FILTERS
re- tender long term output & performance based road assets maintenance contract oprmc phase - iii package no. 37a for the year 2026-27
View Insights
long term output & performance based road assets maintenance works under package 45b/ oprmc-iii/ road division no-1, gaya ji
long term output and performance based road assets maintenance contract (oprmc-iii) works under package- 26a/ oprmc-iii/ road division, sonepur
road works. construction, upgradation / strengthening and 5 years maintenance under speical assistance to states.
long term output & performance based road assets maintenance works under package 45c/ oprmc-iii/ road division no-1, gaya ji
construction of road.
maintenance of roads under long term output and performance based road assets maintenance contract (oprmc-iii).
corrigendum : public health circle rajamahendravaram - hybrid annuity model (ham) - execution of roads with drains, central medians, street lighting, parks and other development works in seven (7) urban local bodies of dr. b. r. ambedkar konaseema and eluru districts of ph circle rajamahendravaram - rjy package - iii
corrigendum : rehabilitation upgradation of four lane road with paved shoulders in hingoli town section of nh 461b from narsi phata to junction with nh 161 at sawarkheda with major bridge across kayadhu river and additional 2 lane rob at lc no.144(b) (from km. 94.
upgradation and reconstruction of khandwa-mundi road (sh-70) from km 00 to km 31.275 two lane with paved shoulder in the state of madhya pradesh on epc mode.
corrigendum : balance work for const of western side spur of rampur rudrapur sec connecting nh24 to nh 87 bypassing rampur town at risk and cost of contractor on epc mode in uttar pradesh - balance work for const of western side spur of rampur rudrapur sec connecting nh24 to nh 87 bypassing rampur town at risk and cost of contractor on epc mode in uttar pradesh.
corrigendum : strengthening and overlay on damaged sections of six lane ahmedabad to vadodara section of nh 48 (old nh-8) from km. 6.400 to km. 108.700 (length 102.300 km) in the state of gujarat at risk and cost of concessionaire on single percentage item rate ba
corrigendum : extension and upgradation of runway and allied works at daman
construction work on the missing link of the hamirpur-rath-garautha-gursarai-jhansi road (state highway no. 42) in jhansi and hamirpur districts, spanning chainage 74.550 to 110.360 (length: 35.810 km). (hindi document)
corrigendum : providing roads, central medians, street lighting, parks and other development works in 6 nos urban local bodies of ananthapuramu public health circle under hybrid annuity model in (ham) package-05
development of interchange at starting point of ahmedabad dholera expressway meeting with sardar patel ring road (sprr) in ahmedabad, gujarat
long term output & performance based road assets maintenance works under package 46b/ oprmc-iii/ road division no-1, jehanabad
rectification of 05 nos. morth-identified black spots on nh-130, including 02 nos. on bilaspur to pathrapali section from km 0.000 to km 53.300 and 03 nos. on simga to bilaspur section from km 48.580 to km 91.026
corrigendum : const. of grade separators at rabarika chowkdi kutiyana bypass near vill. mal choliyana n vup near kutiyana vill along with standalone service road 2.20 km on porbanadar jetpur sec of nh27 in gujarat
construction of a two-lane secondary service road along uer-ii within the available row in the state of delhi on epc mode.
corrigendum : rectification of curves in the existing emergency landing facility including construction of perimeter roads on both sides of the elf and atc plinth (50m 50m) on chilakaluripeta nellore sec from km 1274.000 to km 1277.600 of nh 16 in ap on epc
permanent rectification of 4 nos. of blackspots in trichy - dindigul section of nh-83 in the state of tamil nadu under epc mode - permanent rectification of 4 nos. of blackspots in trichy - dindigul section of nh-83 in the state of tamil nadu under epc mode
providing and exec of fmn, pmt and surf wks incl bituminous courses, modular imb fencing with solar lights, elevated sentry posts, ilcb and foot track bet bp-56 and bp-57, incl imb rd-03 and approach rd-02 under (p) sewak in chandel district, manipur
corrigendum : construction of proposed storm water drain and footpath of block 1b (package 8) at ujjain
corrigendum : construction of bypasses at sheikhpura and khaira along with 1 no. of realignment at sikandra to two lane with paved shoulders standard on n.h. 333a under epc mode in state of bihar (job no. nh-333a-2022-23-br-58).
corrigendum : 4-6 laning of kharar-ludhiana section of nh-95 (new nh-05) from km. 10.185 to km. 86.199 samrala chowk, ludhiana in the state of punjab on hybrid annuity mode (ham) - execution of pending overlay and maintenance works at risk and cost of the concessi
corrigendum : construction of new melling damteng road from km 0.000 to km 22.000 (design length 19.653) to nhsl (ps) specification in sector of 120 rcc/ 763 brtf/ project vartak
long term output & performance based road assets maintenance works under package 46a/ oprmc-iii/ road division no-1, jehanabad
road works - dinara (nh-30) to jalhara (sh-17) road, chausa gola-buxar road (sh-13) (km. 0.00 to 10.802), mohaniya (panjrao bridge)-chausa gola road (sh-14), parsathua bazar (nh-30) to mahavir sthan (sh-14) road via mukhraon, chausa-dhansoi road, chausa-chunni-pawani-kamarpur road (km. 0.00 to 4.365), chausa-chunni-pawani-kamarpur road (km. 4.365 to 10.69), parari-sonbarsha road (km. 0.00 to 4.00), parari-sonbarsha road (km. 4.00 to 7.00), ara-buxar road (km. 0.80 to 2.00), approach to chausa-karmnsha road, approach road to h.l. bridge at dewal ghat, sarenja (sh-17)-koransarai (nh-120) road, ara-buxar road (km. 0.00 to 0.80), ara-buxar road (km. 2.00 to 2.60), chausa gola-buxar road (sh-13) (km. 10.802 to 12.802), chausa gola-kochas road (upto basai bridge) (sh-17). (hindi document)
corrigendum : construction of bypass road to aska town on nh-157 in the state of odisha on epc mode
corrigendum : construction of proposed storm water drain and footpath of block 1a and 2 (package 7) at ujjain
corrigendum : construction of proposed storm water drain and footpath of block 3 and 4 (package 9) at ujjain
widening and upgradation to 2l ps with service road and 4l ps configuration of the lokhandi sawargaon to bardapur phata excluding grade separator km 35.600 to km 37.500 and toll plaza km 39.200 to km 39.300 from design km 32.225 to km 51.615 total le
corrigendum : constr of 05 caverns, each 63.5m in length, comprising 40m main cavern and 23.5m approach cavern with portal, including 4m x 7.5m niches/ living rooms on both sides of the approach cavern with the approach road connecting to existing rd at - general karzok under project himank in ladakh ut on epc mode
provision of goods platform with approach road & retaining wall at baghauli & bansi railway station, subways at baghauli, bakhira, mehdawal, kheshraha & bansi railway station, balance work of major bridges, construction of yard drains and station area drains at various stations in khalilabad-bansi in connection with khalilabad- bahraich new b.g. rail line project in lucknow division of n.e. railway.
corrigendum : construction of alirajpur bypass (2-lane with paved shoulder) from ch. 0.000 to ch. 11.792 in the state of madhya pradesh (total length-11.792 kms) under epc mode - construction of alirajpur bypass (2-lane with paved shoulder) from ch. 0.000 to ch. 11.792 in the state of madhya pradesh (total length-11.792 kms) under epc mode.
upgradation to four lane carriageway with paved shoulders of the nagaur city left out stretch in the state of rajasthan on epc mode
public health circle visakhapatnam providing of roads central medians street lighting parks and other development works in vizianagaram nellimarla narsipatnam and yelamanchili ulbs with vmrda funds
wbpwd/pw(r)/sepd/piu-i/nit-20 of 2026-2027_sl_1 - bishnupur - kotulpur rd from18.00kmp-36.00 km.widening(from carriageway7.00mto10.00 m)-strengthening work including construction of 20 nos. of cd structures, 890 m protective work- 1970 m drainage work under bishnupur div, pwd, district bankura.
corrigendum : treatment of 04 nos of landslide location at km. 100.125 to 100.570 barethi open tunnel km 102.960 to km 103.100 pokhu devta/matli km. 109.885 to km. 110.037 jaskot village and km 127.560 km 127.760 gojmer village on nh 34 on gangotri rishikesh se - treatment of 04 nos. of landslide location at km. 100.125 - 100.570 barethi open tunnel km. 102.960 km. 103.100 pokhu devta/matli, km. 109.885 km. 110.037 jaskot village and km 127.560 km 127.760 gojmer village on nh-34 on gangotri rishikesh s
repair and rehabilitation work of berhampore bypass from km 191.700 to km 202.500 on berhampore - farakka section of nh-12 at the risk and cost of the bot concessionaire
corrigendum : widening of existing 2 laning stretch road in available width for safety drainage segregation of traffic in phaltan city start ch. 138 250 at bypass start point to end ch. 144 425 and construction new rob at km 179 730 existing km 61 100 of nh 965
corrigendum : widening and strengthening of single and intermediate lane to 2 lane with paved shoulder from existing chainage (km 53.873 to km 59.700) design chainage (km 33.565 to km 38.943) (design length 5.378 km) on nh-507 in the state of uttarakhand
construction of 6 lane lvup & svup in village sahuwala (km. 271+890 & 272+093); lvup & svup in village odhan (km. 285+513 & 285+765); lvup in village chormar khera (km. 292+030); and lvup in village sawant khera (km. 306+317) with slip/service roads on both sides on hisar to dabwali section of nh-9 (old nh-10) in the state of haryana on epc mode.
widening & strengthening of ghaghra to jokari road via ranhe, kundo, rukighati (bishunpur) (total length-19.100 km) under road division.
construction of 6 lane vehicular underpasses at km 306.930 (tilhar bypass) and km 347.595 (ucholiya) for permanent rectification of morth identified blackspot on bareilly-sitapur section of nh-30 (old nh-24 in the state of uttar pradesh on epc mode.
construction of 4-lane rob (approaches excluding rly portion) in lieu of l-xing no - 96-a on ayodhaya - akbarpur section of lucknow division on northern railway.