FILTERS
supply of supply of handrail fixing arrangement for lavatory and electrical cubicle of vande bharat co aches as per drg no train 18/dtc/ac-6-4-006(item 6 and 7) and train 18/dtc/ac6-4-005 (item 6,7 and 8). material and specifications to be as per drg [ warranty period: 30 months after the date of delivery ] ] carriage finishing shop - supply of handrail fixing arrangement for lavatory and electrical cubicle of vande bharat.
View Insights
supply of entrance hand rail complete as per drawing no. mi004202 alt-c. packing instructio n -pi012. [ warranty period: 30 months after the date of delivery ] ] - entrance hand rail complete
annual plan-erattupetta muncipality project no 24/26-27-kalloothazham maddrassa vaniyappura road handrail construction ward 2 (0.5l)
annual plan-erattupetta muncipality project no 129/26-27-thottunkal road handrail construction ward 24 (0.5l)
corrigendum : construction of sarkhej-dholera semi high-speed double railway line, including spur lines to lothal nmhc and dholera airport terminal; comprising civil works, which includes formation & viaduct, bridges, station buildings, & associated works; track system (ballasted & blt), overhead traction system including electrical general services; signalling & telecommunication system, operating control centre, integration of all systems complete in all respect including testing & commissioning and all appurtenant works under jurisdiction of western railway
corrigendum : request for qualification cum request for proposal for development of the second container terminal at kamarajar port limited under ppp mode on design, build, finance, operate and transfer (dbfot) basis 20th august
engineering procurement and construction (epc) of construction of viaducts, ror/rfo, major bridges, minor bridges, animal underpass, rub/lhs, tunnel/cut- cover, earthwork, blanketing, trolley refuge, turfing, buildings, retaining wall, toe wall etc. and other associated worksfor construction of new double line track for dfcc loading from ch.158.00 to ch.184 in koderma detour section in sonnagar- andal 3rd and 4th line project on epc mode in dhanbad division of east central railway.
construction of new bg double line from balodabazar (km 110.500) to parmalkasa (km 280.840) and y-connectivities from lakholi station and marauda y cabin including earthwork, bridges, rail over rail (ror) bridge , road over bridge (rob), road under bridge (rub), station buildings, track works, electrification, signaling &telecommunication works, and allied miscellaneous works in connection with kharsia- naya raipur-parmalkasa 5th & 6th line project under south east central railway in the state of chhattisgarh.
engineering, procurement and construction (epc) agreement for construction of 3rd and 4th railway line adjacent to the existing broad gauge (bg) electrified double line including civil engineering works, track works, signalling & telecommunication works, over head electrification, electrical general services & all other allied works between delhi subjimandi (szm) to ambala cantt (umb) in delhi & ambala divisions of northern railway
construction of new bg double line from kharsia (km 0.00) to balodabazar (km 110.500) and y-connectivity from jharadih including earthwork in formation, bridges, ror (rail over rail), rob (road over bridge), rub (road under bridge), service buildings, staff quarters, p-way works (including supply of ballast, p-way material exept rail), electrification (2x25 kv ohe, psi, plc & electrical general work), and signalling & telecommunication works, along with allied and associated miscellaneous works in connection with kharsia- parmalkasa 5th & 6th new bg line project under south east central railway in the state of chhattisgarh.
1) new broad gauge single line of railway project comprising the section commencing from paradol takeoff point (km 947.257) to nagpur road station (connecting pointkm: 964.820) and slewing of existing boridand-chirmiri line from km:946.640 to km: 947.257 in the state of chhattisgarh in the south east central railway zone in epc mode., 2) construction of new bg double line from kharsia (km 0.00) to balodabazar (km 110.500) and yconnectivity from jharadih including earthwork in formation, bridges, ror (rail over rail), rob (road over bridge), rub (road under bridge), service buildings, staff quarters p-way works (including supply of ballast, p-way material exept rail), electrification (2x25 kv ohe, psi, plc & electrical general work), and signalling & telecommunication works, along with allied and associated miscellaneous works in connection with kharsia-parmalkasa 5th & 6th new bg line project under south east central railway in the state of chhattisgarh.
composite work (civil, electrical & s&t) comprising formation, viaducts, minor/major bridges, rubs/subways, station buildings, staff quarters, platforms, passenger amenities, supply & spreading of ballast, track linking and p-way works, along with design, supply, erection, testing & commissioning of 25 kv ac ohe and supply, installation, testing & commissioning of telecom outdoor systems including trenching, laying, blowing, splicing & jointing of 48f x 2 ofc on both sides of the track, one-side quad cable, emergency communication system and other associated works between tanda road (excluding) to jamaniya (including) from km 101.29 to km 125.92 (length: 24.63 km) in connection with the chhotaudepur-dhar new broad gauge line project in vadodara division of western railway.
corrigendum : jeypore-malkangiri new bg railway line: design & construction of new bg railway line from km 41.50 to km 69.60 (including nunkhari station) involving earthwork in formation, embankment/cutting, blanketing, side drains, catch water drains, minor bridges, major bridge, road under bridge (rubs), viaducts, tunnels, protection works, blt works, p.way track works with contractor's own materials (except new/sh rails), construction of platforms, station buildings, service buildings, sp/ssp buildings and residential buildings, water supply, indoor and outdoor electrification, provision of 1x25 kv conventional type ohe, tunnel ohe with rocs, tunnel lighting, tss, sp, general power supply arrangements modifications/conversion to underground for overhead electrical ht/lt power line crossings etc on epc basis in waltair division of east coast railway.
composite work (civil, electrical & s&t) comprising formation, viaducts, minor/major bridges, rubs/subways, station buildings, staff quarters, platforms, passenger amenities, supply & spreading of ballast, track linking and p-way works, along with design, supply, erection, testing & commissioning of 25 kv ac ohe and supply, installation, testing & commissioning of telecom outdoor systems including trenching, laying, blowing, splicing & jointing of 48f x 2 ofc on both sides of the track, one-side quad cable, emergency communication system and other associated works between jamaniya (excluding) to tirla (excluding) from km 125.92 to km 147 (21.08 km) in connection with the chhotaudepur-dhar new broad gauge line project in vadodara division of western railway.
corrigendum : engineering, procurement and construction (epc) agreement with schedule g-1 for third line track between manikpur (excluding) to iradatganj (including) (ch: 1257.180 to 1340.820) including electrification & signaling works along with construction of rob on lc no. 404/c2, 406/2t, 407/2e & 418c/2e and rub in lc no 426 in connection with manikpur-iradatganj 3rd line project of north central railway
engineering, procurement and construction (epc) contract for quadrupling (laying of new 3rd & 4th lines) of tracks between sulehali west and kurugunta (kqt) stations including electricfication and signalling &telecommunication works in connection with wadi-secunderabad quadrupling project in the state of karnataka.
construction of new railway bg line in km 28/970 to 42/040 in between kulthana including and rajpura stations including earthwork, minor bridges (03 nos) and major bridges (07 nos), station buildings, tunnels (7 nos) and mega bridge ( 03 nos) in connection with ratlam mhow khandwa gauge conversion in the state of madhya pradesh
pre-bid assistance for preparation of priced boq for the tender- construction of new railway bg line in km 28.970 to 42.040 in between kulthana station (including) and rajpura station (including) earthwork, minor bridges (03 nos) and major bridges (07 nos), station buildings, tunnels (7 nos) and mega bridge (03 nos) including electrification in connection with ratlam mhow khandwa gauge conversion in the state of madhya pradesh
corrigendum : jeypore-malkangiri new bg railway line: design & construction of new bg railway line from km 69.60 to km 125.18 involving earthwork in formation , embankment/cutting, blanketing, side drains, catch water drains, minor bridges, major bridge, road under bridge (rubs), road over bridge (rob's), protection works, p.way track works with contractor's own materials(except new/sh rails) construction of platforms, station buildings, service buildings, sp/ssp buildings and residential buildings, water supply, indoor and outdoor electrification, provision of 1x25 kv conventional type ohe, provision of 2 nos. tss, 1 no sp, construction of new sub-stations, electrification of station building, circulating areas, fobs, pfs, quarters, goomties, modification/conversion to underground for overhaed electrical ht/lt power line crossings etc. on epc basis in rayagada division of east coast railway.
south central railway (construction organization) : engineering, procurement and construction (epc) contract agreement for "construction of new bg railway line between chainage 114.400 km and chainage 146.180 km (i.e., 31.78 km) between pro. sircilla (excl.) - pro. vemulawada (incl.) - pro. kothapalli (excl.) stations of manoharabad - kothapalli section of hyderabad division, in the state of telangana"
construction of new double line between new palghar & vadhavan port (varor station) including electrification works in mumbai division of western railway
corrigendum : gunupur-theruvali new bg line project : design and construction of new bg railway line from km 122.750 to km 141.940 (excluding rcc box, rob br. no 388 from km 137.725 to 137.925 but including p way & ohe works) involving 08 nos of tunnels (t-2 to t-9) & from km 110.02 to km 113.12 involving 1 no tunnel(t-1), blt works & its approaches and earthwork in formation in embankment/cutting, blanketing, side drains, catch water drains, minor bridges, major bridge, road over bridge (robs), road under bridge (rubs), protection works, p.way track works with contractor's own material supplies including supply of track ballast, new wide based psc sleeper, special psc sleepers (for turnouts, improvised sejs, guard rails etc), point (thick web switches & wcms crossing, glued joints, h- beam/ composite sleepers over girder bridges, improvised sejs, all p-way fittings, ohe foundations, supply and erection of ohe masts, provision of 1x25 kv conventional type ohe (ohe-22.660tkm) including 2.86 km rocs in tunnel, provision of one feeding post (tss) modifications/conversion to underground for overhead electrical ht/lt power line crossings, construction of platforms, station buildings, fob, service buildings, sp/ssp buildings and residential buildings, water supply, indoor and outdoor electrification works etc in waltair division of east coast railway.
engineering, procurement and construction (epc) tender for"construction of doubling work including earth work, blanketing, minor bridges, major bridges, utility shifting, station & other buildings, platform work, circulating area, lc work and other miscellaneous works for 25t indian railway standard loading from raxaul (excl.) to narkatiaganj (excl.) (i.e. ch.189.400 to 227.200) (total- 37.80 km) in connection with doubling of raxaul - narkatiaganj section in samastipur division of east central railway"
construction of 3rd line work including earthwork, blanketing, minor bridges, major bridges, lc work and other miscellaneous works for 25.0t and dfc feeder route of indian railway standard loading, execution of indoor & outdoor s&t works, execution of general electrical works, installation and commissioning of 2x25 kv overhead equipment (ohe) for traction and power supply in connection with the 3rd line work of chandil- madhukunda section in adra division of south eastern railway on engineering, procurement & construction (epc) mode.
new broad gauge single line of railway project comprising the section commencing from paradol takeoff point (km 947.257) to nagpur road station ( connecting point-km:964.820) and slewing of existing boridand-chirmiri line from km:946.640 to km: 947.257 in the state of chhattisgarh in the south east central railway zone in epc mode.
engineering procurement and construction (epc) for "construction of doubling work including earthwork, blanketing, minor bridges, major bridges, lhs/rubs, track works, platform work, station building, fobs, other buildings, associated s&t and electrical utility shifting works and associated miscellaneous works for 25t indian railway standard loading from karnauti station(including-ch. 2.844 km) to bihar sharif station(excluding-ch 29.350 km), from ch. 1.900 km to 28.192 km (total- 26.292 km) in connection with the doubling of the bakhtiyarpur-rajgir - tilaiya section"
jeypore - nabarangpur new bg railway line project: design & construction of new bg railway line between ambaguda(excluding) (13.60 km) to nabarangpur(including) (43.996km) involving earthwork in formation in embankment/cutting, blanketing, side drains, catch water drains, minor bridges, major bridges(excluding bridge no. 85 at km. 37.080 i.e. indravati bridge), road over bridges (robs), road under bridges (rubs), protection works, p.way track works with contractor's own material supplies including supply of track ballast, new wide based psc sleepers, special psc sleepers (for turnouts, improvised sejs, guard rails etc), points (thick web switches) & wcms crossings, glued joints, h-beam/composite sleepers over girder bridges, improvised sejs, all p-way fittings, 2x25 kv ac ohe works, 2x25 kv tss with sp/ssp works along with scada, modification/conversion to underground for overhead electrical ht/lt power line crossings, electrical general services, construction of platforms, station buildings, service buildings, sp/ssp buildings, trd depot building with tower wagon shed, residential buildings, water supply, indoor and outdoor electrification etc. on epc basis in rgda division of east coast railway"
mahagama - pirpainti new rail line: execution of civil, p-way, electrification, signal and telecom works for construction of new rail line between mahagama station (excluding) and pirpainti station (excluding) from km 60.000 to km 92.100 in connection with pirpainti-jasidih new bg rail line project of eastern railway.
providing project general management services for various constructionsites/sections for new line, doubling, bypass line, rob/rubs projectsbeing executed by construction organization in the jurisdiction of northwestern railway.
engineering procurement and construction (epc) contract for construction of new railway line from rowghat - jagdalpur(140kms) package- i from ch 12+700 to 42+600 from kurkanar to bhanpuri excluding kurkanar station and including bhanpuri station in connection of dallirajhara - rowghat - jagdalpur new railway line in the state of chhattisgarh.
corrigendum : chandanpur- shaktigarh 4th line: execution of civil, p-way, electrification, signal and telecom works for construction of 4th rail line between chandanpur station (incl.) and pallahroad (incl.) from km 40.220 to km 78.120 in connection with chandanpur- shaktigarh 4th line rail project of eastern railway
corrigendum : execution of earthwork in formation, minor bridges, major bridges, station buildings, service buildings, p-way linking work, ballast supply, platform work , pf shelter, drain work, camping facilities, protection works, tunnel between ch: 116.205 km to ch: 116.415 km, and other allied works between barkote(ex) (ch: 98.325 km) - mahuldiha(ex) (ch: 117.525 km) including ambagaon yard in connection with talcher - bimalagarh new bg rail link project.
request for proposal (rfp) for providing project general management services for new line, multitracking, gauge conversion, electrification and other important works etc. in construction organization under cao/c/adi of western railway for a period of 60 months.
provision of infrastructure development works (earthwork in embankment, bridge extension, retaining wall cum boundary wall, road works, etc.) in connection with development of land for proposed poh cum new emu maintenance depot with emu stabling sidings at vangaon (km 112/1 to km 115/1, west side of existing railway tracks between vangaon & dahanu road stations) under mutp iii & mutp iiia.
engineering, procurement and construction (epc) for "signalling & telecom works in connection with the 3rd and 4th line between chirailapothu to paharpur and koderma to pradhankhunta (exclusive) (total- 242 km approx) of east central railway
earthwork in formation, construction of major & minor bridges, retaining wall, drains, supply of ballast, p. way materials & track linking works, construction of building and allied works from ch 9/190 km (take-off) to ch 15/342 km (de) in connection with proposed siding for the work of rail connectivity for proposed phase-ii silo (02 nos. -20mty) at lakhanpur area of mcl at jharsuguda, odisha. pkg-ii
mcl lakhanpur phase ii - earthwork in formation, construction of major minor bridges, retaining wall, drains, supply of ballast, p. way materials track linking works, construction of building and allied works from ch 9/190 km takeoff to ch 15/342 km de in connection
corrigendum : "execution of third line bg track between ranaghat jn. (excl.) and krishnanagar jn. (excl.) from km 75.210 (from sealdah) to km 97.585 (from sealdah) including electrification & signalling works" on epc mode.
corrigendum : south central railway (construction organization)- engineering, procurement and construction (epc) contract for doubling of track between bommaipalli station & valigonda station including electrification & signaling works in connection with doubling of guntur-bibinagar section and provision of auto fault locator at tss/sp/ssps between kukkadam-valigonda section in the state of telangana.
engineering, procurement and construction (epc) agreement for construction of new bg rail line including earth work, blanketing, minor bridges, major bridges, track works, station building, buildings and other miscellaneous works for 25t indian railway standard loading from sitamarhi (excluding) to rewasi (including) (i.e.ch. 0.700 to 12.400) (total length = 11.70km) in connection with sitamarhi-sheohar new bg rail line project in east central railway in the state of bihar
south coast railway (scor) (construction organization) - engineering, procurement and construction (epc) contract for proposed double lines with rail over rail (ror) between new erragudi & existing gooty fort stations, excl. gooty yard, from km.0 to km.7.70 and from km.9.40 to km.12.00 (length - 10.30 km), in guntakal division of south coast railway (scor) in the state of andhra pradesh.
rate contract for e-check of cil make engine kta 50l of 1400 hp demu
construction of doubling of track work including earthwork, blanketing, minor bridges, lc work and other miscellaneous works for 25t indian railway standard loading, execution of indoor & outdoor s&t works, execution of general electrical works, installation and commissioning of 2x25 kv overhead equipment (ohe) for traction and power supply in connection with the adra-sanka-rukni doubling project of adra division, south eastern railway on engineering, procurement & construction (epc) mode.
palanpur- samakhiali- gandhidham section- elimination of level crossings no. 79, 90, 107, 108, 115, 116, 201, 212 & 220 by providing road under bridges between under jurisdiction of sr.den (nw)-adi. (09 nos.)
corrigendum : execution of ballast less track works from shivalingapuram station km. 45.483 to borraguhalu station km. 72.550 in connection with kottavalasa koraput doubling project of rayagada division, east coast railway on epc mode
through sleeper renewal (p) by agency's track laying (pqrs/sqrs/qrs/tle) portal and material (except rail) complete at purulia jn. - chandil jn. - tsr(p) (dn)- 20.281 tkm., purulia jn. - chandil jn. - tsr(p) ( up) - 16.289 tkm, kharagpur - bhadrak (up & dn) - tsr(p) - 49.619 tkm, (kgp & adra division) total tsr(p) =86.189 tkm. in ser
doubling of track between turavur - mararikulam (tuvr - makm) section:- proposed earth work in formation, modification of lcs, provision of s&t accommodation and gate lodges, provision of cable ducts , side drains, retaining walls, construction of platforms, construction of fobs, protective works, proposed extension of minor bridges, between turavur (excluding) and cherthala (excluding) stations (km 24/000- km 32/100) (tuvr-srtl reach)
doubling of track between turavur - mararikulam (tuvr - makm) section:- proposed earth work in formation, modification of lcs, provision of s&t accommodation and gate lodges, provision of cable ducts, side drains, retaining walls, construction of platforms, construction of fobs, provision of platform shelters, protective works, proposed extension of minor bridges along with p.way works at cherthala yard (km 32/100-km 34/300) (length = 2200 m) and mararikulam yard (km 43/300-km 45/100) (length = 1800 m)
corrigendum : design, supply, installation, testing and commissioning of interoperable signalling system for lajpat nagar - saket g-block corridor (line-11) of delhi metro phase-iv mrts.
corrigendum : development of rail connectivity to mmlp bengaluru from dodbele railway station
comprehensive annual maintenance contract for axle mounted disc brake system of lhb coaches ( ftrtil make).
s&t works comprising trenching, laying of cables, construction of foundations, erection of location boxes, signals and other outdoor equipment, associated wiring in connection with the yard remodeling of 05 stations (talodhi, rajoli, mul-maroda, kelzar and chandafort), including design, supply, installation, testing and commissioning of new ei, msdac, ips, lc gate etc., subsequent modifications to ei systems and associated indoor and outdoor s&t works in station yards and block sections, and s&t works in facilitation of engineering works, in connection with the doubling work of the gondia-chandafort section.
corrigendum : provision of ballastless track in the main line in the various stations of kharagpur division and ranchi division.
doubling of track between alappuzha - ambalapuzha (allp - ampa) section: proposed earth work in formation, modification of lcs, provision of s&t accommodation and gate lodges, provision of cable ducts , side drains, retaining walls, construction of platforms, provision of platform shelters, protective works, proposed extension of minor bridges along with p way works at alappuzha yard (km 54/100-km 58/800).