FILTERS
design, supply, installation, testing, and commissioning of a sewage treatment plant (open technology) of 143 mld capacity, including piping, mechanical, electrical, and instrumentation components, complete with operation and maintenance for up to ten years for of tp 84 (kosad-bharthana kosad-mota varachha-abrama) & tp 86 (kosad) under in new east (sarthana) zone-b, surat municipal corporation.
View Insights
corrigendum : public health circle rajamahendravaram - hybrid annuity model (ham) - execution of roads with drains, central medians, street lighting, parks and other developmental works in urban local bodies of ph circle rajamahendravaram - rjy (package-i) covering ulb's of kakinda district.
corrigendum : electromechanical works of 3x40 mw sirkari bhyol rupsiabagar hep including detailed design, engineering, manufacture, supply, erection, testing, commissioning and other associated different works on epc (engineering, procurement and construction)
corrigendum : pre qualifcation bid of hosatel 09 - construction of new hostel 09 of 1000 students capacity ground plus 13 upper floors including civil works finishing works water supply and sanitary installations internal electrical installation cable laying fire-fighting system automatic fire a
construction of doubling of track work including earthwork, blanketing, minor bridges, lc work and other miscellaneous works for 25t indian railway standard loading, execution of indoor & outdoor s&t works, execution of general electrical works, installation and commissioning of 2x25 kv overhead equipment (ohe) for traction and power supply in connection with the adra-sanka-rukni doubling project of adra division, south eastern railway on engineering, procurement & construction (epc) mode.
corrigendum : engineering, procurement and construction (epc) of judicial officers residential flats and external infrastructure development works at sector-19 dwarka, delhi - engineering, procurement and construction of residential flats including all civil, structural, mechanical, electrical, plumbing, fire fighting, horticulture, landscaping and all associated works.
corrigendum : public health circle rajamahendravaram - hybrid annuity model (ham) - execution of roads with drains, central medians, street lighting, parks and other development works in seven (7) urban local bodies of dr. b. r. ambedkar konaseema and eluru districts of ph circle rajamahendravaram - rjy package - iii
corrigendum : renovation and modernization work of existing 220kv /132kv / /33kv /25kv dtps switchyard including construction of new control room building and replacement of existing 132/33kv transformer at dtps
design, supply, installation, testing, and commissioning of a sewerage treatment plant (open technology) of 100 mld capacity, including piping, mechanical, electrical, and instrumentation components, complete with operation and maintenance for up to ten years at valak in new east zone-b(sarthana) of surat municipal corporation.
establishing of 220 kv single circuit between 220 kv gss nph and 220 kv gss vkia
corrigendum : establishing of 220 kv single circuit between 220 kv gss nph and 220 kv gss vkia (approx. 13km)
corrigendum : providing roads, central medians, street lighting, parks and other development works in 6 nos urban local bodies of ananthapuramu public health circle under hybrid annuity model in (ham) package-05
corrigendum : new 33 by 11 kv sub-stations augmentation or addition capacity including associated line and other works for the development of distribution infrastructure in jdvvnl under rdss scheme on turnkey mode under churu circle.
construction of special operation training centre at nsg campus manesar gurugram haryana sh construction of administrative block g plus 1 tower block g plus 6 50m modular shooting range shoot house g plus 1 270 degree live firing simlulator boundary walls with entry gates guard rooms etc including all civil and e and m works external development work on epc mode-ii basis subwork/packages: construction of special operation training centre at nsg campus manesar gurugram haryana sh construction of administrative block g plus 1 tower block g plus 6 50 m modular shooting range shoot house g plus 1 270 degree live firing simulator boundary walls with entry gates guard rooms etc including all civil and e and m works external development works on epc mode-ii basis
corrigendum : new 33 kv by 11 kv sub-stations augmentation or addition of capacity, including associated lines and other works for the development of distribution infrastructure in jdvvnl under rdss scheme on turnkey mode, within jaisalmer circle.
corrigendum : new 33 by 11 kv sub-stations augmentation or addition capacity including associated line and other works for the development of distribution infrastructure in jdvvnl under rdss scheme on turnkey mode under bikaner(dungargarh and nokha)circle.
design, engineering, manufacturing, supply, erection, testing, and commissioning of 220kv & 66kv gis equipments & materials on turnkey basis including civil works for 220kv godadara gis substation
corrigendum : renovation, modernization and upgradation of kulhal hydroelectric project on turn key basis
capex rate contract category- i rs. 0 to 3.00 lacs for carrying out maintenance and low value capital jobs of mechanical, civil and electrical nature at retail outlets including ksks and consumer outlets under bangalore, belgaum, mangalore,
construction of phulbari in stream storage structure across river sapei near village phulbari in bargaon block of sundargarh district in state of odisha on epc turn key basis including power connectivity system and operation and maintenance - construction of phulbari instream storage structure across river sapei near village phulbari in bargaon block of sundargarh district in state of odisha on epc turn key basis including power connectivity system and operation and maintenance
corrigendum : construction of iss at sarsara balitikra across river jeera in bargarh district odisha on epc turnkey basis including power connectivity system and operation and maintenance for five years
corrigendum : establishment of centralized transmission asset management service for remote operation of dvc substations.
corrigendum : new 33 by 11 kv sub-stations augmentation or addition capacity including associated line and other works for the development of distribution infrastructure in jdvvnl under rdss scheme on turnkey mode under phalodi circle.
corrigendum : new 33 by 11 kv sub-stations augmentation or addition capacity including associated line and other works for the development of distribution infrastructure in jdvvnl under rdss scheme on turnkey mode under bikaner(ddi ddii and khajuwala)circle.
utility shifting in kharagpur-tatanagar 4th line (upto rakha mines station), nimpura west outer cabin to midnapur, hijli to nimpura through yard 3rd line and any other location as per the requirement under the jurisdiction of dy ce/con/ii/kharagpur of s. e. railway, kharagpur.
con of (iss) near vlg sikuan in the district of blgr acr river sungarh incl hydro mech works power conc works, road connc, stf qtr incl svey invg plng design, est of all compo with om of the proj for 5yearsor5flood sesn whichever is more after succ c
corrigendum : lot-ii package hydro-mechanical works for all gates and pressure shaft liners for the implementation of the 240 mw uri-i stage-ii h.e project, located near boniyar, uri villages in the baramulla district of ut of j and k, india.
work of replacement of existing 0.2 acsr panther conductor along with necessary hardware, insulator string by equivalent hpc of 132kv pandharpurutopian- welspun- mangalwedha line (48.95ckm) & 132kv pandharpurnimboni - mangalwedha line (58.75ckm) under jurisdiction of ehv o&m division, solapur under ehv pc o&m zone, pune.- 1st call.
corrigendum : modification/shifting of existing eht/ht/lt power line crossings and shifting of electrical utilities in connection with various railway projects under construction organization
corrigendum : new 33 by 11 kv sub-stations augmentation or addition capacity including associated line and other works for the development of distribution infrastructure in jdvvnl under rdss scheme on turnkey mode under jalore balotra hanumangarh and sriganganagar
design, supply, erection, testing and commissioning of 2x25 kv auto-transformer (at) feeding system, including 220/55 kv makkajipalli (mkj) traction substations, dharmavaram (dmm) sectioning posts (sps), nagasamudram (ngm) and penukonda (pkd) sub-sectioning posts (ssps), in bangalore-dharmavaram section in bangalore division of south western railway
riverfront development project phase-i of amreli, dist. amreli, gujarat under sjmmsvy (re invitation) : construction of riverfront development work phase-i (civil, electrical, water supply, sewerage, storm water, irrigation & horticulture works including 3 years of maintenance after commissioning) for phase-01 from somnath mahadev mandir bridge to kamnath bridge for 0.76 km of thebi riverbank and from amreli kukavav bridge to kamnath bridge for 0.89 km of vadi riverbank within town of amreli, dist. amreli, gujarat under programme of sjmmsvy
est. no. sr/mesd/ms/8345/ 2025-26 - est. no. sr/mesd/ms/8345/ 2025-26 providing renovation, addition and alterations to e.i., lan networking, air conditioning system, lifts, fire alarming, fire fighting system and audio video system to the air india building, nariman point, mumbai.
corrigendum : new 33 by 11 kv sub-stations augmentation or addition capacity including associated line and other works for the development of distribution infrastructure in jdvvnl under rdss scheme on turnkey mode under barmer circle.
construction of bharatpur iss across river ichha near village bharatpur in lephripada block of sundargarh district in state of odisha on epc turnkey basis including power connectivity system and operation and maintenance of complete commissioned
s&t works comprising trenching, laying of cables, construction of foundations, erection of location boxes, signals and other outdoor equipment, associated wiring in connection with the yard remodeling of 05 stations (talodhi, rajoli, mul-maroda, kelzar and chandafort), including design, supply, installation, testing and commissioning of new ei, msdac, ips, lc gate etc., subsequent modifications to ei systems and associated indoor and outdoor s&t works in station yards and block sections, and s&t works in facilitation of engineering works, in connection with the doubling work of the gondia-chandafort section.
design, supply, installation, testing, and commissioning of a sewerage treatment plant (open technology) of 42 mld capacity, including piping, mechanical, electrical, and instrumentation components, complete with operation and maintenance for up to ten years at saniya hemad for newly added area of new east drainage zone-a (varachha), surat municipal corporation.
1) navsari district jail special repair (8th attempt): special repair works for the store building at navsari district jail, including electrification components., 2) navsari police infrastructure repair (4th attempt): special repair works at the sp office, town police station, savar police line, and new police line in navsari., 3) savar police line demolition: demolition of the deputy sp building (quarter guard), deputy sp building (old lcb office), and d-06 officer building at savar police line, navsari (including debris removal and land leveling)., 4) surat emrs campus construction (deposit work - gstes): construction of school building, boys hostel (g+2), girls hostel (g+2), kitchen dining hall, staff quarters, class-4 staff quarters, and campus development at mangrol (laveth), surat (includes electrification, furniture, and fire-fighting setup)., 5) valsad emrs campus construction (deposit work - gstes): construction of school building, boys hostel (g+2), girls hostel (g+2), kitchen dining hall, staff quarters, class-4 staff quarters, and campus development at umargam, valsad (includes electrification, furniture, and fire-fighting setup). (gujarati document)
construction of school building (g+2), boys hostel (g+2), girls hostel (g+2), staff quarters (g+2), mess building (g+1), class-iv quarters (g.f), infrastructure etc. for emrs school campus at umargam, dist.- valsad (including electrification & fire fighting system) (gstes priority - 2024-25) (deposit work) (first attempt)
construction of model bus station at kuppam, chittoor district (including civil works, yard work, water supply & sanitary arrangements, electrification, firefighting system, havc works, cctv and pa system, stp works and land scrapping works) (payment mode through nidhi portal govt. of ap)
corrigendum : design and construction of multi storied, type-ii, type-iii, type-iv and type-v staff quarters, divisional store depot, training institute including electrical general works and allied works at rayagada and area office at koraput in connection with setting up of rayagada division in east coast railway on engineering, procurement & construction (epc) mode
construction of school building (g+2), boys hostel (g+2), girls hostel (g+2), staff quarters (g+3), mess building (g+1), class-iv quarters (g.f), infrastructure etc. for emrs school campus at kukarmunda, dist.- tapi (including electrification & fire fighting system) (gstes priority - 2024-25) (first attempt)
1) vadodara central jail infrastructure (1st attempt) (sbd): construction of opd room, vocational training center, canteen, open air theater, and hardcore cell at vadodara central jail, vadodara district (including electrification components)., 2) emrs school complex construction (1st attempt) (sbd): construction of school building, boys & girls hostels, staff quarters, mess building, class iv quarters, and campus infrastructure development for the emrs school complex at ranjitnagar, ghoghamba, panchmahal district (including electrification components).. (gujarati document)
construction of school building, boys & girls hostels, staff quarters, mess building, class iv quarters, infrastructure etc. for emrs school complex at ranjitnagar - ghoghamba, district panchmahal. (including electrification and fire fighting system) (deposit work) (g.s.t.e.s priority - 2024-25) [1st attempt]
34-1 - construction of advanced training centre for instructor at i.t.i. aundh, pune. (including electrical work)
construction of school building (g+2), boys hostel (g+2), girls hostel (g+2), staff quarters (g+2), mess building (g+1), class-iv quarters (g.f), infrastructure etc. for emrs school campus at mangrol (laveth), dist.- surat (including electrification & fire fighting system) (gstes priority - 2024-25) (deposit work)
1 dismentaling of c type quarter at sub jail godhra dist panchmahal 2 dismentaling of c type quarter and toilet room at sub jail chhotaudepur 3 construction of psi-1 & 2 room at virpur police station, dist mahisagar (including electrification) 4 special repair to cat b-48 (railway police staff quarter) at srp gr-05 godhra dist panchmahal (including electrification) 5 special repair to cat morva hadaf police line, dist panchmahal (including electrification) 6 construction of school building, girls hostel, staff quarters, mess building, class iv quarters, infrastructure etc. for girls school complex at muvada vadoth taluka pavijetpur dist. chhota udepur (including electrification)
construction of school building, girls hostel, staff quarters, mess building, class iv quarters, infrastructure etc. for girls school complex at muvada vadoth taluka pavijetpur dist. chhotaudepur (including electrification & fire fighting system) (deposit work) (g.s.t.e.s priority - 2024-25) [1st attempt]
construction of high level laboratory to upgrade sickle cell institute c.g. as a center of excellence at raipur, i/c. water supply, sanitery fittings & electrification work at distt. raipur,c.g.(division no. 2, raipur).