FILTERS
corrigendum : nhidcl/assam/record of discussion/2025 - construction of 4 lane twin tube road cum rail underwater tunnel under river brahmaputra, including 4 lane approaches along with provision of railway infrastructure in one of the tubes, in the state of assam on epc mode
View Insights
corrigendum : construction of 6l access controlled greenfield highway from ahilyanagar km 290.000 to hasapur km 512.000 (ahilyanagar bypass pkg 2) - construction of 6-lane access controlled greenfield highway from ahilyanagar (km 290.000) to hasapur (km 512.000) and section-2: operation & maintenance of existing highways from start of ahilyanagar bypass (km 0.000) to walunj junction (km 29.280) of nh160 & nh-61; walunj junction (km 9.980) to chapadgaon (km 80.390) of nh-561a; chapadgaon (karmala) (km 80.390) to tembhurni (km 139.700) of nh-561a; tembhurni (km 150.050) to solapur (km 251.325) of nh-65; and solapur (km 99.400) to akkalkot (km 138.352) of nh-150e in the state of maharashtra on bot (toll) mode.
corrigendum : construction of 4 lane thiruvananthapuram outer ring road (orr) from navaikulam (ch. 0.000) to vizhinjam (ch. 62.700) section of nh 866 design length 62.7 km in kerala on bot mode
nhidcl/assam/2025 /baihatachariali to missionchariali /260456 - construction of 4 lane highway from baihata chariali (ch. 0.000), near guwahati to tezpur (ch. 150.971) excluding mangaldoi bypass (from ch. 28.500 to ch.42.590) along nh-15 in the state of assam on bot toll mode.
corrigendum : develop of 6l access controlled greenfield highway starting from junction with nh60 at adgaon km. 138.00 to ahilyanagar km. 290.000 (ahilyanagar bypass pkg i) - section 1: development of 6-lane access controlled greenfield highway starting from junction with nh-60 at adgaon (km. 138.00) to ahilyanagar (km. 290.000) and section-2: operation, maintenance and tolling of existing highways from nashik (km. 205.310) to sinnar (km. 180.00) of nh-60; sinnar (km. 180.000) to nandur shingote (km. 162.900) of nh-60; nandur shingote (km. 0.00) to kolhar (km. 47.37) of nh160d; kolhar (82.800) to start of ahilyanagar bypass (km. 126.564) of nh-160 in the state of maharashtra on bot (toll) mode.
corrigendum : cs for ie for the dev. of 4/6l of access controlled kanpur kabrai 0 (kanpur ring road) to design km117.700 in up (sec1)and overlay/strengthening other road safety and imp.works existing kanpur kabrai sec.7.430 to 130.100 (0 to 123.860)nh 34 in up - section-1: development of 4/6 lane of access controlled kanpur - kabrai greenfield highway, starting from design km 0+000 (kanpur ring road) to design km 117+700 (near village kabrai in district mahoba) in the state of uttar pradesh and section-2: overlay/strengthening, other road safety and improvement works on existing kanpur - kabrai section from km 7+430 to km 130+100 (design chainage 0+000 to 123+860) of nh-34 (old nh-86) in the state of uttar pradesh on dbfot pattern at bot (toll) mode under nh(o).
corrigendum : dev of 4/6l of ac kanpur kabrai gf highway start 0.000 (kanpur ring road) to 117.700 near kabrai sec1 and overlay/strengthen other road safety and improvement works on exist kanpur kabrai sec from 7.430 to 130.100 of nh34 in up sec2 on dbfot pattern
corrigendum : lot-1- construction of diversion tunnels, cofferdams, main dam including hm works of diversion tunnels, approach roads and bridges of kamala h.e. project (1720mw), kamle district, arunachal pradesh
corrigendum : nhidcl/meghalaya/ hsc/package-03/2026 - development, maintenance, management and operation of greenfield high-speed corridor from mawlyngkhung (near shillong) in meghalaya to panchgram (near silchar) in assam by 4-laning with paved shoulders on hybrid annuity basis. (package-3)
development of high speed access controlled greenfield highway from shamli-gorakhpur from ch. 662.400 to ch.745.594 in the state of uttar pradesh on ham mode (package-12) (design length 83.194 km)
develop. of high speed ac gf corridor from shamli gorakhpur from ch. 579.950 to ch.662.400 in the state of uttar pradesh on ham mode package-11 design length 82.450 km
corrigendum : devel. of 6l ac gf regional expressway on northern side of hyderabad from girmapur vill ch1.518 to pragnapur ch.82.000 for a design length of 83.518 km in telangana under nh o on hybrid annuity mode pkg i
engineering procurement and construction (epc) of construction of viaducts, ror/rfo, major bridges, minor bridges, animal underpass, rub/lhs, tunnel/cut- cover, earthwork, blanketing, trolley refuge, turfing, buildings, retaining wall, toe wall etc. and other associated worksfor construction of new double line track for dfcc loading from ch.158.00 to ch.184 in koderma detour section in sonnagar- andal 3rd and 4th line project on epc mode in dhanbad division of east central railway.
corrigendum : develop. of 6l ac gf regional expressway on northern side of hyderabad from pragnapur vill design ch82.000 to tangad palle vill design ch160.000 for a design l of 78.000 km in the state of telangana under nh(o) on ham pkgii.
corrigendum : cs for ie services for development of 4 lane badvel to nellore highway from badvel gopavaram village on nh nh-67 (ch.630.960) to guruvindapudi village on nh-16 (ch.739.094) in andhra pradesh on build-operate-transfer (toll) mode for a tl 108.134 km.
corrigendum : construction of six lane greenfield highway starting from its junction with nh4b (new nh348) near pagote (design km. 0.000) till its junction on nh48 at chowk (design km. 29.219) in maharashtra to be executed on bot (toll) mode under nh(o)
nhidcl/dpr/jk /c-k(tunnels)/2017 - construction of uni-directional singhpora - vailoo twin tube tunnel (under sinthan pass) and its approach roads on kishtwar - vailoo - khanabal section of nh-244 in the union territory of jammu and kashmir on epc mode
corrigendum : construction of 6 lane road tunnel for nh 148ae connecting dwarka expressway nh 248bb with nelson mandela marg vasant kunj in the state of delhi on ham mode
corrigendum : widening and upgradation of existing highway from khagaria (design ch. 270.000) to purnea (design ch. 413.529) section of nh 31 and nh 231 to 4 lane with paved shoulders under nh (o) on bot (toll) in the state of bihar.
development of high speed ac gf highway from shamli gorakhpur from ch.466.000 to ch.510.700 in the state of uttar pradesh on ham mode package9 design length 44.700 km
corrigendum : development of a link/connector corridor connecting the nh 31 and varanasi ring road along the river varuna for decongestion of varanasi city pkg 1 from km 0.000 to km 11.744 (tl 28.498 km including mcw/flyover/loop/ramp/link road) in up on ham.
nhidcl/jk/nh-244/ s-dtunnel/2020-21 - construction of uni-directional sudhmahadev -dranga twin tube tunnels and its approach roads on chenani - sudhmahadev - goha section of nh-244 in the union territory of jammu and kashmir on epc mode
corrigendum : 4-laning of muzaffarpur- sitamarhi- sonbarsa section of nh-22 (design ch. km. 0.000 to design ch. km. 82.551 total length 82.551 km) in the state of bihar on hybrid annuity mode (ham)
rehabilitation and upgradation of existing 4l highway to a 6l divided carriageway of orai barah section of nh27 from ex. km 1515.713 to km 1578.383 in the state of uttar pradesh on ham (total length 62.670 km).
corrigendum : construction of 6l gf ac indore eastern bypass starting from dc km 64.000 near pirkaradiya village and ending at dc km 113.000 on nh 347bg near village simrol/datoda pkg 1 of indore and dewas district in madhya pradesh on ham mode. l 49.00 km
corrigendum : 4l of jagtial karimnagar section of nh 563 from jagtial bypass start at design ch.0.000 existing chainage 90.500 on nh63 to design ch.58.866 km near sh-1 ch. 170.400 km at karimnagar bypass end dl 58.866 km in the state of telangana on dbfot mode
corrigendum : rfp for development of a link / connector corridor connecting the national highway31 (nh-31) & varanasi ring road, along the river varuna for decongestion of varanasi city package 2 from km 11+744 to km 19+420 (total length is 14.720 km including mcw/loop/ramp) in the state of uttar pradesh on hybrid annuity mode.
corrigendum : construction of 4lane gf amritsar-katra connectivity of amritsar with dak expressway from mdr junction at ch.40.900 dhunda village-junction nh3 and taran taran bypass near mannawalla village ch.70.950 (km 40.900-km 70.950 pkg-2) on epc mode in punjab.
rehabilitation and upgradation of existing 4l highway to a 6l divided carriageway of jhansi orai section (pkg-2) from design km 1423.000 sultanpura village to design km 1469.000 near ingui khurd village nh-27 in up on ham mode. (tl46.000 kms).
corrigendum : widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 0.000 to km 77.102 (chitrakoot majhgawan satna section) of nh 135bg (design length 77.102 km) under nh(o) in the state of uttar pradesh and madhya pradesh on ham on hybrid annuity mode.
corrigendum : construction of 4 lane bypass road to the existing nh 31 and nh 922 through bairiya ara section from km. 0.000 to km. 27.062 in the state of uttar pradesh and bihar on epc mode
balance work for construction of 8-lane access-controlled expressway from km 154.6 to km 190.0 of vadodara mumbai expressway (jujuwa to gandeva section) in gujarat on epc mode (pkg-viii)-02nd call
corrigendum : construction of 4 l of ujjain jhalawar sec of nh 552g from ch.0.000 village khilchipura to ch.86.500 village aakli kadiya (pkg 1) in the state of madhya pradesh on epc mode under nh(o).
rehabilitation and upgradation of existing 4l highway to a 6l divided carriageway of jhansi-orai sec. (pkg-1) from design km 1378.915 near jhansi (sijwaha tiraha nh27) to design 1423.000 near sultanpura village nh-27 in up on ham mode. (tl44.085 kms)
corrigendum : rfp for construction of 4/6 lane greenfield ludhiana rupnagar national highway no. nh-205k from junction with ne- village near to manewal (ludhiana) to junction with nh-205 near bheora village (rupnagar) including spur to kharar with ludhiana bypass under nh(o) in the state of punjab on hybrid annuity mode, package-2 (design ch. 37.700 to design ch. 66.440 and ludhiana bypass design ch. 0.000 to design ch. 18.500), total length 47.240 km.
corrigendum : cons of 6l gf ac indore eastern bypass from km 113.000 on nh 347bg near simrol/datoda end at km 139.630 nanded pkg2 of indore dist n rehab n upgrade of exist nh52 from km 18.000 khandwa to km 27.000 ahilyapur from 4to6l pkg2 of indore in mp on ham
corrigendum : bw for cons.of 4lane greenfield dake from jun. with jalandhar kapurthala road (nh703a) near khojewal village to junction with amritsar mehta sri hargobindpur tanda road (nh503a) (km 319.400 to 362.420) on epc mode under nh(o) in punjab (pkg-11)
corrigendum : construction of 4l of ujjain jhalawar sec of nh 552g from ch.86.500 aakli kadiya to ch.159.263 jhalawar (jn with nh52) pkg 2 in the state of madhya pradesh and rajasthan on epc mode under nh(o).
construction of radial road 2 from hyderabad outer ring road at kothwalguda (budwel) to nh 167n near nacharam package 1 budwel to shabad (km 0+00 to 29+50 km)
rehabilitation and upgradation of existing 4l highway to a 6l divided carriageway of jhansi orai section (pkg-3) from design km 1469.000 near ingui khurd village to design km 1515.710 near orai (bandha village) nh-27 in uttar pradesh on ham mode.
corrigendum : construction and upgradation of existing 2l.ps to 4l with paved shoulder configuration from km 0.000 (tansen chowk purani chhawani gwalior) to km 77.000 (near village prithvipur) of nh719 in madhya pradesh on hybrid annuity mode (package1).
corrigendum : development/upgradation of existing 4 lane to 6 lane of lucknow sitapur section km 412.745 to km 479.327 (length 66.582 km) of new nh30 in the state of uttar pradesh on bot (toll) mode
upgradation of existing two- lane with paved shoulders carriageway of nagaur-bikaner section of nh-62 from design km 161/000 to km 270/245 to four lane with paved shoulder in state of rajasthan on bot (toll) mode
public health and municipalengineering department-urban infrastructure-proiding of roads.central medians.street lighting.parks and other developmental works in various urban local bodies under public health circles of andhra pradesh state under hybrid annuity model(ham)
construction of radial road2 from orr at kothwalguda budwel to nh167n near nacharam package 3 gudur to nacharam ch km 56+50 to km 81+15
construction of radial road2 (rr 2) from orr at kothwalguda (budwel) to nh167n near nacharam package 2 shabad to gudur (km29+50 to km56+50)
corrigendum : balance work of six laning of kagal satara section of nh 48 (old nh 4) package i from km 592.500 to km 658.000 in the state of maharashtra to be executed on epc mode under bharatmala pariyojana
corrigendum : rehabilit shoulders from km 178.500 tation and up-gradation of nehru nagar to kothagudem section to two lane/four lane with pavedo km 230.580 of nh-930p in the state of telangana on epc basis
upgradation to four lane with paved shoulders of sadhuwali-banwala section from design km. 00.000 to km. 42.900 of nh-954 and banwala-hanumangarh section from design km 42.900 to km 68.140 of nh-54 in the state of rajasthan on hybrid annuity mode
corrigendum : rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh