus 1 270 degree live firing simlulator boundary walls with entry gates guard rooms etc including all civil and e and m works external development work on epc mode-ii basis subwork/packages: construction of special operation training centre at nsg campus manesar gurugram haryana sh construction of administrative block g plus 1 tower block g plus 6 50 m modular shooting range shoot house g plus 1 270 degree live firing simulator boundary walls with entry gates guard rooms etc including all civil and e and m works external development works on epc mode-ii basis
corrigendum : rectification of curves in the existing emergency landing facility including construction of perimeter roads on both sides of the elf and atc plinth (50m 50m) on chilakaluripeta nellore sec from km 1274.000 to km 1277.600 of nh 16 in ap on epc
corrigendum : composite works of construction of office building (2b plus g plus 12 stories) for delhi pollution control committee with rcc framed structure design including water supply, sanitary installation, internal etc..
corrigendum : construction/improvement of patrolling track (paver block) along bs fence including strengthening of bfl poles and culverts in entire ib under jammu ftr. (sh: works under jammu ftr. in district jammu, samba & kathua on epc mode, package - i, bop paharpur to bop jai kishan). sh: providing detailed third-party quality assurance services.
corrigendum : construction of tourist cum passenger jetty in bishwanath ghat assam
construction of r.o.b in lieu of lc.no.485 -balance left over works on railway portion - superstructure of span no.1 as 1x 25.00 m c/c psc 'i' girder with deck slab, span 2 composite girder with steel 'i' girders with deck slab completed + span 3 to 5 as 3 x 31.00 m c/c psc 'i' girder with deck slab, construction of one left over pier with bed block and construction of approaches (r&b portion) - 6 x 30.0m psc girders on chowdavaram side, 6 x 30.0 m psc girders on visakhapatnam side with re wall on both sides and other miscellaneous works in lieu of lc no.485 (laxmi devi peta gate) at km.745/16-18 between bayyavaram and anakapalli stations at anakapalli yard.
construction of 220/132 kv & 132/33 kv hv & lv hybrid bays, interconnection through xlpe cable, bay swapping, extension of the existing gantry, construction of transformer foundations, and other associated works" at gss darbhanga
construction of 220/132 kv & 132/33 kv hv & lv hybrid bays, interconnection through xlpe cable, bay swapping, extension of the existing gantry, construction of transformer foundations, and other associated works" at gss.
construction of 220/132 kv & 132/33 kv hv & lv hybrid bays, bay swapping and extension of existing gantry, interconnection through xlpe cable, construction of transformer foundations and other associated works at gss darbhanga
design, supply, erection, modification, testing and commissioning of 1x25kv ohe in connection with new line between mahuldiha to bimlagarh including feeder for swss with provision of higer size foundation , mast & super mast for 2x25kv system along with design, supply, erection, modification/augmentation, testing and commissioning of 1x25kv traction substation (tss) at bimlagarh in connection with talcher bimlagarh new bg line under east coast railway.
improvement of alam nagar goods shed with provision of rcc wharf alongwith drainage work & approach road work etc and works of augmentation / upgradation of departmental mechanized laundry like construction of office & store rooms, boiler room shed, boundary walls, road works, drains, rain water harvesting, machine foundation & horticulture works and ancillary works near charbagh under dy ce c-iv lucknow, northern railway.
construction of balance boundary wall, installation of information / caution board, provision of security gate, prefabricated guard room etc. and other misc. works at kanjhawala industrial area.
ner-ljn division:-dal-gd: replacement of 12.2m span steel girder bridges of with 12.20m span psc slab between ljn-gd section under jurisdiction of sr.den/iii/ljn (total 09 bridges)
corrigendum : construction of 6 nos. pile foundations at tower loc. no. 124-127 and 174-175 of 132 kv roing-pasighat transmission line
corrigendum : drainage works (construction of reinforced cement concrete (rcc) drain and provision of precast slab, from hoshiyarpur red light to morna culvert along the mp-3 road, sector-34 side) noida
execution of operation and maintenance works on selected stretches of 4/6l of puintola tangi on nh 16 including construction of drains and repairs of precast drain slabs at location delinked from scope of epc contractor at risk cost of epc contractor
construction of foundation stage children school in shankar vihar at delhi cantt - 10 design and build basis