FILTERS
corrigendum : develop of 6l access controlled greenfield highway starting from junction with nh60 at adgaon km. 138.00 to ahilyanagar km. 290.000 (ahilyanagar bypass pkg i) - section 1: development of 6-lane access controlled greenfield highway starting from junction with nh-60 at adgaon (km. 138.00) to ahilyanagar (km. 290.000) and section-2: operation, maintenance and tolling of existing highways from nashik (km. 205.310) to sinnar (km. 180.00) of nh-60; sinnar (km. 180.000) to nandur shingote (km. 162.900) of nh-60; nandur shingote (km. 0.00) to kolhar (km. 47.37) of nh160d; kolhar (82.800) to start of ahilyanagar bypass (km. 126.564) of nh-160 in the state of maharashtra on bot (toll) mode.
View Insights
public health and municipalengineering department-urban infrastructure-proiding of roads.central medians.street lighting.parks and other developmental works in various urban local bodies under public health circles of andhra pradesh state under hybrid annuity model(ham)
corrigendum : public health rajamahendravaram circle - hybrid annuity model (ham) - execution of roads with drains, central medians, street lighting, parks and other development works in 4 urban local bodies of ph rajamahendravaram circle - rjy package -ii covering urban local bodies of east godavari district
public health circle, nellore - urban infrastructure - providing of roads, central medians, street lighting, parks, construction of integrated market complex and other development works in 6 nos urban local bodies of nellore public health circle under hybrid annuity model (ham) in package - 2
public health circle, nellore - urban infrastructure - providing of roads, central medians, street lighting, parks and other development works in 11 nos urban local bodies of nellore public health circle under hybrid annuity model (ham) in package - 3
public health quality control circle, guntur - urban infrastructure - package -3 - execution of roads, central medians, street lighting, parks and other development works in 3 ulbs of guntur district under hybrid annuity model
providing roads, central medians, street lighting, parks and other development works in 9 nos urban local bodies of ananthapuramu public health circle under hybrid annuity model (ham) in package - 01
providing roads, central medians, street lighting, parks and other developmental works in 9 nos urban local bodies of nellore public health circle under hybrid annuity model (ham) in package - i
public health quality control circle, guntur - urban infrastructure - package - 1 - execution of roads, central medians, street lighting, parks, office buildings and other development works in 5 ulbs of krishna district and 3 ulbs of bapatla district under hybrid annuity model (ham)
corrigendum : providing roads, central medians, street lighting, parks and other developmental works in 4 nos urban local bodies of ananthapuramu public health circle under hybrid annuity model (ham) in package-04
public health quality control circle, guntur - urban infrastructure - package -4 execution of roads, central medians, street lighting, parks and other development works in 8 ulbs of palnadu district under hybrid annuity model
providing roads, central medians, street lighting , parks and other developmental works in 9 nos urban local bodies of ananthapuramu public health circle under hybrid annuity model (ham) in package-02
corrigendum : public health circle rajamahendravaram - hybrid annuity model (ham) - execution of roads with drains, central medians, street lighting, parks and other development works in six (6) urban local bodies of west godavari district in ph circle rajamahendravaram - rjy (package - iv)
public health quality control circle, guntur - urban infrastructure - package - 1 - execution of roads, central medians, street lighting, parks, office buildings and other development works in 5 ulbs of ntr district under hybrid annuity model (ham)
corrigendum : public health circle rajamahendravaram - hybrid annuity model (ham) - execution of roads with drains, central medians, street lighting, parks and other developmental works in urban local bodies of ph circle rajamahendravaram - rjy (package-i) covering ulb's of kakinda district.
providing roads, central medians, street lighting, parks and other development works in 9 nos urban local bodies of visakhapatnam public health circle under hybrid annuity model (ham) in package - 01
corrigendum : providing roads, central medians, street lighting, parks and other developmental works in 6 nos urban local bodies of ananthapuramu public health circle under hybrid annuity model (ham) in package-03
corrigendum : public health circle rajamahendravaram - hybrid annuity model (ham) - execution of roads with drains, central medians, street lighting, parks and other development works in seven (7) urban local bodies of dr. b. r. ambedkar konaseema and eluru districts of ph circle rajamahendravaram - rjy package - iii
corrigendum : providing roads, central medians, street lighting, parks and other development works in 6 nos urban local bodies of ananthapuramu public health circle under hybrid annuity model in (ham) package-05
public health circle visakhapatnam providing of roads central medians street lighting parks and other development works in vizianagaram nellimarla narsipatnam and yelamanchili ulbs with vmrda funds
construction of model bus station at kuppam, chittoor district (including civil works, yard work, water supply & sanitary arrangements, electrification, firefighting system, havc works, cctv and pa system, stp works and land scrapping works) (payment mode through nidhi portal govt. of ap)
corrigendum : (3rd call) godavari pushkaralu 2027 tier-1 irrigation department works at various pushkar ghats for construction of 1)asta tirthams(pakshi tirtham vyasa tirtham sangama tirtham chitsuka tirtham extension of brahma tirtham with bharathi platforms narasimha tirtham hanuma tirtha subramanya ghat and gravel road from pakshi tirtham to sironcha bridge) 2)mandapas(temples mandapas aparkarma bhavan pinda pradana mandapam toilet block) and 3) asta tirtham services (internal electrical works internal water supply and plumbing works electrical works site landscape works and site amenities at kaleshwaram(v). mahadevpur(m) jayashankar bhupalpally(d)
construction of boundary wall and beautification of dry munak canal from downstream of outer ring road to inderlok metro station for the year 2025-26
recarpeting and beautification of 60.00 m.t. wide surat-kamrej d.p.road(valak patiya juction to kamrej chowkdi) fallin in new east (sarthana)zone area by contractor's own batch mix plant and wmm plant to be installed within surat city limit with sensor operator paver finisher including construction/repair of footpath, divider, water table and providing & laying /fixing of pavement markings ,road studs, road signages and with other traffic safety measures.(2026-2027) (w-1)
beautification work of the maa kalikhoh temple only, under phase/component "b-2" of the project involving the development of the trikon parikrama path in mirzapur district and the beautification of maa vindhyavasini temple, maa ashtabhuja temple, and maa kalikhoh temple in a manner befitting their spiritual significance. construction of two units of residential/non-residential buildings at the lodhi fire station in sonbhadra district.
corrigendum : construction of multi-storey-flatted industrial park at govindpura industries (with future expansion) at district bhopal
corrigendum : operation and maintenance of 6-lane badarpur elevated highway (including service roads ramps approaches pups and parks) on delhi-agra section on nh-2 from km. 16.100 to km. 20.500 in delhi and haryana on item rate (percentage) basis.
1. beautification of parks in sector-2 as part of the canal front beautification project for the greater bareilly residential scheme. 2. beautification of parks in sector-1 as part of the canal front beautification project for the greater bareilly residential scheme. 3. construction of a shopping/commercial complex (block-a) in sector-07 of the greater bareilly residential scheme. 4. construction of a shopping/commercial complex (block-b) in sector-07 of the greater bareilly residential scheme. 5. canal front development work on both sides of the canal passing between sectors 1 and 2 of the greater bareilly residential scheme. 6. construction of sewer lines, water lines, rcc drains, electric trenches, park boundary walls, and roads. 7. construction of the 'vishwanath dwar' (gateway) at the entry point to bareilly city on pilibhit road (bada bypass). 8. construction of the 'somnath dwar' (gateway) at the entry point to bareilly city on nainital road (bilwa). 9. maintenance work involving sewer and drain cleaning, verge cleaning, and repairs to drains and sewers in the ramganga nagar residential scheme. 10. installation and fixing of demarcation pillars for the pilibhit residential scheme, bareilly. (hindi document)
beautification works of parks in sector-2 under canal front beautification of greater bareilly awasiy yojana.
internal development works in sector-07 of greater bareilly residential scheme, including sewer line, water line, rcc drain, electrical trench, park, boundary wall, and road construction.
1. construction of knowledge center at t.p. scheme no. 04, seedar, f.p. no. 48 in kaliyabid-seedar-awadiya ward in bhavnagar city., 2. construction of a building for traffic in t.p. scheme no. 2, awadiya (first), f.p. no. 48/3 in awadiya-sakkar-awadiya ward in bhavnagar city., 3. construction of r.c.c. road and compound wall in savaripura ward, ghorad smshan., 4. construction of a park in bhavnagar city, nagzadi, t.p. scheme no. 3, f.p. no. 103, airport road., 5. work of laying 800 mm diameter di pipeline in hillpark area of seedar. ( gujarati image)
dnit for development, opera... - development of adventure tourism hub at tikkar taal and adventure park.
corrigendum : road widening and beautification works from jaisingpura turn (bhagat singh marg) to narsingh ghat bridge
(rfp) for design, engineering, development of waste to wonder park (adbhut bharat park) on revenue share model for 20 years at d park, greater noida
beautification work of parks in sector-1 under canal front beautification of greater bareilly residential scheme.
development of green space between two canals and over covered canal at town dhuri
development and beautification of buffer zone from visat circle to tapovan circle includes landscaping, sculptures, fountains, kiosks, topiaries etc for 15-year operation & maintenance period under publicprivate partnership (ppp) mode in ahmedabad municipal corporation (3rd attempt)
construction of cement concrete road, internal drainage line, beautification work, compound wall, community hall in various places of tisgaon sajapur, vadgaon kolhati, abdimandi, daultabad, sharnapur, ikarodi and other villages in tq. chhatrapati sam
1. internal development works in sector-8 of the greater bareilly residential scheme, comprising sewer lines, water lines, rcc drains, parks, boundary walls, and road construction. 2. development works for sector-5 (specifically the public utility area situated between the 12.00m and 18.00m service roads) and the remaining areas of the greater bareilly residential scheme. 3. internal development works in sector-10 of the greater bareilly residential scheme, comprising sewer lines, water lines, boundary walls, rcc drains, parks, gates, and road construction (lig part). 4. internal development works in sector-10 of the scheme, comprising sewer lines, water lines, boundary walls, roads, parking areas, and earth-filling work (ews part). 5. provision of furniture for the library in sector-8 of the ramganga nagar residential scheme, as part of social and cultural amenities. 6. remaining works for the library in sector-8 of the ramganga nagar residential scheme, as part of social and cultural amenities. 7. installation of floodlights on the gateways constructed on the main roads of bareilly city (shahjahanpur road and badaun road). 8. tree plantation work at the natraj rotary and bca office rotary, located on the divider of the 45.00m wide main road stretching from natraj chowk to gau raksha chowk in greater bareilly. 9. external electrification work using underground cabling in sector-2 of the greater bareilly residential scheme. 10. construction of 11 kv underground power feeders to supply electricity to various sectors of the scheme from the 33/11 kv electrical substation currently under construction in sector-7 of the greater bareilly residential scheme. 11. external electrification work using underground cabling in sector-1 of the greater bareilly residential scheme. 12. electrification work using underground cabling in sector-04 of the greater bareilly residential scheme. 13. electrification work using underground cabling in sector-03 of the greater bareilly residential scheme. 14. road widening from barrier 20-2 to the 'bada bypass' on the pilibhit bypass road; installation of lighting on the proposed divider; and 5 years of operation and maintenance. (hindi document)
construction work related to green areas, landscaping, sports areas, and signage at s.n. medical college, district agra
development and beautification of machail mata temple paddar district kishtwar - please refer to nit/sbd
supplying of best quality & well growth various variety with separate colour seasonal plants with bags, exotic plants with pots & various cavity tray for flower show-2027. 2) supplying of best quality carpet lawn, artificial 40 mm carpet lawn, different artificial colouring flowers & artificial camel carpet for flower show-2027. 3) supply of green moss, compressed low e.c.cocopit for flower show-2027. 4) rate contract for gardening work of 8 hrs. shift for preparation of display in flower show-2027. 5) supplying good earth like fertile soil, river kamp & others for preparing display area in flower show-2027.
6 laning panipat jalandhar nh-44 from km272 (khanna) to 352.730 (phagwara) in punjab state - horticulture, beautification and maintenance works of median and secondary median (separator) incl. gap plantation, kaner replacement - 6 laning panipat jalandhar nh-44 from km272 (khanna) to 352.730 (phagwara) in punjab state horticulture, beautification and maintenance works of median and secondary median (separator) incl. gap plantation, kaner replacement
corrigendum : development and beautification of ambedkar chowrasta (kodangal junction) at kodangal town in vikarabad district
construction of multipurpose community hall including development of park at trt nagrota jammu
kmc/ws/mgps/jora(2nd call)/01/2026-27 - operation and maintenance of modern water treatment plant of 8.0 mgd capacity with 3.5 mg capacity semi underground rcc reservoir and booster pumping station within jorabagan park at north kolkata.
proposed work for construction of children traffic park in akwada(draft) tps no.29 fp no.59/4/3 for bhavnagar municipal corporation, bhavnagar.
beautification, landscaping, architectural enhancement and development of jalukbari junction, guwahati
corrigendum : avenue plantation or replacement of dead avenue plants work at risk and cost of epc contractor, along amritsar to jamnagar section of 6l of (rasisar) to (deogarh) (near dhadhaniya) of pkg 5 section on nh 754k in the state of rajasthan
design, engineering, development of children traffic park under chief minister global nagarodaya yojana on jd(u) on license fee model for 5 years at meerut