FILTERS
corrigendum : construction of sarkhej-dholera semi high-speed double railway line, including spur lines to lothal nmhc and dholera airport terminal; comprising civil works, which includes formation & viaduct, bridges, station buildings, & associated works; track system (ballasted & blt), overhead traction system including electrical general services; signalling & telecommunication system, operating control centre, integration of all systems complete in all respect including testing & commissioning and all appurtenant works under jurisdiction of western railway
View Insights
construction of new bg double line from kharsia (km 0.00) to balodabazar (km 110.500) and y-connectivity from jharadih including earthwork in formation, bridges, ror (rail over rail), rob (road over bridge), rub (road under bridge), service buildings, staff quarters, p-way works (including supply of ballast, p-way material exept rail), electrification (2x25 kv ohe, psi, plc & electrical general work), and signalling & telecommunication works, along with allied and associated miscellaneous works in connection with kharsia- parmalkasa 5th & 6th new bg line project under south east central railway in the state of chhattisgarh.
composite work (civil, electrical & s&t) comprising formation, viaducts, minor/major bridges, rubs/subways, station buildings, staff quarters, platforms, passenger amenities, supply & spreading of ballast, track linking and p-way works, along with design, supply, erection, testing & commissioning of 25 kv ac ohe and supply, installation, testing & commissioning of telecom outdoor systems including trenching, laying, blowing, splicing & jointing of 48f x 2 ofc on both sides of the track, one-side quad cable, emergency communication system and other associated works between tanda road (excluding) to jamaniya (including) from km 101.29 to km 125.92 (length: 24.63 km) in connection with the chhotaudepur-dhar new broad gauge line project in vadodara division of western railway.
corrigendum : package- 3 electro-mechanical works of indirasagar-omkareshwar pumped storage project (8 x 80 mw i.e. 640 mw), district khandwa, madhya pradesh, india - package- 3 electro-mechanical works of indirasagar-omkareshwar pumped storage project (8 x 80 mw i.e. 640 mw), district khandwa, madhya pradesh, india
composite work (civil, electrical & s&t) comprising formation, viaducts, minor/major bridges, rubs/subways, station buildings, staff quarters, platforms, passenger amenities, supply & spreading of ballast, track linking and p-way works, along with design, supply, erection, testing & commissioning of 25 kv ac ohe and supply, installation, testing & commissioning of telecom outdoor systems including trenching, laying, blowing, splicing & jointing of 48f x 2 ofc on both sides of the track, one-side quad cable, emergency communication system and other associated works between jamaniya (excluding) to tirla (excluding) from km 125.92 to km 147 (21.08 km) in connection with the chhotaudepur-dhar new broad gauge line project in vadodara division of western railway.
construction of gpra at amaravati, the new capital city of andhra pradesh. sh: planning, designing and construction of 1504 residential quarters comprising 600 type-ii quarters in 3 towers ( g plus 24 each), 600 type-iii quarters in 3 towers ( g plus 24 each), 228 type-iv quarters in 3 tower ( g plus 18 each), 56 type-v quarters in 1 tower ( g plus 13) and 20 type-vi quarters in 1 tower ( g plus 9), with a common double basement, ancillary building ( g plus 4), boundary wall, entrance gate complex, electrical substations, underground water sump with pump room, sewage treatment plant and all associated civil, electrical, mechanical, horticulture and development works and services, complete on engineering, procurement and construction (epc) mode-i. subwork/packages: package
working survey, design & construction of intake well with approach bridge, providing, supplying, lowering, laying and jointing various dia. of di-k9/ms rising main pipelines, rcc sump, pump house, staff quarter, compound wall, supplying and erecting pumping machinery including all electro-mechnical-instrumentation and scada works at various hws to shws under water supply scheme based on bhadbhut barrage (rhs) for industries (gidc) and rural areas of bharuch and vadodara districts with 10 years of comprehensive o&m of entire scope of work. dist.: bharuch
design, engineering, supply, erection, testing and commissioning of 2x500 mva, 2x100mva 400/200/33kv ais sub-station with sas at unchaballi with associated 400 kv d/c lilo line from 400kv kaniha-bisra d/c line (ckt-i & ii) to proposed 400/220/33kv gss at unchaballi, 110 lilo in d/c from ttps-joda line to proposed s/s at unchaballi, 220kv d/c line 220/132/33kv gss, turmunga to proposed 400/220/33kv grid s/s at unchaballi with bay extensions at turumunga on epc contract basis.
corrigendum : providing mep like high side electrical, hvac, fire protection system, lifts, fire alarm and public address system and plumbing works in integrated andhra pradesh state secretariat and hod offices (towers 1 and 2) in amaravati government complex, andhra pradesh
corrigendum : providing mep like high side electrical, hvac, fire protection system, lifts, fire alarm and public address system and plumbing works in integrated andhra pradesh state secretariat and hod offices (towers 3 and 4) in amaravati government complex, andhra pradesh
corrigendum : lot-iii electro-mechanical works package of 240 mw (2x120mw) uri-i stage-ii h.e project, baramulla district of ut of j and k
construction of 3rd line work including earthwork, blanketing, minor bridges, major bridges, lc work and other miscellaneous works for 25.0t and dfc feeder route of indian railway standard loading, execution of indoor & outdoor s&t works, execution of general electrical works, installation and commissioning of 2x25 kv overhead equipment (ohe) for traction and power supply in connection with the 3rd line work of chandil- madhukunda section in adra division of south eastern railway on engineering, procurement & construction (epc) mode.
engineering procurement and construction (epc) for "construction of doubling work including earthwork, blanketing, minor bridges, major bridges, lhs/rubs, track works, platform work, station building, fobs, other buildings, associated s&t and electrical utility shifting works and associated miscellaneous works for 25t indian railway standard loading from karnauti station(including-ch. 2.844 km) to bihar sharif station(excluding-ch 29.350 km), from ch. 1.900 km to 28.192 km (total- 26.292 km) in connection with the doubling of the bakhtiyarpur-rajgir - tilaiya section"
working survey, design & construction of intake well with approach bridge, providing, supplying, lowering, laying and jointing various dia. of di-k9/ms rising main pipelines, rcc sump, pump house with panel room, staff quarter, compound wall, office building, supplying and erecting pumping machinery including all electro-mechanical-instrumentation and scada works at various hws to shws under water supply scheme based on bhadbhut barrage (lhs) for industries (gidc) and rural areas of bharuch and surat districts with 10 years of comprehensive o&m of entire scope of work. dist.: bharuch & surat
corrigendum : development of ecocity 3, new chandigarh, s.a.s nagar (civil, public health and electrical works)
corrigendum : design, survey, supply, installation, testing, commissioning, and 25-year operation & maintenance (o&m) of grid-connected solar power plants under resco mode, including associated 11 kv lines and rms, for solarization under virtual net metering for jvvnl.
corrigendum : contruction of industrial buildings and other infrastruture at bhabha atomic research centre, dodda ullarthi challekere taluk, chitradurga district karnataka. sh construction of various precast rcc buildings and peb buildings including other ancillary buildings such as canteen, gas bank , project house , entry portal in zone-i(gate complex with security gate), entry portal in zone -ii (gate complex with security gate), guard houses,fire pump house, pump room for rain water harvesting sewage treatment plant , site development works, specialised works, local body approvals, and other miscellnious works including internal water supply, sanitory installations drainnage and comprehensive electrical and mechanical services comprasing substation equipment, dg sets, internal electrical installaitons and fans lt panels cabling lighting protection system, fire alarm and public addresss system.........and other specialised e&m services (package-ii)
corrigendum : internal finishing furniture, furnishing and related e&m works for office spaces in gpoa block no 1 at netaji nagar new delhi
corrigendum : providing mep like high side electrical, hvac, fire protection system, lifts, fire alarm and public address system and plumbing works in integrated andhra pradesh state secretariat and hod offices (gad tower) in amaravati government complex, andhra pradesh
construction of residential towers at bacheli complex under capacity expansion of bailadila iron ore deposit-10/11a, nmdc bacheli, chhattisgarh comprising 5 nos. type-iii residential towers (s+10), 1 no. type-iv residential tower (s+10), 2 nos. staff hostels (s+10), 2 nos. executive studio apartments(s+10), 3 nos. transit and apprentice hostels(s+10), 1 no. shopping complex and guest house (g+1), 2 mld stp, site development (civil, water supply and firefighting works), external electrical works and demolishing works on epc mode
corrigendum : internal finishing , furniture, furnishing and related e&m works for office spaces in gpoa block no1 at netaji nagar, new delhi
stringing of htls conductor in existing 400 kv meramunduli mendhasal dc line along with up gradation of equipments at bus at respective grid substation after dismantling of twin aaac moose conductor. - engineering, supply, erection, testing & commissioning of twin high temperature low sag (htls) conductor after dismantling of twin aaac moose conductor in existing 400 kv meramundali-mendhasal dc line along with up-gradation of equipment and bus at respective grid sub-station ends on turnkey contract basis
design engineering including reverse engineering, manufacturing, supply, erection, testing, and commissioning for renovation, modernization, and uprating of two units of rabs hydel power station.
corrigendum : public health rajamahendravaram circle - hybrid annuity model (ham) - execution of roads with drains, central medians, street lighting, parks and other development works in 4 urban local bodies of ph rajamahendravaram circle - rjy package -ii covering urban local bodies of east godavari district
public health circle, nellore - urban infrastructure - providing of roads, central medians, street lighting, parks, construction of integrated market complex and other development works in 6 nos urban local bodies of nellore public health circle under hybrid annuity model (ham) in package - 2
public health circle, nellore - urban infrastructure - providing of roads, central medians, street lighting, parks and other development works in 11 nos urban local bodies of nellore public health circle under hybrid annuity model (ham) in package - 3
corrigendum : special repair works/ capital works related to electrical, mechanical and civil works as and when required basis for the advanced weapons and equipment india limited (aweil) on fixed percentage service charge basis - special repair works/ capital works related to electrical, mechanical and civil works as and when required basis for the advanced weapons and equipment india limited (aweil) on fixed percentage service charge basis.
electro-mechanical works of 2x36 mw tiuni plasu hep which includes detailed design, engineering, manufacture, quality assurance, quality control, shop assembly, shop testing, supply, transportation, insurance till commissioning, delivery at site, site storage & preservation, erection, testing and commissioning, performance testing, field acceptance testing, training of employers personnel, handing over and fulfilment of guarantee for the electromechanical plant, on epc (engineering, procurement & construction) basis
design, construction and commissioning of peb sheds, structures, buildings, water supply arrangement, drainage, sewerage, fire fighting works, road works, track works, traversers, shower testing arrangements, static and oh water tanks, tubewells, parking facilities, boundary wall/fencing, eot cranes, supply installation and commissioning of machinery and plant, electric substations, and power supply arrangements, general electrical works, associated telecom & it works etc. i.e. including all civil, electrical, mechanical, it & telecom works in connection with construction of new workshop at rail coach factory (rcf), kapurthala, punjab (india) on epc mode.
providing roads, central medians, street lighting, parks and other development works in 9 nos urban local bodies of ananthapuramu public health circle under hybrid annuity model (ham) in package - 01
public health quality control circle, guntur - urban infrastructure - package - 1 - execution of roads, central medians, street lighting, parks, office buildings and other development works in 5 ulbs of krishna district and 3 ulbs of bapatla district under hybrid annuity model (ham)
corrigendum : design and construction of ... - design and construction of 400 mld main pumping station mps and 100 mld stp along with power generation and oandm for 10 years after completion of 1 year defect liability period at behrampur gurugram and all other works contingent thereto
design, supply, installation, testing, and commissioning of a sewage treatment plant (open technology) of 143 mld capacity, including piping, mechanical, electrical, and instrumentation components, complete with operation and maintenance for up to ten years for of tp 84 (kosad-bharthana kosad-mota varachha-abrama) & tp 86 (kosad) under in new east (sarthana) zone-b, surat municipal corporation. (w-22).
corrigendum : public health circle rajamahendravaram - hybrid annuity model (ham) - execution of roads with drains, central medians, street lighting, parks and other development works in six (6) urban local bodies of west godavari district in ph circle rajamahendravaram - rjy (package - iv)
public health quality control circle, guntur - urban infrastructure - package - 1 - execution of roads, central medians, street lighting, parks, office buildings and other development works in 5 ulbs of ntr district under hybrid annuity model (ham)
design, supply, installation, testing, and commissioning of a sewage treatment plant (open technology) of 143 mld capacity, including piping, mechanical, electrical, and instrumentation components, complete with operation and maintenance for up to ten years for of tp 84 (kosad-bharthana kosad-mota varachha-abrama) & tp 86 (kosad) under in new east (sarthana) zone-b, surat municipal corporation.
corrigendum : public health circle rajamahendravaram - hybrid annuity model (ham) - execution of roads with drains, central medians, street lighting, parks and other developmental works in urban local bodies of ph circle rajamahendravaram - rjy (package-i) covering ulb's of kakinda district.
corrigendum : electromechanical works of 3x40 mw sirkari bhyol rupsiabagar hep including detailed design, engineering, manufacture, supply, erection, testing, commissioning and other associated different works on epc (engineering, procurement and construction)
site survey including underground utility verification, engineering, procurement, supply, loading, transportation, unloading, insurance, delivery at site, handling, storage, installation, testing, commissioning including documentation of all items/material required to complete works for turnkey based contract for conversion of existing overhead lt line network including consumer service lines into under ground cable network using fsp/msp & ring main system at mavdi road sub division of rajkot city-3 division of rajkot city circle under pgvcl with gis mapping / geo urja mapping (developed by guvnl) and asset tagging under gujarat wire free city mission. (package-18)
corrigendum : pre qualifcation bid of hosatel 09 - construction of new hostel 09 of 1000 students capacity ground plus 13 upper floors including civil works finishing works water supply and sanitary installations internal electrical installation cable laying fire-fighting system automatic fire a
construction of doubling of track work including earthwork, blanketing, minor bridges, lc work and other miscellaneous works for 25t indian railway standard loading, execution of indoor & outdoor s&t works, execution of general electrical works, installation and commissioning of 2x25 kv overhead equipment (ohe) for traction and power supply in connection with the adra-sanka-rukni doubling project of adra division, south eastern railway on engineering, procurement & construction (epc) mode.
site survey including underground utility verification, engineering, procurement, supply, loading, transportation, unloading, insurance, delivery at site, handling, storage, installation, testing, commissioning including documentation of all items/material required to complete works for turnkey based contract for conversion of existing overhead lt line network including consumer service lines into under ground cable network using fsp/msp & ring main system at nanamava sub division of rajkot city-3 division of rajkot city circle under pgvcl with gis mapping / geo urja mapping (developed by guvnl) and asset tagging under gujarat wire free city mission. (package-17)
construction of various 220 kv and 132 kv transmission lines associated with proposed 220 kv gss lohawat including survey, supply of all equipments/materials, erection ( including civil works), testing and commissioning on turnkey basis against specification no. rvpn/ehv/bn-9019002612
corrigendum : engineering, procurement and construction (epc) of judicial officers residential flats and external infrastructure development works at sector-19 dwarka, delhi - engineering, procurement and construction of residential flats including all civil, structural, mechanical, electrical, plumbing, fire fighting, horticulture, landscaping and all associated works.
site survey including underground utility verification, engineering, procurement, supply, loading, transportation, unloading, insurance, delivery at site, handling, storage, installation, testing, commissioning including documentation of all items/material required to complete works for turnkey based contract for conversion of existing overhead lt line network including consumer service lines into under ground cable network using fsp/msp & ring main system at morbi-road sub division of rajkot city-1 division of rajkot city circle under pgvcl with gis mapping / geo urja mapping (developed by guvnl) and asset tagging under gujarat wire free city mission. (package-8)
site survey including underground utility verification, engineering, procurement, supply, loading, transportation, unloading, insurance, delivery at site, handling, storage, installation, testing, commissioning including documentation of all items/material required to complete works for turnkey based contract for conversion of existing overhead lt line network including consumer service lines into under ground cable network using fsp/msp & ring main system at laxminagar sub division of rajkot city-2 division of rajkot city circle under pgvcl with gis mapping / geo urja mapping (developed by guvnl) and asset tagging under gujarat wire free city mission. (package-12)
corrigendum : public health circle rajamahendravaram - hybrid annuity model (ham) - execution of roads with drains, central medians, street lighting, parks and other development works in seven (7) urban local bodies of dr. b. r. ambedkar konaseema and eluru districts of ph circle rajamahendravaram - rjy package - iii
corrigendum : renovation and modernization work of existing 220kv /132kv / /33kv /25kv dtps switchyard including construction of new control room building and replacement of existing 132/33kv transformer at dtps
design, supply, installation, testing, and commissioning of a sewerage treatment plant (open technology) of 100 mld capacity, including piping, mechanical, electrical, and instrumentation components, complete with operation and maintenance for up to ten years at valak in new east zone-b(sarthana) of surat municipal corporation.