FILTERS
providing electrical infrastructure to the regularized ip sets by extending 11 kv line, erection of 25 kva star 1 (4 star) rated distribution transformers and extension of lt line on partial turnkey basis (25 kva distribution transformer will be supplied by bescom) under percentage quoting basis in neralahalli grampanchayath,molakalmuru section, molakalmuru sub division, hiriyur division
View Insights
shifting of electrical infrastructure in the work of widening from rehariya to sundarpur in the jurisdiction of electricity distribution section gola
providing infrastructure for the provision of street lights in survey no. 18, ambedkar nagara, malligenahalli slum.
replacement of compound lighting pole, lights, cables and earthing infrastructure at main entry lawn area, at faculty of social science, university of delhi
permission for shifting and re-erection of existing electrical infrastructure at sikharapur to pratappur due to improvement of patapur-bhabandha road from 0/0 to 3/813 km
provn of chemical earthing infrastructure along with connected works at various location at 21 wg under ge af leh
development of civil and electrical charging infrastructure for operation of electric buses in state of hp at baijnath bus stand and workshop distt. kangra hp - sh construction of gi sheet cover shed for 2 nos fast charger providing aluminum partition and other minor repair work providing partition wall in record room in canteen area
development of civil and electrical charging infrastructure for operation of electric buses in state of hp at bus stand parwanoo distt solan hp - sh construction of gi sheet cover shed for 1 nos. fast charger construction of boundary wall replacement of damaged gutter
miscellaneous electrical works and other related electrical infrastructures in kajora area office
development of civil and electrical charging infrastructure for operation of electric buses in state of hp at chirgaon bus stand distt shimla hp - sh construction of g.i sheet cover shed for 1 no. fast charger
development of civil and electrical charging infrastructure for operation of electric buses in state of hp at kotli bus stand distt mandi hp - sh construction of gi sheet cover shed for 1 nos fast charger under ridf xxx
development of civil and electrical charging infrastructure for operation of electric buses at bus stand sarahan distt sirmour hp - sh construction of g.i sheet cover shed for 1 no fast charger under ridf xxx
providing of electrical infrastructure in te bldg khajuiria under chakia sdca of muzaffarpur ba
corrigendum : supply, installation, testing and commissioning of transformers and allied infrastructure for reststop thalappady wayside amenities center - supply, installation, testing and commissioning of transformers and allied infrastructure
corrigendum : special repair to e and m infrastructure at certain locations at hq tc under ge (af) bangalore
selection of an agency for shifting of electrical infrastructure from the drain of patel road under kashinagar electrical section in kashinagar nac area.
supply, installation, testing and commissioning of electrical infrastructure for release of lt power supply to ribandar community market- retender
expression of interest (eoi) - csr contribution for ev charging infrastructure on cantonment land. the csr contribution may include: ev charging equipment; electrical infrastructure; civil/electrical works; renewable-energy systems; and/or complete sponsorship of the proposed ev charging station.
advancing term loan from intending financial institution to meet capital expenditure of the project for implementation of transmission infrastructure in phase manner to evacuate 3200 mw thermal power from upcoming generation station at chapar
strengthening of transformer bus bar system, lt distribution panel expansion, laying of lt cable and associated electrical infrastructure at bengaluru dairy
corrigendum : construction of sarkhej-dholera semi high-speed double railway line, including spur lines to lothal nmhc and dholera airport terminal; comprising civil works, which includes formation & viaduct, bridges, station buildings, & associated works; track system (ballasted & blt), overhead traction system including electrical general services; signalling & telecommunication system, operating control centre, integration of all systems complete in all respect including testing & commissioning and all appurtenant works under jurisdiction of western railway
engineering, procurement and construction (epc) agreement for construction of 3rd and 4th railway line adjacent to the existing broad gauge (bg) electrified double line including civil engineering works, track works, signalling & telecommunication works, over head electrification, electrical general services & all other allied works between delhi subjimandi (szm) to ambala cantt (umb) in delhi & ambala divisions of northern railway
construction of new bg double line from kharsia (km 0.00) to balodabazar (km 110.500) and y-connectivity from jharadih including earthwork in formation, bridges, ror (rail over rail), rob (road over bridge), rub (road under bridge), service buildings, staff quarters, p-way works (including supply of ballast, p-way material exept rail), electrification (2x25 kv ohe, psi, plc & electrical general work), and signalling & telecommunication works, along with allied and associated miscellaneous works in connection with kharsia- parmalkasa 5th & 6th new bg line project under south east central railway in the state of chhattisgarh.
composite work (civil, electrical & s&t) comprising formation, viaducts, minor/major bridges, rubs/subways, station buildings, staff quarters, platforms, passenger amenities, supply & spreading of ballast, track linking and p-way works, along with design, supply, erection, testing & commissioning of 25 kv ac ohe and supply, installation, testing & commissioning of telecom outdoor systems including trenching, laying, blowing, splicing & jointing of 48f x 2 ofc on both sides of the track, one-side quad cable, emergency communication system and other associated works between tanda road (excluding) to jamaniya (including) from km 101.29 to km 125.92 (length: 24.63 km) in connection with the chhotaudepur-dhar new broad gauge line project in vadodara division of western railway.
corrigendum : jeypore-malkangiri new bg railway line: design & construction of new bg railway line from km 41.50 to km 69.60 (including nunkhari station) involving earthwork in formation, embankment/cutting, blanketing, side drains, catch water drains, minor bridges, major bridge, road under bridge (rubs), viaducts, tunnels, protection works, blt works, p.way track works with contractor's own materials (except new/sh rails), construction of platforms, station buildings, service buildings, sp/ssp buildings and residential buildings, water supply, indoor and outdoor electrification, provision of 1x25 kv conventional type ohe, tunnel ohe with rocs, tunnel lighting, tss, sp, general power supply arrangements modifications/conversion to underground for overhead electrical ht/lt power line crossings etc on epc basis in waltair division of east coast railway.
corrigendum : package- 3 electro-mechanical works of indirasagar-omkareshwar pumped storage project (8 x 80 mw i.e. 640 mw), district khandwa, madhya pradesh, india - package- 3 electro-mechanical works of indirasagar-omkareshwar pumped storage project (8 x 80 mw i.e. 640 mw), district khandwa, madhya pradesh, india
composite work (civil, electrical & s&t) comprising formation, viaducts, minor/major bridges, rubs/subways, station buildings, staff quarters, platforms, passenger amenities, supply & spreading of ballast, track linking and p-way works, along with design, supply, erection, testing & commissioning of 25 kv ac ohe and supply, installation, testing & commissioning of telecom outdoor systems including trenching, laying, blowing, splicing & jointing of 48f x 2 ofc on both sides of the track, one-side quad cable, emergency communication system and other associated works between jamaniya (excluding) to tirla (excluding) from km 125.92 to km 147 (21.08 km) in connection with the chhotaudepur-dhar new broad gauge line project in vadodara division of western railway.
corrigendum : engineering, procurement and construction (epc) agreement with schedule g-1 for third line track between manikpur (excluding) to iradatganj (including) (ch: 1257.180 to 1340.820) including electrification & signaling works along with construction of rob on lc no. 404/c2, 406/2t, 407/2e & 418c/2e and rub in lc no 426 in connection with manikpur-iradatganj 3rd line project of north central railway
engineering, procurement and construction (epc) contract for quadrupling (laying of new 3rd & 4th lines) of tracks between sulehali west and kurugunta (kqt) stations including electricfication and signalling &telecommunication works in connection with wadi-secunderabad quadrupling project in the state of karnataka.
pre-bid assistance for preparation of priced boq for the tender- construction of new railway bg line in km 28.970 to 42.040 in between kulthana station (including) and rajpura station (including) earthwork, minor bridges (03 nos) and major bridges (07 nos), station buildings, tunnels (7 nos) and mega bridge (03 nos) including electrification in connection with ratlam mhow khandwa gauge conversion in the state of madhya pradesh
construction of gpra at amaravati, the new capital city of andhra pradesh. sh: planning, designing and construction of 1504 residential quarters comprising 600 type-ii quarters in 3 towers ( g plus 24 each), 600 type-iii quarters in 3 towers ( g plus 24 each), 228 type-iv quarters in 3 tower ( g plus 18 each), 56 type-v quarters in 1 tower ( g plus 13) and 20 type-vi quarters in 1 tower ( g plus 9), with a common double basement, ancillary building ( g plus 4), boundary wall, entrance gate complex, electrical substations, underground water sump with pump room, sewage treatment plant and all associated civil, electrical, mechanical, horticulture and development works and services, complete on engineering, procurement and construction (epc) mode-i. subwork/packages: package
corrigendum : jeypore-malkangiri new bg railway line: design & construction of new bg railway line from km 69.60 to km 125.18 involving earthwork in formation , embankment/cutting, blanketing, side drains, catch water drains, minor bridges, major bridge, road under bridge (rubs), road over bridge (rob's), protection works, p.way track works with contractor's own materials(except new/sh rails) construction of platforms, station buildings, service buildings, sp/ssp buildings and residential buildings, water supply, indoor and outdoor electrification, provision of 1x25 kv conventional type ohe, provision of 2 nos. tss, 1 no sp, construction of new sub-stations, electrification of station building, circulating areas, fobs, pfs, quarters, goomties, modification/conversion to underground for overhaed electrical ht/lt power line crossings etc. on epc basis in rayagada division of east coast railway.
working survey, design & construction of intake well with approach bridge, providing, supplying, lowering, laying and jointing various dia. of di-k9/ms rising main pipelines, rcc sump, pump house, staff quarter, compound wall, supplying and erecting pumping machinery including all electro-mechnical-instrumentation and scada works at various hws to shws under water supply scheme based on bhadbhut barrage (rhs) for industries (gidc) and rural areas of bharuch and vadodara districts with 10 years of comprehensive o&m of entire scope of work. dist.: bharuch
design, engineering, supply, erection, testing and commissioning of 2x500 mva, 2x100mva 400/200/33kv ais sub-station with sas at unchaballi with associated 400 kv d/c lilo line from 400kv kaniha-bisra d/c line (ckt-i & ii) to proposed 400/220/33kv gss at unchaballi, 110 lilo in d/c from ttps-joda line to proposed s/s at unchaballi, 220kv d/c line 220/132/33kv gss, turmunga to proposed 400/220/33kv grid s/s at unchaballi with bay extensions at turumunga on epc contract basis.
corrigendum : providing mep like high side electrical, hvac, fire protection system, lifts, fire alarm and public address system and plumbing works in integrated andhra pradesh state secretariat and hod offices (towers 1 and 2) in amaravati government complex, andhra pradesh
construction of new double line between new palghar & vadhavan port (varor station) including electrification works in mumbai division of western railway
corrigendum : gunupur-theruvali new bg line project : design and construction of new bg railway line from km 122.750 to km 141.940 (excluding rcc box, rob br. no 388 from km 137.725 to 137.925 but including p way & ohe works) involving 08 nos of tunnels (t-2 to t-9) & from km 110.02 to km 113.12 involving 1 no tunnel(t-1), blt works & its approaches and earthwork in formation in embankment/cutting, blanketing, side drains, catch water drains, minor bridges, major bridge, road over bridge (robs), road under bridge (rubs), protection works, p.way track works with contractor's own material supplies including supply of track ballast, new wide based psc sleeper, special psc sleepers (for turnouts, improvised sejs, guard rails etc), point (thick web switches & wcms crossing, glued joints, h- beam/ composite sleepers over girder bridges, improvised sejs, all p-way fittings, ohe foundations, supply and erection of ohe masts, provision of 1x25 kv conventional type ohe (ohe-22.660tkm) including 2.86 km rocs in tunnel, provision of one feeding post (tss) modifications/conversion to underground for overhead electrical ht/lt power line crossings, construction of platforms, station buildings, fob, service buildings, sp/ssp buildings and residential buildings, water supply, indoor and outdoor electrification works etc in waltair division of east coast railway.
corrigendum : providing mep like high side electrical, hvac, fire protection system, lifts, fire alarm and public address system and plumbing works in integrated andhra pradesh state secretariat and hod offices (towers 3 and 4) in amaravati government complex, andhra pradesh
corrigendum : lot-iii electro-mechanical works package of 240 mw (2x120mw) uri-i stage-ii h.e project, baramulla district of ut of j and k
construction of 3rd line work including earthwork, blanketing, minor bridges, major bridges, lc work and other miscellaneous works for 25.0t and dfc feeder route of indian railway standard loading, execution of indoor & outdoor s&t works, execution of general electrical works, installation and commissioning of 2x25 kv overhead equipment (ohe) for traction and power supply in connection with the 3rd line work of chandil- madhukunda section in adra division of south eastern railway on engineering, procurement & construction (epc) mode.
engineering procurement and construction (epc) for "construction of doubling work including earthwork, blanketing, minor bridges, major bridges, lhs/rubs, track works, platform work, station building, fobs, other buildings, associated s&t and electrical utility shifting works and associated miscellaneous works for 25t indian railway standard loading from karnauti station(including-ch. 2.844 km) to bihar sharif station(excluding-ch 29.350 km), from ch. 1.900 km to 28.192 km (total- 26.292 km) in connection with the doubling of the bakhtiyarpur-rajgir - tilaiya section"
mahagama - pirpainti new rail line: execution of civil, p-way, electrification, signal and telecom works for construction of new rail line between mahagama station (excluding) and pirpainti station (excluding) from km 60.000 to km 92.100 in connection with pirpainti-jasidih new bg rail line project of eastern railway.
working survey, design & construction of intake well with approach bridge, providing, supplying, lowering, laying and jointing various dia. of di-k9/ms rising main pipelines, rcc sump, pump house with panel room, staff quarter, compound wall, office building, supplying and erecting pumping machinery including all electro-mechanical-instrumentation and scada works at various hws to shws under water supply scheme based on bhadbhut barrage (lhs) for industries (gidc) and rural areas of bharuch and surat districts with 10 years of comprehensive o&m of entire scope of work. dist.: bharuch & surat
corrigendum : development of ecocity 3, new chandigarh, s.a.s nagar (civil, public health and electrical works)
corrigendum : design, survey, supply, installation, testing, commissioning, and 25-year operation & maintenance (o&m) of grid-connected solar power plants under resco mode, including associated 11 kv lines and rms, for solarization under virtual net metering for jvvnl.
corrigendum : contruction of industrial buildings and other infrastruture at bhabha atomic research centre, dodda ullarthi challekere taluk, chitradurga district karnataka. sh construction of various precast rcc buildings and peb buildings including other ancillary buildings such as canteen, gas bank , project house , entry portal in zone-i(gate complex with security gate), entry portal in zone -ii (gate complex with security gate), guard houses,fire pump house, pump room for rain water harvesting sewage treatment plant , site development works, specialised works, local body approvals, and other miscellnious works including internal water supply, sanitory installations drainnage and comprehensive electrical and mechanical services comprasing substation equipment, dg sets, internal electrical installaitons and fans lt panels cabling lighting protection system, fire alarm and public addresss system.........and other specialised e&m services (package-ii)
corrigendum : internal finishing furniture, furnishing and related e&m works for office spaces in gpoa block no 1 at netaji nagar new delhi
corrigendum : chandanpur- shaktigarh 4th line: execution of civil, p-way, electrification, signal and telecom works for construction of 4th rail line between chandanpur station (incl.) and pallahroad (incl.) from km 40.220 to km 78.120 in connection with chandanpur- shaktigarh 4th line rail project of eastern railway
corrigendum : providing mep like high side electrical, hvac, fire protection system, lifts, fire alarm and public address system and plumbing works in integrated andhra pradesh state secretariat and hod offices (gad tower) in amaravati government complex, andhra pradesh
construction of residential towers at bacheli complex under capacity expansion of bailadila iron ore deposit-10/11a, nmdc bacheli, chhattisgarh comprising 5 nos. type-iii residential towers (s+10), 1 no. type-iv residential tower (s+10), 2 nos. staff hostels (s+10), 2 nos. executive studio apartments(s+10), 3 nos. transit and apprentice hostels(s+10), 1 no. shopping complex and guest house (g+1), 2 mld stp, site development (civil, water supply and firefighting works), external electrical works and demolishing works on epc mode
corrigendum : internal finishing , furniture, furnishing and related e&m works for office spaces in gpoa block no1 at netaji nagar, new delhi
request for proposal (rfp) for providing project general management services for new line, multitracking, gauge conversion, electrification and other important works etc. in construction organization under cao/c/adi of western railway for a period of 60 months.
corrigendum : setting of bess system - setting up of 90mw/225mwh battery energy storage system (bess) near chilla s/s chilla hep distt- pauri garhwal to be connected on 132kv grid connecting s/s chilla, distt. pauri garhwal, uttarakhand
stringing of htls conductor in existing 400 kv meramunduli mendhasal dc line along with up gradation of equipments at bus at respective grid substation after dismantling of twin aaac moose conductor. - engineering, supply, erection, testing & commissioning of twin high temperature low sag (htls) conductor after dismantling of twin aaac moose conductor in existing 400 kv meramundali-mendhasal dc line along with up-gradation of equipment and bus at respective grid sub-station ends on turnkey contract basis
design engineering including reverse engineering, manufacturing, supply, erection, testing, and commissioning for renovation, modernization, and uprating of two units of rabs hydel power station.
corrigendum : public health rajamahendravaram circle - hybrid annuity model (ham) - execution of roads with drains, central medians, street lighting, parks and other development works in 4 urban local bodies of ph rajamahendravaram circle - rjy package -ii covering urban local bodies of east godavari district
public health circle, nellore - urban infrastructure - providing of roads, central medians, street lighting, parks, construction of integrated market complex and other development works in 6 nos urban local bodies of nellore public health circle under hybrid annuity model (ham) in package - 2
public health circle, nellore - urban infrastructure - providing of roads, central medians, street lighting, parks and other development works in 11 nos urban local bodies of nellore public health circle under hybrid annuity model (ham) in package - 3
corrigendum : special repair works/ capital works related to electrical, mechanical and civil works as and when required basis for the advanced weapons and equipment india limited (aweil) on fixed percentage service charge basis - special repair works/ capital works related to electrical, mechanical and civil works as and when required basis for the advanced weapons and equipment india limited (aweil) on fixed percentage service charge basis.
electro-mechanical works of 2x36 mw tiuni plasu hep which includes detailed design, engineering, manufacture, quality assurance, quality control, shop assembly, shop testing, supply, transportation, insurance till commissioning, delivery at site, site storage & preservation, erection, testing and commissioning, performance testing, field acceptance testing, training of employers personnel, handing over and fulfilment of guarantee for the electromechanical plant, on epc (engineering, procurement & construction) basis
corrigendum : "execution of third line bg track between ranaghat jn. (excl.) and krishnanagar jn. (excl.) from km 75.210 (from sealdah) to km 97.585 (from sealdah) including electrification & signalling works" on epc mode.
corrigendum : construction of houses and development of infrastructure including external electrification for affordable housing in partnership under pradhan mantri awas yojana 2.0 at tds no. 03 and 04, ujjain, madhya pradesh.
providing roads, central medians, street lighting, parks and other development works in 9 nos urban local bodies of ananthapuramu public health circle under hybrid annuity model (ham) in package - 01
public health quality control circle, guntur - urban infrastructure - package - 1 - execution of roads, central medians, street lighting, parks, office buildings and other development works in 5 ulbs of krishna district and 3 ulbs of bapatla district under hybrid annuity model (ham)
corrigendum : design and construction of ... - design and construction of 400 mld main pumping station mps and 100 mld stp along with power generation and oandm for 10 years after completion of 1 year defect liability period at behrampur gurugram and all other works contingent thereto
construction of block -118 and associated structures along with acve works, panels and electrification at inrp, nrb, barc tarapur.
design, supply, installation, testing, and commissioning of a sewage treatment plant (open technology) of 143 mld capacity, including piping, mechanical, electrical, and instrumentation components, complete with operation and maintenance for up to ten years for of tp 84 (kosad-bharthana kosad-mota varachha-abrama) & tp 86 (kosad) under in new east (sarthana) zone-b, surat municipal corporation. (w-22).
corrigendum : public health circle rajamahendravaram - hybrid annuity model (ham) - execution of roads with drains, central medians, street lighting, parks and other development works in six (6) urban local bodies of west godavari district in ph circle rajamahendravaram - rjy (package - iv)
public health quality control circle, guntur - urban infrastructure - package - 1 - execution of roads, central medians, street lighting, parks, office buildings and other development works in 5 ulbs of ntr district under hybrid annuity model (ham)
design, supply, installation, testing, and commissioning of a sewage treatment plant (open technology) of 143 mld capacity, including piping, mechanical, electrical, and instrumentation components, complete with operation and maintenance for up to ten years for of tp 84 (kosad-bharthana kosad-mota varachha-abrama) & tp 86 (kosad) under in new east (sarthana) zone-b, surat municipal corporation.