FILTERS
corrigendum : construction of sarkhej-dholera semi high-speed double railway line, including spur lines to lothal nmhc and dholera airport terminal; comprising civil works, which includes formation & viaduct, bridges, station buildings, & associated works; track system (ballasted & blt), overhead traction system including electrical general services; signalling & telecommunication system, operating control centre, integration of all systems complete in all respect including testing & commissioning and all appurtenant works under jurisdiction of western railway
View Insights
corrigendum : nhidcl/assam/record of discussion/2025 - construction of 4 lane twin tube road cum rail underwater tunnel under river brahmaputra, including 4 lane approaches along with provision of railway infrastructure in one of the tubes, in the state of assam on epc mode
corrigendum : lot-1- construction of diversion tunnels, cofferdams, main dam including hm works of diversion tunnels, approach roads and bridges of kamala h.e. project (1720mw), kamle district, arunachal pradesh
engineering procurement and construction (epc) of construction of viaducts, ror/rfo, major bridges, minor bridges, animal underpass, rub/lhs, tunnel/cut- cover, earthwork, blanketing, trolley refuge, turfing, buildings, retaining wall, toe wall etc. and other associated worksfor construction of new double line track for dfcc loading from ch.158.00 to ch.184 in koderma detour section in sonnagar- andal 3rd and 4th line project on epc mode in dhanbad division of east central railway.
construction of new bg double line from balodabazar (km 110.500) to parmalkasa (km 280.840) and y-connectivities from lakholi station and marauda y cabin including earthwork, bridges, rail over rail (ror) bridge , road over bridge (rob), road under bridge (rub), station buildings, track works, electrification, signaling &telecommunication works, and allied miscellaneous works in connection with kharsia- naya raipur-parmalkasa 5th & 6th line project under south east central railway in the state of chhattisgarh.
nhidcl/dpr/jk /c-k(tunnels)/2017 - construction of uni-directional singhpora - vailoo twin tube tunnel (under sinthan pass) and its approach roads on kishtwar - vailoo - khanabal section of nh-244 in the union territory of jammu and kashmir on epc mode
corrigendum : construction of 6 lane road tunnel for nh 148ae connecting dwarka expressway nh 248bb with nelson mandela marg vasant kunj in the state of delhi on ham mode
nhidcl/jk/nh-244/ s-dtunnel/2020-21 - construction of uni-directional sudhmahadev -dranga twin tube tunnels and its approach roads on chenani - sudhmahadev - goha section of nh-244 in the union territory of jammu and kashmir on epc mode
corrigendum : construction of civil works of barrage and stilling basin, u/s plastic cutoff trench, power intake structures, tunnel, outfall structure, associated hm works including adit plug, etc and associated works of link-3 project in himachal pradesh
composite work (civil, electrical & s&t) comprising formation, viaducts, minor/major bridges, rubs/subways, station buildings, staff quarters, platforms, passenger amenities, supply & spreading of ballast, track linking and p-way works, along with design, supply, erection, testing & commissioning of 25 kv ac ohe and supply, installation, testing & commissioning of telecom outdoor systems including trenching, laying, blowing, splicing & jointing of 48f x 2 ofc on both sides of the track, one-side quad cable, emergency communication system and other associated works between tanda road (excluding) to jamaniya (including) from km 101.29 to km 125.92 (length: 24.63 km) in connection with the chhotaudepur-dhar new broad gauge line project in vadodara division of western railway.
corrigendum : jeypore-malkangiri new bg railway line: design & construction of new bg railway line from km 41.50 to km 69.60 (including nunkhari station) involving earthwork in formation, embankment/cutting, blanketing, side drains, catch water drains, minor bridges, major bridge, road under bridge (rubs), viaducts, tunnels, protection works, blt works, p.way track works with contractor's own materials (except new/sh rails), construction of platforms, station buildings, service buildings, sp/ssp buildings and residential buildings, water supply, indoor and outdoor electrification, provision of 1x25 kv conventional type ohe, tunnel ohe with rocs, tunnel lighting, tss, sp, general power supply arrangements modifications/conversion to underground for overhead electrical ht/lt power line crossings etc on epc basis in waltair division of east coast railway.
construction of 10 nos. elevated metro stations and viaduct, from baranagar metro station (excluding) to mangal pandey metro station (ch: 4.68 km to ch: 16.98 km approx.) in connection with baranagar- barrackpore metro corridor of kolkata metro railway line.
package- bbvs: "construction of 10 nos. elevated metro stations and viaduct from baranagar metro station (excluding) to mangal pandey metro station (ch: 4.68 km to ch: 16.98 km approx.) in connection with baranagar- barrackpore metro corridor of kolkata metro railway line, west bengal, india".
corrigendum : part design and construction of elevated viaduct, at-grade viaduct, sidings, elevated ramps, entry/exit line to depot, and ten elevated station and one at grade station including civil works excluding architectural finishes and peb of mrts phase-iv.
corrigendum : design andconstruction of elevated viaduct and 12 elevated stations (including architectural finishing) viz. collectorate, panipech, ambabari, chomu puliya, vidhya nagar sec-2, vidhya nagar, vki road no 5, vki road no 9, vki road no. 14, harmada, harmada ghati & todi mod under jaipur metro phase- ii mrts
composite work (civil, electrical & s&t) comprising formation, viaducts, minor/major bridges, rubs/subways, station buildings, staff quarters, platforms, passenger amenities, supply & spreading of ballast, track linking and p-way works, along with design, supply, erection, testing & commissioning of 25 kv ac ohe and supply, installation, testing & commissioning of telecom outdoor systems including trenching, laying, blowing, splicing & jointing of 48f x 2 ofc on both sides of the track, one-side quad cable, emergency communication system and other associated works between jamaniya (excluding) to tirla (excluding) from km 125.92 to km 147 (21.08 km) in connection with the chhotaudepur-dhar new broad gauge line project in vadodara division of western railway.
corrigendum : engineering, procurement and construction (epc) agreement with schedule g-1 for third line track between manikpur (excluding) to iradatganj (including) (ch: 1257.180 to 1340.820) including electrification & signaling works along with construction of rob on lc no. 404/c2, 406/2t, 407/2e & 418c/2e and rub in lc no 426 in connection with manikpur-iradatganj 3rd line project of north central railway
1) design and construction of elevated viaduct and 11 elevated stations (including architectural finishing) viz. b2 bypass circle, durgapura, gopalpura, gandhinagar, nehru place, ram bagh circle, narayan circle, sms hospital, ashok marg, government hostel and khasa kothi (phase-ii), architectural finishing works of 10 stations viz. prahladpura, manpura, bilwa kalan, bilwa, goner mod, sitapura, jecc, kumbha marg, haldighati gate and pinjrapole gaushala; modification of part operational corridor of phase-1 and constructing khasa kothi (phase-1) station under jaipur metro phase- ii mrts, 2) design and construction of elevated viaduct and 12 elevated stations (including architectural finishing) viz. collectorate, panipech, ambabari, chomu puliya, vidhya nagar sec-2, vidhya nagar, vki road no 5, vki road no 9, vki road no. 14, harmada, harmada ghati & todi mod under jaipur metro phase- ii mrts.
construction of new railway bg line in km 28/970 to 42/040 in between kulthana including and rajpura stations including earthwork, minor bridges (03 nos) and major bridges (07 nos), station buildings, tunnels (7 nos) and mega bridge ( 03 nos) in connection with ratlam mhow khandwa gauge conversion in the state of madhya pradesh
pre-bid assistance for preparation of priced boq for the tender- construction of new railway bg line in km 28.970 to 42.040 in between kulthana station (including) and rajpura station (including) earthwork, minor bridges (03 nos) and major bridges (07 nos), station buildings, tunnels (7 nos) and mega bridge (03 nos) including electrification in connection with ratlam mhow khandwa gauge conversion in the state of madhya pradesh
corrigendum : jeypore-malkangiri new bg railway line: design & construction of new bg railway line from km 69.60 to km 125.18 involving earthwork in formation , embankment/cutting, blanketing, side drains, catch water drains, minor bridges, major bridge, road under bridge (rubs), road over bridge (rob's), protection works, p.way track works with contractor's own materials(except new/sh rails) construction of platforms, station buildings, service buildings, sp/ssp buildings and residential buildings, water supply, indoor and outdoor electrification, provision of 1x25 kv conventional type ohe, provision of 2 nos. tss, 1 no sp, construction of new sub-stations, electrification of station building, circulating areas, fobs, pfs, quarters, goomties, modification/conversion to underground for overhaed electrical ht/lt power line crossings etc. on epc basis in rayagada division of east coast railway.
corrigendum : construction of viaducts at 12 locations cut and cover tunnel at 02 locations and pedestrian underpass (pup) at 01 location from km 517.250 to km 547.080 section of new nh-66 (old nh-47) in the state of kerala on epc mode
construction of 4.97 km elevated viaduct from koteshwar road dead end to start of ramp of underground section, including 4 nos. elevated stations viz. ashram road, koteshwar prachin mandir, sabarmati river, sardar nagar and design, construction and completion of 1.01 km of underground section comprising of twin cut & cover tunnel between ramp to dead end, including ramp and 01 no. underground metro station for ahmedabad metro rail project, phase-2a
corrigendum : construction of additional major bridge and its approaches across river teesta (at sevoke) starting around km 591.310 of nh-10 (old nh-31) in the district of darjeeling west bengal on epc mode under nh(o)
construction of additional major bridge and its approaches across river teesta (at sevoke) starting around km 591.310 of nh-10 (old nh-31) in the district of darjeeling, west bengal on epc mode under nh(o)
working survey, design & construction of intake well with approach bridge, providing, supplying, lowering, laying and jointing various dia. of di-k9/ms rising main pipelines, rcc sump, pump house, staff quarter, compound wall, supplying and erecting pumping machinery including all electro-mechnical-instrumentation and scada works at various hws to shws under water supply scheme based on bhadbhut barrage (rhs) for industries (gidc) and rural areas of bharuch and vadodara districts with 10 years of comprehensive o&m of entire scope of work. dist.: bharuch
corrigendum : construction of uni-directional twin tunnels including approach roads across fotu la pass on nh-01 (leh-kargil highway) in the union territory of ladakh
corrigendum : construction of iconic hybrid cable stayed and suspension bridge across krishna river on nh -167k (design chainage km 87.360 to km 88.437) in the states of telangana and andhra pradesh on engineering, procurement and construction (epc) basis
corrigendum : development of yuge yugeen bharat museum (yybm), new delhi - package -1. (sh: ticketing plaza, service tunnel, facade & courtyard works, lifts, mep services and equipment) subwork/packages: ticketing plaza, service tunnel, facade & courtyard works, lifts, mep services and equipment
corrigendum : construction of 03 nos. of 3 lane robs and 07 no of vups on 6l delhi agra section old nh-2 (new nh 44 and 19) from km. 20.500 to km. 200.000 in the state of haryana and uttar pradesh on epc mode.
corrigendum : gunupur-theruvali new bg line project : design and construction of new bg railway line from km 122.750 to km 141.940 (excluding rcc box, rob br. no 388 from km 137.725 to 137.925 but including p way & ohe works) involving 08 nos of tunnels (t-2 to t-9) & from km 110.02 to km 113.12 involving 1 no tunnel(t-1), blt works & its approaches and earthwork in formation in embankment/cutting, blanketing, side drains, catch water drains, minor bridges, major bridge, road over bridge (robs), road under bridge (rubs), protection works, p.way track works with contractor's own material supplies including supply of track ballast, new wide based psc sleeper, special psc sleepers (for turnouts, improvised sejs, guard rails etc), point (thick web switches & wcms crossing, glued joints, h- beam/ composite sleepers over girder bridges, improvised sejs, all p-way fittings, ohe foundations, supply and erection of ohe masts, provision of 1x25 kv conventional type ohe (ohe-22.660tkm) including 2.86 km rocs in tunnel, provision of one feeding post (tss) modifications/conversion to underground for overhead electrical ht/lt power line crossings, construction of platforms, station buildings, fob, service buildings, sp/ssp buildings and residential buildings, water supply, indoor and outdoor electrification works etc in waltair division of east coast railway.
engineering, procurement and construction (epc) tender for"construction of doubling work including earth work, blanketing, minor bridges, major bridges, utility shifting, station & other buildings, platform work, circulating area, lc work and other miscellaneous works for 25t indian railway standard loading from raxaul (excl.) to narkatiaganj (excl.) (i.e. ch.189.400 to 227.200) (total- 37.80 km) in connection with doubling of raxaul - narkatiaganj section in samastipur division of east central railway"
construction of 3rd line work including earthwork, blanketing, minor bridges, major bridges, lc work and other miscellaneous works for 25.0t and dfc feeder route of indian railway standard loading, execution of indoor & outdoor s&t works, execution of general electrical works, installation and commissioning of 2x25 kv overhead equipment (ohe) for traction and power supply in connection with the 3rd line work of chandil- madhukunda section in adra division of south eastern railway on engineering, procurement & construction (epc) mode.
engineering procurement and construction (epc) for "construction of doubling work including earthwork, blanketing, minor bridges, major bridges, lhs/rubs, track works, platform work, station building, fobs, other buildings, associated s&t and electrical utility shifting works and associated miscellaneous works for 25t indian railway standard loading from karnauti station(including-ch. 2.844 km) to bihar sharif station(excluding-ch 29.350 km), from ch. 1.900 km to 28.192 km (total- 26.292 km) in connection with the doubling of the bakhtiyarpur-rajgir - tilaiya section"
jeypore - nabarangpur new bg railway line project: design & construction of new bg railway line between ambaguda(excluding) (13.60 km) to nabarangpur(including) (43.996km) involving earthwork in formation in embankment/cutting, blanketing, side drains, catch water drains, minor bridges, major bridges(excluding bridge no. 85 at km. 37.080 i.e. indravati bridge), road over bridges (robs), road under bridges (rubs), protection works, p.way track works with contractor's own material supplies including supply of track ballast, new wide based psc sleepers, special psc sleepers (for turnouts, improvised sejs, guard rails etc), points (thick web switches) & wcms crossings, glued joints, h-beam/composite sleepers over girder bridges, improvised sejs, all p-way fittings, 2x25 kv ac ohe works, 2x25 kv tss with sp/ssp works along with scada, modification/conversion to underground for overhead electrical ht/lt power line crossings, electrical general services, construction of platforms, station buildings, service buildings, sp/ssp buildings, trd depot building with tower wagon shed, residential buildings, water supply, indoor and outdoor electrification etc. on epc basis in rgda division of east coast railway"
working survey, design & construction of intake well with approach bridge, providing, supplying, lowering, laying and jointing various dia. of di-k9/ms rising main pipelines, rcc sump, pump house with panel room, staff quarter, compound wall, office building, supplying and erecting pumping machinery including all electro-mechanical-instrumentation and scada works at various hws to shws under water supply scheme based on bhadbhut barrage (lhs) for industries (gidc) and rural areas of bharuch and surat districts with 10 years of comprehensive o&m of entire scope of work. dist.: bharuch & surat
providing project general management services for various constructionsites/sections for new line, doubling, bypass line, rob/rubs projectsbeing executed by construction organization in the jurisdiction of northwestern railway.
corrigendum : execution of earthwork in formation, minor bridges, major bridges, station buildings, service buildings, p-way linking work, ballast supply, platform work , pf shelter, drain work, camping facilities, protection works, tunnel between ch: 116.205 km to ch: 116.415 km, and other allied works between barkote(ex) (ch: 98.325 km) - mahuldiha(ex) (ch: 117.525 km) including ambagaon yard in connection with talcher - bimalagarh new bg rail link project.
construction of road over bridge (rob) including roads and allied facilities at tuna tekra on engineering, procurement and construction (epc) mode
construction of four lane railway over bridge cum elevated corridor in lieu of lc no.28 on ahmedabad- botad railway line on 60.0 m wide tp road connecting sarkhej circle to sanand sarkhej road crossing over l. j circle and sanand junction at s.g. hightway, ahmedabad - on epc mode.
construction of twelve mega/major bridges between ambamahuda and kui in c/w taranga hill abu road via ambaji new bg line project in ajmer division.
corrigendum : construction of 6 lane viaduct and service road from baikampady (km.365.200) to kiocl junction (km.368.275) of nh-66 in the state of karnataka on epc mode
earthwork in formation, construction of major & minor bridges, retaining wall, drains, supply of ballast, p. way materials & track linking works, construction of building and allied works from ch 9/190 km (take-off) to ch 15/342 km (de) in connection with proposed siding for the work of rail connectivity for proposed phase-ii silo (02 nos. -20mty) at lakhanpur area of mcl at jharsuguda, odisha. pkg-ii
mcl lakhanpur phase ii - earthwork in formation, construction of major minor bridges, retaining wall, drains, supply of ballast, p. way materials track linking works, construction of building and allied works from ch 9/190 km takeoff to ch 15/342 km de in connection
corrigendum : construction of a new diversion-cum- sediment bypass tunnel for restoration of concrete dam construction sluices and sediment management of salal reservoir
engineering, procurement and construction (epc) agreement for construction of new bg rail line including earth work, blanketing, minor bridges, major bridges, track works, station building, buildings and other miscellaneous works for 25t indian railway standard loading from sitamarhi (excluding) to rewasi (including) (i.e.ch. 0.700 to 12.400) (total length = 11.70km) in connection with sitamarhi-sheohar new bg rail line project in east central railway in the state of bihar
construction of two lane bridge across mahisagar river on gj sh-11, gotri-sevasi-sindhrot road km. 8/800 to 9/400 dist. vadodara
request for proposal for engineering, procurement & construction (epc) mode for construction of major bridges (34 nos) between hosapete (excl.) and ballari (excl.) stations, as part of ballari- hosapete 3rd & 4th line project.