FILTERS
corrigendum : jeypore-malkangiri new bg railway line: design & construction of new bg railway line from km 41.50 to km 69.60 (including nunkhari station) involving earthwork in formation, embankment/cutting, blanketing, side drains, catch water drains, minor bridges, major bridge, road under bridge (rubs), viaducts, tunnels, protection works, blt works, p.way track works with contractor's own materials (except new/sh rails), construction of platforms, station buildings, service buildings, sp/ssp buildings and residential buildings, water supply, indoor and outdoor electrification, provision of 1x25 kv conventional type ohe, tunnel ohe with rocs, tunnel lighting, tss, sp, general power supply arrangements modifications/conversion to underground for overhead electrical ht/lt power line crossings etc on epc basis in waltair division of east coast railway.
View Insights
corrigendum : jeypore-malkangiri new bg railway line: design & construction of new bg railway line from km 69.60 to km 125.18 involving earthwork in formation , embankment/cutting, blanketing, side drains, catch water drains, minor bridges, major bridge, road under bridge (rubs), road over bridge (rob's), protection works, p.way track works with contractor's own materials(except new/sh rails) construction of platforms, station buildings, service buildings, sp/ssp buildings and residential buildings, water supply, indoor and outdoor electrification, provision of 1x25 kv conventional type ohe, provision of 2 nos. tss, 1 no sp, construction of new sub-stations, electrification of station building, circulating areas, fobs, pfs, quarters, goomties, modification/conversion to underground for overhaed electrical ht/lt power line crossings etc. on epc basis in rayagada division of east coast railway.
design, engineering, supply, erection, testing and commissioning of 2x500 mva, 2x100mva 400/200/33kv ais sub-station with sas at unchaballi with associated 400 kv d/c lilo line from 400kv kaniha-bisra d/c line (ckt-i & ii) to proposed 400/220/33kv gss at unchaballi, 110 lilo in d/c from ttps-joda line to proposed s/s at unchaballi, 220kv d/c line 220/132/33kv gss, turmunga to proposed 400/220/33kv grid s/s at unchaballi with bay extensions at turumunga on epc contract basis.
work for 400kv quad moose double circuit transmission line on double circuit & multi circuit towers from the existing 400/220kv pandiabil (pgcil) grid substation to proposed 400/220/33kv grid substation at tssez, gopalpur (approx - 157.363 km).
corrigendum : design, survey, supply, installation, testing, commissioning, and 25-year operation & maintenance of grid-connected solar power plants under resco mode, including associated 11 kv lines and rms, for solarization under virtual net metering for avvnl.
corrigendum : lot-2a electro-mechanical works (except gsu transformer, gis, xlpe cable and switchyard equipment) of 260 mw (2x130mw) dulhasti stage-ii h.e project, kishtwar district of ut of j and k, india
corrigendum : turnkey conversion of existing 220 kv sarusajai ais grid substation into 220 kv gis grid substation with provision for future upgradation to 400 kv substation - conversion of existing 220/132/33kv ais to gis, with transformation ratio of 220/132kv, 4x200mva,132/33kv, 3x80mva at sarusajai grid substation of assam with associated transmission lines with provision for future upgradation to 400 kv substation
conversion of existing overhead line to underground cable in banjara hills division in banjara hills circle of ghmc area of tgspdcl
site survey including underground utility verification, engineering, procurement, supply, loading, transportation, unloading, insurance, delivery at site, handling, storage, installation, testing, commissioning including documentation of all items/material required to complete works for turnkey based contract for conversion of existing overhead lt line network including consumer service lines into under ground cable network using fsp/msp & ring main system at mavdi road sub division of rajkot city-3 division of rajkot city circle under pgvcl with gis mapping / geo urja mapping (developed by guvnl) and asset tagging under gujarat wire free city mission. (package-18)
corrigendum : transmission system for establishment of 2 x 160 mva 220/66kv gas insulated substation alongwith lilo of both circuits of 220kv vapi-ii - sayli circuit 1 and 2 and 2 x20 mva 66/11kv gas insulated substation at village sayli, ut of dnh and dd
construction of 220/132kv substation at nanasa village (tehsil kannod, dist- dewas) along with associated 220kv transmission line facilities on turnkey basis as per detailed scope of work.
corrigendum : wbsedcl / project-iii / nit / 2026-27 / ug / sasci / 03 date 03.09.2026 - conversion of overhead network into underground cable system at jalpaiguri town under jalpaiguri district within the state of west bengal under special assistance to states for capital investment sasci scheme
site survey including underground utility verification, engineering, procurement, supply, loading, transportation, unloading, insurance, delivery at site, handling, storage, installation, testing, commissioning including documentation of all items/material required to complete works for turnkey based contract for conversion of existing overhead lt line network including consumer service lines into under ground cable network using fsp/msp & ring main system at nanamava sub division of rajkot city-3 division of rajkot city circle under pgvcl with gis mapping / geo urja mapping (developed by guvnl) and asset tagging under gujarat wire free city mission. (package-17)
construction of 132/33 kv, 2x50 mva gis substation at hathi bhata (ajmer) alongwith associated transmission lines including survey, supply of all equipments/materials, erection (including civil works), testing and commissioning
corrigendum : construction of 132/33 kv, 2x50 mva gis substation at hathi bhata (ajmer) alongwith associated transmission lines
corrigendum : wbsedcl/project-iii/tender/ 2026-27/ug/sasci/01 date 15.09.2026 - conversion of overhead network into underground cable system at contai town under purba midnapore district within the state of west bengal under special assistance to states for capital investment sasci scheme
construction of various 220 kv and 132 kv transmission lines associated with proposed 220 kv gss lohawat including survey, supply of all equipments/materials, erection ( including civil works), testing and commissioning on turnkey basis against specification no. rvpn/ehv/bn-9019002612
site survey including underground utility verification, engineering, procurement, supply, loading, transportation, unloading, insurance, delivery at site, handling, storage, installation, testing, commissioning including documentation of all items/material required to complete works for turnkey based contract for conversion of existing overhead lt line network including consumer service lines into under ground cable network using fsp/msp & ring main system at morbi-road sub division of rajkot city-1 division of rajkot city circle under pgvcl with gis mapping / geo urja mapping (developed by guvnl) and asset tagging under gujarat wire free city mission. (package-8)
site survey including underground utility verification, engineering, procurement, supply, loading, transportation, unloading, insurance, delivery at site, handling, storage, installation, testing, commissioning including documentation of all items/material required to complete works for turnkey based contract for conversion of existing overhead lt line network including consumer service lines into under ground cable network using fsp/msp & ring main system at laxminagar sub division of rajkot city-2 division of rajkot city circle under pgvcl with gis mapping / geo urja mapping (developed by guvnl) and asset tagging under gujarat wire free city mission. (package-12)
corrigendum : renovation and modernization work of existing 220kv /132kv / /33kv /25kv dtps switchyard including construction of new control room building and replacement of existing 132/33kv transformer at dtps
conversion of existing overhead line to underground cable in azamabad division in hyderabad central circle of ghmc area of tgspdcl
corrigendum : wbsedcl / project-iii / nit / 2026-27 / ug / sasci / 04 date 03.09.2026 - conversion of overhead network into underground cable system at balurghat town under dakshin dinajpur district within the state of west bengal under special assistance to states for capital investment sasci scheme
corrigendum : wbsedcl / project-iii / nit / 2026-27 / ug / sasci / 06 date 03.09.2026 - conversion of overhead network into underground cable system at suri town under birbhum district within the state of west bengal under special assistance to states for capital investment sasci scheme
corrigendum : wbsedcl / project-iii / nit / 2026-27 / ug / sasci / 05 date 03.09.2026 - conversion of overhead network into underground cable system at alipurduar town under alipurduar district within the state of west bengal under special assistance to states for capital investment sasci scheme
conversion of existing overhead line to underground cable in charminar division in hyderabad south circle of ghmc area of tgspdcl
site survey including underground utility verification, engineering, procurement, supply, loading, transportation, unloading, insurance, delivery at site, handling, storage, installation, testing, commissioning including documentation of all items/material required to complete works for turnkey based contract for conversion of existing overhead lt line network including consumer service lines into under ground cable network using fsp/msp & ring main system at kalawad road sub division of rajkot city-3 division of rajkot city circle under pgvcl with gis mapping / geo urja mapping (developed by guvnl) and asset tagging under gujarat wire free city mission. (package-16)
conversion of existing overhead line to underground cable in asmangadh division in hyderabad south circle of ghmc area of tgspdcl
site survey including underground utility verification, engineering, procurement, supply, loading, transportation, unloading, insurance, delivery at site, handling, storage, installation, testing, commissioning including documentation of all items/material required to complete works for turnkey based contract for conversion of existing overhead lt line network including consumer service lines into under ground cable network using fsp/msp & ring main system at ranchhodnagar sub division of rajkot city-1 division of rajkot city circle under pgvcl with gis mapping / geo urja mapping (developed by guvnl) and asset tagging under gujarat wire free city mission. (package-3)
site survey including underground utility verification, engineering, procurement, supply, loading, transportation, unloading, insurance, delivery at site, handling, storage, installation, testing, commissioning including documentation of all items/material required to complete works for turnkey based contract for conversion of existing overhead lt line network including consumer service lines into under ground cable network using fsp/msp & ring main system at mahila college sub division of rajkot city-2 division of rajkot city circle under pgvcl with gis mapping / geo urja mapping (developed by guvnl) and asset tagging under gujarat wire free city mission. (package-9)
site survey including underground utility verification, engineering, procurement, supply, loading, transportation, unloading, insurance, delivery at site, handling, storage, installation, testing, commissioning including documentation of all items/material required to complete works for turnkey based contract for conversion of existing overhead lt line network including consumer service lines into under ground cable network using fsp/msp & ring main system at sorathiawadi sub division of rajkot city-1 division of rajkot city circle under pgvcl with gis mapping / geo urja mapping (developed by guvnl) and asset tagging under gujarat wire free city mission. (package-5)
site survey including underground utility verification, engineering, procurement, supply, loading, transportation, unloading, insurance, delivery at site, handling, storage, installation, testing, commissioning including documentation of all items/material required to complete works for turnkey based contract for conversion of existing overhead lt line network including consumer service lines into under ground cable network using fsp/msp & ring main system at udyognagar sub division of rajkot city-2 division of rajkot city circle under pgvcl with gis mapping / geo urja mapping (developed by guvnl) and asset tagging under gujarat wire free city mission. (package-13)
site survey including underground utility verification, engineering, procurement, supply, loading, transportation, unloading, insurance, delivery at site, handling, storage, installation, testing, commissioning including documentation of all items/material required to complete works for turnkey based contract for conversion of existing overhead lt line network including consumer service lines into under ground cable network using fsp/msp & ring main system at pradyumannagar sub division of rajkot city-2 division of rajkot city circle under pgvcl with gis mapping / geo urja mapping (developed by guvnl) and asset tagging under gujarat wire free city mission. (package-10)
site survey including underground utility verification, engineering, procurement, supply, loading, transportation, unloading, insurance, delivery at site, handling, storage, installation, testing, commissioning including documentation of all items/material required to complete works for turnkey based contract for conversion of existing overhead lt line network including consumer service lines into under ground cable network using fsp/msp & ring main system at aji industrial sub division of rajkot city-1 division of rajkot city circle under pgvcl with gis mapping / geo urja mapping (developed by guvnl) and asset tagging under gujarat wire free city mission. (package-7)
site survey including underground utility verification, engineering, procurement, supply, loading, transportation, unloading, insurance, delivery at site, handling, storage, installation, testing, commissioning including documentation of all items/material required to complete works for turnkey based contract for conversion of existing overhead lt line network including consumer service lines into under ground cable network using fsp/msp & ring main system at kothariya road sub division of rajkot city-1 division of rajkot city circle under pgvcl with gis mapping / geo urja mapping (developed by guvnl) and asset tagging under gujarat wire free city mission. (package-6)
corrigendum : wbsedcl / project-iii / nit / 2026-27 / ug / sasci / 02 date 03.09.2026 - conversion of overhead network into underground cable system at egra town and nandigram market area under purba medinipur district within the state of west bengal under special assistance to states for capital investment sasci scheme
corrigendum : td-548/26 - construction of 132 kv transmission lines, approximately 211.03 route kilometers, for upptcl on a turnkey basis.
corrigendum : supply, erection, testing and commissioning for diversion/shifting of 220kv lines due to construction of proposed 2x800 mw units at ctps
modification/shifting of existing electrical eht/ht/lt power line crossing and utility shifting in connection with various railway projects under construction organization hubballi unit.
construction of 132/33 kv, 2x80 mva gis substation at shiv enclave (sanganer) (jaipur) alongwith associated transmission lines including survey, supply of all equipments/materials, erection (including civil works), testing and commissioning
corrigendum : construction of 132/33 kv, 2x80 mva gis substation at shiv enclave (sanganer), jaipur alongwith associated transmission lines including survey, supply of all equipments materials, erection (including civil works), testing and commissioning
corrigendum : modification/shifting of existing eht/ht/lt power line crossings and shifting of electrical utilities in connection with various railway projects under construction organization
supply of material erection testing commissioning construction of 10 nos new 33 kv sub-stations kabri-iii samalkha chandoli saudapur indri city churni billona kurlan danoli haibatpur with associated 33 kv 11 kv link lines including civil work
corrigendum : bid for construction of various transmission elements (various 220kv and 132kv transmission lines) associated with 220kv gss malpura (district - tonk) rvpn/ehv/bn-9019002607, ubn-vpn2627wlob00994)
establishing 2x20mva, 110/11kv sub-station at navage in belagavi taluk & district by constructing 110kv lilo line from existing 110kv belagavi (220kv) -mache line to proposed 110/11kv navage sub station for a distance of 3.52kms using 110kv 630sqmm ug cable in belagavi taluk and district.
balance work of conversion of 220kv scsc to 220kv mcmc line from 400kv babhaleshwar to kopargaon tap point - 36.02 km under nashik zone.
supply, erection, testing and commissioning of (i) erection of 220kv dc line(37km) from 220/132kv ss sadashivpet to m/s. zaheerabad nimz ltd.(ii) 2nos 220kv bay extensions at 220/132kv ss sadhashivpet and (iii) 2nos 220kv bay extensions and 1no. metering bay at m/s. zaheerabad nimz ltd on turnkey basis.
corrigendum : transmission line package- tl01 for design, engineering and construction of dedicated 400kv d/c transmission line with twin moose acsr conductor from potheadyard of ratle hep to kishtwar pooling station along with associated communication equipment - transmission line package- tl01 for design, engineering and construction of dedicated 400kv d/c transmission line with twin moose acsr conductor from potheadyard of ratle hep to kishtwar pooling station along with associated communication equipment.
corrigendum : transmission line package tw33b including tower, conductor, insulators, opgw (installation and commissioning only), hardware fitting and accessories for conductor for i) 132kv s/c on d/c tower naharlagun kolaptukar (earlier naharlagun- gerukamukh) ii) 132kv s/c on d/c tower rilo- sagalee associated with comprehensive scheme for transmission system strengthening of arunachal pradesh
corrigendum : upgradation of the existing sas based 132kv gis substation to 220kv gis substation with 02 nos. 160mva transformers and augmentation of existing 132kv transformation capacity from 02 nos. 63mva to 3 nos. 63mva at ecotech10, gr. noida
supply of material erection testing commissioning construction of 06 nos new 33 kv sub-stations assaudha chamaria road palri gohana shazadpur siwanamal with associated 33 kv 11 kv link lines including complete civil works on turnkey