FILTERS
setting up of 1500 mw/6000 (for 4-hour and >1 cycle ) mwh standalone battery energy storage systems under tariff based global competitive bidding in rajasthan with/without viability gap funding support under boo model.
View Insights
composite work (civil, electrical & s&t) comprising formation, viaducts, minor/major bridges, rubs/subways, station buildings, staff quarters, platforms, passenger amenities, supply & spreading of ballast, track linking and p-way works, along with design, supply, erection, testing & commissioning of 25 kv ac ohe and supply, installation, testing & commissioning of telecom outdoor systems including trenching, laying, blowing, splicing & jointing of 48f x 2 ofc on both sides of the track, one-side quad cable, emergency communication system and other associated works between tanda road (excluding) to jamaniya (including) from km 101.29 to km 125.92 (length: 24.63 km) in connection with the chhotaudepur-dhar new broad gauge line project in vadodara division of western railway.
corrigendum : jeypore-malkangiri new bg railway line: design & construction of new bg railway line from km 41.50 to km 69.60 (including nunkhari station) involving earthwork in formation, embankment/cutting, blanketing, side drains, catch water drains, minor bridges, major bridge, road under bridge (rubs), viaducts, tunnels, protection works, blt works, p.way track works with contractor's own materials (except new/sh rails), construction of platforms, station buildings, service buildings, sp/ssp buildings and residential buildings, water supply, indoor and outdoor electrification, provision of 1x25 kv conventional type ohe, tunnel ohe with rocs, tunnel lighting, tss, sp, general power supply arrangements modifications/conversion to underground for overhead electrical ht/lt power line crossings etc on epc basis in waltair division of east coast railway.
composite work (civil, electrical & s&t) comprising formation, viaducts, minor/major bridges, rubs/subways, station buildings, staff quarters, platforms, passenger amenities, supply & spreading of ballast, track linking and p-way works, along with design, supply, erection, testing & commissioning of 25 kv ac ohe and supply, installation, testing & commissioning of telecom outdoor systems including trenching, laying, blowing, splicing & jointing of 48f x 2 ofc on both sides of the track, one-side quad cable, emergency communication system and other associated works between jamaniya (excluding) to tirla (excluding) from km 125.92 to km 147 (21.08 km) in connection with the chhotaudepur-dhar new broad gauge line project in vadodara division of western railway.
corrigendum : jeypore-malkangiri new bg railway line: design & construction of new bg railway line from km 69.60 to km 125.18 involving earthwork in formation , embankment/cutting, blanketing, side drains, catch water drains, minor bridges, major bridge, road under bridge (rubs), road over bridge (rob's), protection works, p.way track works with contractor's own materials(except new/sh rails) construction of platforms, station buildings, service buildings, sp/ssp buildings and residential buildings, water supply, indoor and outdoor electrification, provision of 1x25 kv conventional type ohe, provision of 2 nos. tss, 1 no sp, construction of new sub-stations, electrification of station building, circulating areas, fobs, pfs, quarters, goomties, modification/conversion to underground for overhaed electrical ht/lt power line crossings etc. on epc basis in rayagada division of east coast railway.
corrigendum : gunupur-theruvali new bg line project : design and construction of new bg railway line from km 122.750 to km 141.940 (excluding rcc box, rob br. no 388 from km 137.725 to 137.925 but including p way & ohe works) involving 08 nos of tunnels (t-2 to t-9) & from km 110.02 to km 113.12 involving 1 no tunnel(t-1), blt works & its approaches and earthwork in formation in embankment/cutting, blanketing, side drains, catch water drains, minor bridges, major bridge, road over bridge (robs), road under bridge (rubs), protection works, p.way track works with contractor's own material supplies including supply of track ballast, new wide based psc sleeper, special psc sleepers (for turnouts, improvised sejs, guard rails etc), point (thick web switches & wcms crossing, glued joints, h- beam/ composite sleepers over girder bridges, improvised sejs, all p-way fittings, ohe foundations, supply and erection of ohe masts, provision of 1x25 kv conventional type ohe (ohe-22.660tkm) including 2.86 km rocs in tunnel, provision of one feeding post (tss) modifications/conversion to underground for overhead electrical ht/lt power line crossings, construction of platforms, station buildings, fob, service buildings, sp/ssp buildings and residential buildings, water supply, indoor and outdoor electrification works etc in waltair division of east coast railway.
construction of 3rd line work including earthwork, blanketing, minor bridges, major bridges, lc work and other miscellaneous works for 25.0t and dfc feeder route of indian railway standard loading, execution of indoor & outdoor s&t works, execution of general electrical works, installation and commissioning of 2x25 kv overhead equipment (ohe) for traction and power supply in connection with the 3rd line work of chandil- madhukunda section in adra division of south eastern railway on engineering, procurement & construction (epc) mode.
design, engineering, manufacturing, supply, erection, testing & commissioning of 125 mvar statcom at 220kv sagapara substation on turnkey basis including civil works
design, engineering, manufacturing, supply, erection, testing & commissioning of 125 mvar statcom at 220kv tharad substation on turnkey basis including civil works
design, supply, erection, testing and commissioning of 400/220kv equipments and materials on turnkey basis including civil works for 400kv dholera-ii gis substation.
corrigendum : cluster c implementation of standalone battery energy storage system (bess) of 41mw/102.5mwh capacity at uttarkashi, haridwar, roorkee, tehri upcl under capacity charged based competitive bidding mechanism
corrigendum : 400kv transformer package 4tr-22 bulk for 4 x 500 mva, 400/220/33kv 3 ph transformers under bulk procurement of 765kv & 400kv class transformers and reactors of various capacities (lot -8).
site survey including underground utility verification, engineering, procurement, supply, loading, transportation, unloading, insurance, delivery at site, handling, storage, installation, testing, commissioning including documentation of all items/material required to complete works for turnkey based contract for conversion of existing overhead lt line network including consumer service lines into under ground cable network using fsp/msp & ring main system at mavdi road sub division of rajkot city-3 division of rajkot city circle under pgvcl with gis mapping / geo urja mapping (developed by guvnl) and asset tagging under gujarat wire free city mission. (package-18)
construction of doubling of track work including earthwork, blanketing, minor bridges, lc work and other miscellaneous works for 25t indian railway standard loading, execution of indoor & outdoor s&t works, execution of general electrical works, installation and commissioning of 2x25 kv overhead equipment (ohe) for traction and power supply in connection with the adra-sanka-rukni doubling project of adra division, south eastern railway on engineering, procurement & construction (epc) mode.
site survey including underground utility verification, engineering, procurement, supply, loading, transportation, unloading, insurance, delivery at site, handling, storage, installation, testing, commissioning including documentation of all items/material required to complete works for turnkey based contract for conversion of existing overhead lt line network including consumer service lines into under ground cable network using fsp/msp & ring main system at nanamava sub division of rajkot city-3 division of rajkot city circle under pgvcl with gis mapping / geo urja mapping (developed by guvnl) and asset tagging under gujarat wire free city mission. (package-17)
construction of 132/33 kv, 2x50 mva gis substation at hathi bhata (ajmer) alongwith associated transmission lines including survey, supply of all equipments/materials, erection (including civil works), testing and commissioning
construction of various 220 kv and 132 kv transmission lines associated with proposed 220 kv gss lohawat including survey, supply of all equipments/materials, erection ( including civil works), testing and commissioning on turnkey basis against specification no. rvpn/ehv/bn-9019002612
site survey including underground utility verification, engineering, procurement, supply, loading, transportation, unloading, insurance, delivery at site, handling, storage, installation, testing, commissioning including documentation of all items/material required to complete works for turnkey based contract for conversion of existing overhead lt line network including consumer service lines into under ground cable network using fsp/msp & ring main system at morbi-road sub division of rajkot city-1 division of rajkot city circle under pgvcl with gis mapping / geo urja mapping (developed by guvnl) and asset tagging under gujarat wire free city mission. (package-8)
site survey including underground utility verification, engineering, procurement, supply, loading, transportation, unloading, insurance, delivery at site, handling, storage, installation, testing, commissioning including documentation of all items/material required to complete works for turnkey based contract for conversion of existing overhead lt line network including consumer service lines into under ground cable network using fsp/msp & ring main system at laxminagar sub division of rajkot city-2 division of rajkot city circle under pgvcl with gis mapping / geo urja mapping (developed by guvnl) and asset tagging under gujarat wire free city mission. (package-12)
corrigendum : design, supply, erection, testing and commissioning for ohe upgradation from existing 1x25kv system to 2x25kv at feeding system with feeder and earthing works in mahabubnagar(mbnr)(incl)-secunderabad(sc)(incl)-medchal(med)(incl) section of hyderabad division under south central railway. total 141 rkm/282 tkm