FILTERS
site survey including underground utility verification, engineering, procurement, supply, loading, transportation, unloading, insurance, delivery at site, handling, storage, installation, testing, commissioning including documentation of all items/material required to complete works for turnkey based contract for conversion of existing overhead lt line network including consumer service lines into under ground cable network using fsp/msp & ring main system at laxminagar sub division of rajkot city-2 division of rajkot city circle under pgvcl with gis mapping / geo urja mapping (developed by guvnl) and asset tagging under gujarat wire free city mission. (package-12)
View Insights
corrigendum : public health circle rajamahendravaram - hybrid annuity model (ham) - execution of roads with drains, central medians, street lighting, parks and other development works in seven (7) urban local bodies of dr. b. r. ambedkar konaseema and eluru districts of ph circle rajamahendravaram - rjy package - iii
corrigendum : renovation and modernization work of existing 220kv /132kv / /33kv /25kv dtps switchyard including construction of new control room building and replacement of existing 132/33kv transformer at dtps
design, supply, installation, testing, and commissioning of a sewerage treatment plant (open technology) of 100 mld capacity, including piping, mechanical, electrical, and instrumentation components, complete with operation and maintenance for up to ten years at valak in new east zone-b(sarthana) of surat municipal corporation.
establishing of 220 kv single circuit between 220 kv gss nph and 220 kv gss vkia
corrigendum : establishing of 220 kv single circuit between 220 kv gss nph and 220 kv gss vkia (approx. 13km)
corrigendum : providing roads, central medians, street lighting, parks and other development works in 6 nos urban local bodies of ananthapuramu public health circle under hybrid annuity model in (ham) package-05
corrigendum : new 33 by 11 kv sub-stations augmentation or addition capacity including associated line and other works for the development of distribution infrastructure in jdvvnl under rdss scheme on turnkey mode under churu circle.
corrigendum : new 33 kv by 11 kv sub-stations augmentation or addition of capacity, including associated lines and other works for the development of distribution infrastructure in jdvvnl under rdss scheme on turnkey mode, within jaisalmer circle.
corrigendum : new 33 by 11 kv sub-stations augmentation or addition capacity including associated line and other works for the development of distribution infrastructure in jdvvnl under rdss scheme on turnkey mode under bikaner(dungargarh and nokha)circle.
design, engineering, manufacturing, supply, erection, testing, and commissioning of 220kv & 66kv gis equipments & materials on turnkey basis including civil works for 220kv godadara gis substation
site survey including underground utility verification, engineering, procurement, supply, loading, transportation, unloading, insurance, delivery at site, handling, storage, installation, testing, commissioning including documentation of all items/material required to complete works for turnkey based contract for conversion of existing overhead lt line network including consumer service lines into under ground cable network using fsp/msp & ring main system at kalawad road sub division of rajkot city-3 division of rajkot city circle under pgvcl with gis mapping / geo urja mapping (developed by guvnl) and asset tagging under gujarat wire free city mission. (package-16)
corrigendum : renovation, modernization and upgradation of kulhal hydroelectric project on turn key basis
site survey including underground utility verification, engineering, procurement, supply, loading, transportation, unloading, insurance, delivery at site, handling, storage, installation, testing, commissioning including documentation of all items/material required to complete works for turnkey based contract for conversion of existing overhead lt line network including consumer service lines into under ground cable network using fsp/msp & ring main system at ranchhodnagar sub division of rajkot city-1 division of rajkot city circle under pgvcl with gis mapping / geo urja mapping (developed by guvnl) and asset tagging under gujarat wire free city mission. (package-3)
site survey including underground utility verification, engineering, procurement, supply, loading, transportation, unloading, insurance, delivery at site, handling, storage, installation, testing, commissioning including documentation of all items/material required to complete works for turnkey based contract for conversion of existing overhead lt line network including consumer service lines into under ground cable network using fsp/msp & ring main system at mahila college sub division of rajkot city-2 division of rajkot city circle under pgvcl with gis mapping / geo urja mapping (developed by guvnl) and asset tagging under gujarat wire free city mission. (package-9)
site survey including underground utility verification, engineering, procurement, supply, loading, transportation, unloading, insurance, delivery at site, handling, storage, installation, testing, commissioning including documentation of all items/material required to complete works for turnkey based contract for conversion of existing overhead lt line network including consumer service lines into under ground cable network using fsp/msp & ring main system at sorathiawadi sub division of rajkot city-1 division of rajkot city circle under pgvcl with gis mapping / geo urja mapping (developed by guvnl) and asset tagging under gujarat wire free city mission. (package-5)
capex rate contract category- i rs. 0 to 3.00 lacs for carrying out maintenance and low value capital jobs of mechanical, civil and electrical nature at retail outlets including ksks and consumer outlets under bangalore, belgaum, mangalore,
site survey including underground utility verification, engineering, procurement, supply, loading, transportation, unloading, insurance, delivery at site, handling, storage, installation, testing, commissioning including documentation of all items/material required to complete works for turnkey based contract for conversion of existing overhead lt line network including consumer service lines into under ground cable network using fsp/msp & ring main system at udyognagar sub division of rajkot city-2 division of rajkot city circle under pgvcl with gis mapping / geo urja mapping (developed by guvnl) and asset tagging under gujarat wire free city mission. (package-13)
construction of phulbari in stream storage structure across river sapei near village phulbari in bargaon block of sundargarh district in state of odisha on epc turn key basis including power connectivity system and operation and maintenance - construction of phulbari instream storage structure across river sapei near village phulbari in bargaon block of sundargarh district in state of odisha on epc turn key basis including power connectivity system and operation and maintenance
corrigendum : construction of iss at sarsara balitikra across river jeera in bargarh district odisha on epc turnkey basis including power connectivity system and operation and maintenance for five years
site survey including underground utility verification, engineering, procurement, supply, loading, transportation, unloading, insurance, delivery at site, handling, storage, installation, testing, commissioning including documentation of all items/material required to complete works for turnkey based contract for conversion of existing overhead lt line network including consumer service lines into under ground cable network using fsp/msp & ring main system at pradyumannagar sub division of rajkot city-2 division of rajkot city circle under pgvcl with gis mapping / geo urja mapping (developed by guvnl) and asset tagging under gujarat wire free city mission. (package-10)
corrigendum : establishment of centralized transmission asset management service for remote operation of dvc substations.
site survey including underground utility verification, engineering, procurement, supply, loading, transportation, unloading, insurance, delivery at site, handling, storage, installation, testing, commissioning including documentation of all items/material required to complete works for turnkey based contract for conversion of existing overhead lt line network including consumer service lines into under ground cable network using fsp/msp & ring main system at aji industrial sub division of rajkot city-1 division of rajkot city circle under pgvcl with gis mapping / geo urja mapping (developed by guvnl) and asset tagging under gujarat wire free city mission. (package-7)
corrigendum : new 33 by 11 kv sub-stations augmentation or addition capacity including associated line and other works for the development of distribution infrastructure in jdvvnl under rdss scheme on turnkey mode under phalodi circle.
site survey including underground utility verification, engineering, procurement, supply, loading, transportation, unloading, insurance, delivery at site, handling, storage, installation, testing, commissioning including documentation of all items/material required to complete works for turnkey based contract for conversion of existing overhead lt line network including consumer service lines into under ground cable network using fsp/msp & ring main system at kothariya road sub division of rajkot city-1 division of rajkot city circle under pgvcl with gis mapping / geo urja mapping (developed by guvnl) and asset tagging under gujarat wire free city mission. (package-6)
corrigendum : new 33 by 11 kv sub-stations augmentation or addition capacity including associated line and other works for the development of distribution infrastructure in jdvvnl under rdss scheme on turnkey mode under bikaner(ddi ddii and khajuwala)circle.
utility shifting in kharagpur-tatanagar 4th line (upto rakha mines station), nimpura west outer cabin to midnapur, hijli to nimpura through yard 3rd line and any other location as per the requirement under the jurisdiction of dy ce/con/ii/kharagpur of s. e. railway, kharagpur.
corrigendum : construction of 132/33 kv, 2x80 mva gis substation at shiv enclave (sanganer), jaipur alongwith associated transmission lines including survey, supply of all equipments materials, erection (including civil works), testing and commissioning
work of replacement of existing 0.2 acsr panther conductor along with necessary hardware, insulator string by equivalent hpc of 132kv pandharpurutopian- welspun- mangalwedha line (48.95ckm) & 132kv pandharpurnimboni - mangalwedha line (58.75ckm) under jurisdiction of ehv o&m division, solapur under ehv pc o&m zone, pune.- 1st call.
corrigendum : modification/shifting of existing eht/ht/lt power line crossings and shifting of electrical utilities in connection with various railway projects under construction organization
corrigendum : new 33 by 11 kv sub-stations augmentation or addition capacity including associated line and other works for the development of distribution infrastructure in jdvvnl under rdss scheme on turnkey mode under jalore balotra hanumangarh and sriganganagar
design, supply, erection, testing and commissioning of 2x25 kv auto-transformer (at) feeding system, including 220/55 kv makkajipalli (mkj) traction substations, dharmavaram (dmm) sectioning posts (sps), nagasamudram (ngm) and penukonda (pkd) sub-sectioning posts (ssps), in bangalore-dharmavaram section in bangalore division of south western railway
riverfront development project phase-i of amreli, dist. amreli, gujarat under sjmmsvy (re invitation) : construction of riverfront development work phase-i (civil, electrical, water supply, sewerage, storm water, irrigation & horticulture works including 3 years of maintenance after commissioning) for phase-01 from somnath mahadev mandir bridge to kamnath bridge for 0.76 km of thebi riverbank and from amreli kukavav bridge to kamnath bridge for 0.89 km of vadi riverbank within town of amreli, dist. amreli, gujarat under programme of sjmmsvy
est. no. sr/mesd/ms/8345/ 2025-26 - est. no. sr/mesd/ms/8345/ 2025-26 providing renovation, addition and alterations to e.i., lan networking, air conditioning system, lifts, fire alarming, fire fighting system and audio video system to the air india building, nariman point, mumbai.
corrigendum : new 33 by 11 kv sub-stations augmentation or addition capacity including associated line and other works for the development of distribution infrastructure in jdvvnl under rdss scheme on turnkey mode under barmer circle.
construction of bharatpur iss across river ichha near village bharatpur in lephripada block of sundargarh district in state of odisha on epc turnkey basis including power connectivity system and operation and maintenance of complete commissioned
s&t works comprising trenching, laying of cables, construction of foundations, erection of location boxes, signals and other outdoor equipment, associated wiring in connection with the yard remodeling of 05 stations (talodhi, rajoli, mul-maroda, kelzar and chandafort), including design, supply, installation, testing and commissioning of new ei, msdac, ips, lc gate etc., subsequent modifications to ei systems and associated indoor and outdoor s&t works in station yards and block sections, and s&t works in facilitation of engineering works, in connection with the doubling work of the gondia-chandafort section.
1) navsari district jail special repair (8th attempt): special repair works for the store building at navsari district jail, including electrification components., 2) navsari police infrastructure repair (4th attempt): special repair works at the sp office, town police station, savar police line, and new police line in navsari., 3) savar police line demolition: demolition of the deputy sp building (quarter guard), deputy sp building (old lcb office), and d-06 officer building at savar police line, navsari (including debris removal and land leveling)., 4) surat emrs campus construction (deposit work - gstes): construction of school building, boys hostel (g+2), girls hostel (g+2), kitchen dining hall, staff quarters, class-4 staff quarters, and campus development at mangrol (laveth), surat (includes electrification, furniture, and fire-fighting setup)., 5) valsad emrs campus construction (deposit work - gstes): construction of school building, boys hostel (g+2), girls hostel (g+2), kitchen dining hall, staff quarters, class-4 staff quarters, and campus development at umargam, valsad (includes electrification, furniture, and fire-fighting setup). (gujarati document)
construction of school building (g+2), boys hostel (g+2), girls hostel (g+2), staff quarters (g+2), mess building (g+1), class-iv quarters (g.f), infrastructure etc. for emrs school campus at umargam, dist.- valsad (including electrification & fire fighting system) (gstes priority - 2024-25) (deposit work) (first attempt)
construction of model bus station at kuppam, chittoor district (including civil works, yard work, water supply & sanitary arrangements, electrification, firefighting system, havc works, cctv and pa system, stp works and land scrapping works) (payment mode through nidhi portal govt. of ap)
corrigendum : design and construction of multi storied, type-ii, type-iii, type-iv and type-v staff quarters, divisional store depot, training institute including electrical general works and allied works at rayagada and area office at koraput in connection with setting up of rayagada division in east coast railway on engineering, procurement & construction (epc) mode
development, beautification and construction work of kharun river front including electrification work in district raipur. (dn. no. 1, raipur).
1) vadodara central jail infrastructure (1st attempt) (sbd): construction of opd room, vocational training center, canteen, open air theater, and hardcore cell at vadodara central jail, vadodara district (including electrification components)., 2) emrs school complex construction (1st attempt) (sbd): construction of school building, boys & girls hostels, staff quarters, mess building, class iv quarters, and campus infrastructure development for the emrs school complex at ranjitnagar, ghoghamba, panchmahal district (including electrification components).. (gujarati document)
construction of school building, boys & girls hostels, staff quarters, mess building, class iv quarters, infrastructure etc. for emrs school complex at ranjitnagar - ghoghamba, district panchmahal. (including electrification and fire fighting system) (deposit work) (g.s.t.e.s priority - 2024-25) [1st attempt]
34-1 - construction of advanced training centre for instructor at i.t.i. aundh, pune. (including electrical work)
construction of school building (g+2), boys hostel (g+2), girls hostel (g+2), staff quarters (g+2), mess building (g+1), class-iv quarters (g.f), infrastructure etc. for emrs school campus at mangrol (laveth), dist.- surat (including electrification & fire fighting system) (gstes priority - 2024-25) (deposit work)
1 dismentaling of c type quarter at sub jail godhra dist panchmahal 2 dismentaling of c type quarter and toilet room at sub jail chhotaudepur 3 construction of psi-1 & 2 room at virpur police station, dist mahisagar (including electrification) 4 special repair to cat b-48 (railway police staff quarter) at srp gr-05 godhra dist panchmahal (including electrification) 5 special repair to cat morva hadaf police line, dist panchmahal (including electrification) 6 construction of school building, girls hostel, staff quarters, mess building, class iv quarters, infrastructure etc. for girls school complex at muvada vadoth taluka pavijetpur dist. chhota udepur (including electrification)
construction of school building, girls hostel, staff quarters, mess building, class iv quarters, infrastructure etc. for girls school complex at muvada vadoth taluka pavijetpur dist. chhotaudepur (including electrification & fire fighting system) (deposit work) (g.s.t.e.s priority - 2024-25) [1st attempt]
construction of high level laboratory to upgrade sickle cell institute c.g. as a center of excellence at raipur, i/c. water supply, sanitery fittings & electrification work at distt. raipur,c.g.(division no. 2, raipur).