FILTERS
corrigendum : construction of sarkhej-dholera semi high-speed double railway line, including spur lines to lothal nmhc and dholera airport terminal; comprising civil works, which includes formation & viaduct, bridges, station buildings, & associated works; track system (ballasted & blt), overhead traction system including electrical general services; signalling & telecommunication system, operating control centre, integration of all systems complete in all respect including testing & commissioning and all appurtenant works under jurisdiction of western railway
View Insights
engineering, procurement and construction (epc) agreement for construction of 3rd and 4th railway line adjacent to the existing broad gauge (bg) electrified double line including civil engineering works, track works, signalling & telecommunication works, over head electrification, electrical general services & all other allied works between delhi subjimandi (szm) to ambala cantt (umb) in delhi & ambala divisions of northern railway
construction of new bg double line from kharsia (km 0.00) to balodabazar (km 110.500) and y-connectivity from jharadih including earthwork in formation, bridges, ror (rail over rail), rob (road over bridge), rub (road under bridge), service buildings, staff quarters, p-way works (including supply of ballast, p-way material exept rail), electrification (2x25 kv ohe, psi, plc & electrical general work), and signalling & telecommunication works, along with allied and associated miscellaneous works in connection with kharsia- parmalkasa 5th & 6th new bg line project under south east central railway in the state of chhattisgarh.
composite work (civil, electrical & s&t) comprising formation, viaducts, minor/major bridges, rubs/subways, station buildings, staff quarters, platforms, passenger amenities, supply & spreading of ballast, track linking and p-way works, along with design, supply, erection, testing & commissioning of 25 kv ac ohe and supply, installation, testing & commissioning of telecom outdoor systems including trenching, laying, blowing, splicing & jointing of 48f x 2 ofc on both sides of the track, one-side quad cable, emergency communication system and other associated works between tanda road (excluding) to jamaniya (including) from km 101.29 to km 125.92 (length: 24.63 km) in connection with the chhotaudepur-dhar new broad gauge line project in vadodara division of western railway.
corrigendum : jeypore-malkangiri new bg railway line: design & construction of new bg railway line from km 41.50 to km 69.60 (including nunkhari station) involving earthwork in formation, embankment/cutting, blanketing, side drains, catch water drains, minor bridges, major bridge, road under bridge (rubs), viaducts, tunnels, protection works, blt works, p.way track works with contractor's own materials (except new/sh rails), construction of platforms, station buildings, service buildings, sp/ssp buildings and residential buildings, water supply, indoor and outdoor electrification, provision of 1x25 kv conventional type ohe, tunnel ohe with rocs, tunnel lighting, tss, sp, general power supply arrangements modifications/conversion to underground for overhead electrical ht/lt power line crossings etc on epc basis in waltair division of east coast railway.
corrigendum : package- 3 electro-mechanical works of indirasagar-omkareshwar pumped storage project (8 x 80 mw i.e. 640 mw), district khandwa, madhya pradesh, india - package- 3 electro-mechanical works of indirasagar-omkareshwar pumped storage project (8 x 80 mw i.e. 640 mw), district khandwa, madhya pradesh, india
composite work (civil, electrical & s&t) comprising formation, viaducts, minor/major bridges, rubs/subways, station buildings, staff quarters, platforms, passenger amenities, supply & spreading of ballast, track linking and p-way works, along with design, supply, erection, testing & commissioning of 25 kv ac ohe and supply, installation, testing & commissioning of telecom outdoor systems including trenching, laying, blowing, splicing & jointing of 48f x 2 ofc on both sides of the track, one-side quad cable, emergency communication system and other associated works between jamaniya (excluding) to tirla (excluding) from km 125.92 to km 147 (21.08 km) in connection with the chhotaudepur-dhar new broad gauge line project in vadodara division of western railway.
corrigendum : engineering, procurement and construction (epc) agreement with schedule g-1 for third line track between manikpur (excluding) to iradatganj (including) (ch: 1257.180 to 1340.820) including electrification & signaling works along with construction of rob on lc no. 404/c2, 406/2t, 407/2e & 418c/2e and rub in lc no 426 in connection with manikpur-iradatganj 3rd line project of north central railway
engineering, procurement and construction (epc) contract for quadrupling (laying of new 3rd & 4th lines) of tracks between sulehali west and kurugunta (kqt) stations including electricfication and signalling &telecommunication works in connection with wadi-secunderabad quadrupling project in the state of karnataka.
pre-bid assistance for preparation of priced boq for the tender- construction of new railway bg line in km 28.970 to 42.040 in between kulthana station (including) and rajpura station (including) earthwork, minor bridges (03 nos) and major bridges (07 nos), station buildings, tunnels (7 nos) and mega bridge (03 nos) including electrification in connection with ratlam mhow khandwa gauge conversion in the state of madhya pradesh
construction of gpra at amaravati, the new capital city of andhra pradesh. sh: planning, designing and construction of 1504 residential quarters comprising 600 type-ii quarters in 3 towers ( g plus 24 each), 600 type-iii quarters in 3 towers ( g plus 24 each), 228 type-iv quarters in 3 tower ( g plus 18 each), 56 type-v quarters in 1 tower ( g plus 13) and 20 type-vi quarters in 1 tower ( g plus 9), with a common double basement, ancillary building ( g plus 4), boundary wall, entrance gate complex, electrical substations, underground water sump with pump room, sewage treatment plant and all associated civil, electrical, mechanical, horticulture and development works and services, complete on engineering, procurement and construction (epc) mode-i. subwork/packages: package
corrigendum : jeypore-malkangiri new bg railway line: design & construction of new bg railway line from km 69.60 to km 125.18 involving earthwork in formation , embankment/cutting, blanketing, side drains, catch water drains, minor bridges, major bridge, road under bridge (rubs), road over bridge (rob's), protection works, p.way track works with contractor's own materials(except new/sh rails) construction of platforms, station buildings, service buildings, sp/ssp buildings and residential buildings, water supply, indoor and outdoor electrification, provision of 1x25 kv conventional type ohe, provision of 2 nos. tss, 1 no sp, construction of new sub-stations, electrification of station building, circulating areas, fobs, pfs, quarters, goomties, modification/conversion to underground for overhaed electrical ht/lt power line crossings etc. on epc basis in rayagada division of east coast railway.
working survey, design & construction of intake well with approach bridge, providing, supplying, lowering, laying and jointing various dia. of di-k9/ms rising main pipelines, rcc sump, pump house, staff quarter, compound wall, supplying and erecting pumping machinery including all electro-mechnical-instrumentation and scada works at various hws to shws under water supply scheme based on bhadbhut barrage (rhs) for industries (gidc) and rural areas of bharuch and vadodara districts with 10 years of comprehensive o&m of entire scope of work. dist.: bharuch
design, engineering, supply, erection, testing and commissioning of 2x500 mva, 2x100mva 400/200/33kv ais sub-station with sas at unchaballi with associated 400 kv d/c lilo line from 400kv kaniha-bisra d/c line (ckt-i & ii) to proposed 400/220/33kv gss at unchaballi, 110 lilo in d/c from ttps-joda line to proposed s/s at unchaballi, 220kv d/c line 220/132/33kv gss, turmunga to proposed 400/220/33kv grid s/s at unchaballi with bay extensions at turumunga on epc contract basis.
corrigendum : providing mep like high side electrical, hvac, fire protection system, lifts, fire alarm and public address system and plumbing works in integrated andhra pradesh state secretariat and hod offices (towers 1 and 2) in amaravati government complex, andhra pradesh
construction of new double line between new palghar & vadhavan port (varor station) including electrification works in mumbai division of western railway
corrigendum : gunupur-theruvali new bg line project : design and construction of new bg railway line from km 122.750 to km 141.940 (excluding rcc box, rob br. no 388 from km 137.725 to 137.925 but including p way & ohe works) involving 08 nos of tunnels (t-2 to t-9) & from km 110.02 to km 113.12 involving 1 no tunnel(t-1), blt works & its approaches and earthwork in formation in embankment/cutting, blanketing, side drains, catch water drains, minor bridges, major bridge, road over bridge (robs), road under bridge (rubs), protection works, p.way track works with contractor's own material supplies including supply of track ballast, new wide based psc sleeper, special psc sleepers (for turnouts, improvised sejs, guard rails etc), point (thick web switches & wcms crossing, glued joints, h- beam/ composite sleepers over girder bridges, improvised sejs, all p-way fittings, ohe foundations, supply and erection of ohe masts, provision of 1x25 kv conventional type ohe (ohe-22.660tkm) including 2.86 km rocs in tunnel, provision of one feeding post (tss) modifications/conversion to underground for overhead electrical ht/lt power line crossings, construction of platforms, station buildings, fob, service buildings, sp/ssp buildings and residential buildings, water supply, indoor and outdoor electrification works etc in waltair division of east coast railway.
corrigendum : providing mep like high side electrical, hvac, fire protection system, lifts, fire alarm and public address system and plumbing works in integrated andhra pradesh state secretariat and hod offices (towers 3 and 4) in amaravati government complex, andhra pradesh
corrigendum : lot-iii electro-mechanical works package of 240 mw (2x120mw) uri-i stage-ii h.e project, baramulla district of ut of j and k
corrigendum : construction of iss at degaon across river mahanadi in sambalpur district odisha on epc turnkey basis including power connectivity system and operation and maintenance for five years