FILTERS
corrigendum : development and maintenance of land to be created in offshore of vadhvan coast by dredging, reclamation and construction of offshore protection bund for vadhvan port on ppp to be executed on hybrid annuity mode
View Insights
corrigendum : construction of sarkhej-dholera semi high-speed double railway line, including spur lines to lothal nmhc and dholera airport terminal; comprising civil works, which includes formation & viaduct, bridges, station buildings, & associated works; track system (ballasted & blt), overhead traction system including electrical general services; signalling & telecommunication system, operating control centre, integration of all systems complete in all respect including testing & commissioning and all appurtenant works under jurisdiction of western railway
corrigendum : construction of breakwater, rock bund, wharf and capital dredging and reclamation for backup yard and allied onshore facilities including maintenance thereof on hybrid annuity model (ham) under development of outer harbour at v.o. chidambaranar port.
corrigendum : request for qualification cum request for proposal for development of the second container terminal at kamarajar port limited under ppp mode on design, build, finance, operate and transfer (dbfot) basis 20th august
construction of new bg double line from balodabazar (km 110.500) to parmalkasa (km 280.840) and y-connectivities from lakholi station and marauda y cabin including earthwork, bridges, rail over rail (ror) bridge , road over bridge (rob), road under bridge (rub), station buildings, track works, electrification, signaling &telecommunication works, and allied miscellaneous works in connection with kharsia- naya raipur-parmalkasa 5th & 6th line project under south east central railway in the state of chhattisgarh.
corrigendum : work of construction of intermediate cwph at kotra baseri laying of clear water transmission main from kotra to naroli nadbai via junction 2 at naroli ips nadbai nagar ramgarh kishangarhbas tijara jairoli and bhiwadi based on ham model under jjm
corrigendum : construction of civil works of barrage and stilling basin, u/s plastic cutoff trench, power intake structures, tunnel, outfall structure, associated hm works including adit plug, etc and associated works of link-3 project in himachal pradesh
composite work (civil, electrical & s&t) comprising formation, viaducts, minor/major bridges, rubs/subways, station buildings, staff quarters, platforms, passenger amenities, supply & spreading of ballast, track linking and p-way works, along with design, supply, erection, testing & commissioning of 25 kv ac ohe and supply, installation, testing & commissioning of telecom outdoor systems including trenching, laying, blowing, splicing & jointing of 48f x 2 ofc on both sides of the track, one-side quad cable, emergency communication system and other associated works between tanda road (excluding) to jamaniya (including) from km 101.29 to km 125.92 (length: 24.63 km) in connection with the chhotaudepur-dhar new broad gauge line project in vadodara division of western railway.
corrigendum : drinking wsp for 1473vill of chittorgarh pratapgarh rajsamand udaipur district from jakhamdam under jjm pkg2
corrigendum : construction of doubledecker structures for a length of 6.521 km excluding jp nagar 4th ph station from ch-0.330 km to ch.6.326 km and 4 nos of elevated double decker metro stations jp nagar 5th ph,jp nagar,kadirenahalli and kamakya jn. of bmrcl ph3.
corrigendum : part design and construction of elevated viaduct, at-grade viaduct, sidings, elevated ramps, entry/exit line to depot, and ten elevated station and one at grade station including civil works excluding architectural finishes and peb of mrts phase-iv.
composite work (civil, electrical & s&t) comprising formation, viaducts, minor/major bridges, rubs/subways, station buildings, staff quarters, platforms, passenger amenities, supply & spreading of ballast, track linking and p-way works, along with design, supply, erection, testing & commissioning of 25 kv ac ohe and supply, installation, testing & commissioning of telecom outdoor systems including trenching, laying, blowing, splicing & jointing of 48f x 2 ofc on both sides of the track, one-side quad cable, emergency communication system and other associated works between jamaniya (excluding) to tirla (excluding) from km 125.92 to km 147 (21.08 km) in connection with the chhotaudepur-dhar new broad gauge line project in vadodara division of western railway.
corrigendum : work for construction of intake well inside chambal river including approach bridge construction of rwr including all works required for inlet inside rwr outlet system from rwr to outlet chamber wtp cwr rwph and allied works package 1 under jjm
corrigendum : work of construction of cwr and block cwph at various locations for clusters laying of transfer main from block ps to block cps rising main from block cps to block esrs, construction of esrs laying of cluster distribution mains cabp pck 3 under jjm
public health and municipalengineering department-urban infrastructure-proiding of roads.central medians.street lighting.parks and other developmental works in various urban local bodies under public health circles of andhra pradesh state under hybrid annuity model(ham)
construction of gpra at amaravati, the new capital city of andhra pradesh. sh: planning, designing and construction of 1504 residential quarters comprising 600 type-ii quarters in 3 towers ( g plus 24 each), 600 type-iii quarters in 3 towers ( g plus 24 each), 228 type-iv quarters in 3 tower ( g plus 18 each), 56 type-v quarters in 1 tower ( g plus 13) and 20 type-vi quarters in 1 tower ( g plus 9), with a common double basement, ancillary building ( g plus 4), boundary wall, entrance gate complex, electrical substations, underground water sump with pump room, sewage treatment plant and all associated civil, electrical, mechanical, horticulture and development works and services, complete on engineering, procurement and construction (epc) mode-i. subwork/packages: package
corrigendum : jeypore-malkangiri new bg railway line: design & construction of new bg railway line from km 69.60 to km 125.18 involving earthwork in formation , embankment/cutting, blanketing, side drains, catch water drains, minor bridges, major bridge, road under bridge (rubs), road over bridge (rob's), protection works, p.way track works with contractor's own materials(except new/sh rails) construction of platforms, station buildings, service buildings, sp/ssp buildings and residential buildings, water supply, indoor and outdoor electrification, provision of 1x25 kv conventional type ohe, provision of 2 nos. tss, 1 no sp, construction of new sub-stations, electrification of station building, circulating areas, fobs, pfs, quarters, goomties, modification/conversion to underground for overhaed electrical ht/lt power line crossings etc. on epc basis in rayagada division of east coast railway.
corrigendum : rehabilit shoulders from km 178.500 tation and up-gradation of nehru nagar to kothagudem section to two lane/four lane with pavedo km 230.580 of nh-930p in the state of telangana on epc basis
development of satellite township phase-l, package 3 (group housing 02) including allied works at rakh gund aksha, bemina, srinagar (j and k) on design, engineering, procurement and construction (epc) basis with operation and maintenance of 2 years.
corrigendum : development of satellite township phase-l, package 3 (group housing 02) including allied works at rakh gund aksha, bemina, srinagar (j and k) on design, engineering, procurement and construction (epc) basis with operation and maintenance of 2 years
construction of 4.97 km elevated viaduct from koteshwar road dead end to start of ramp of underground section, including 4 nos. elevated stations viz. ashram road, koteshwar prachin mandir, sabarmati river, sardar nagar and design, construction and completion of 1.01 km of underground section comprising of twin cut & cover tunnel between ramp to dead end, including ramp and 01 no. underground metro station for ahmedabad metro rail project, phase-2a
development, operation & maintenance of berth no. 15 & 16 for handling multipurpose cargo (clean cargo) and containers at kandla on dbfot basis under ppp mode
corrigendum : development, operation and maintenance of the multi modal logistic hub project (imlh) at nangal choudhary (district mahendragarh) in the state of haryana through public private partnership on dbfot basis
corrigendum : development of yuge yugeen bharat museum (yybm), new delhi - package -1. (sh: ticketing plaza, service tunnel, facade & courtyard works, lifts, mep services and equipment) subwork/packages: ticketing plaza, service tunnel, facade & courtyard works, lifts, mep services and equipment
corrigendum : ms/wk/954 - development, operation and maintenance of berth no. 15 and 16 for handling multipurpose cargo (clean cargo) and containers at kandla on dbfot basis under ppp mode
engineering, procurement and construction (epc) tender for"construction of doubling work including earth work, blanketing, minor bridges, major bridges, utility shifting, station & other buildings, platform work, circulating area, lc work and other miscellaneous works for 25t indian railway standard loading from raxaul (excl.) to narkatiaganj (excl.) (i.e. ch.189.400 to 227.200) (total- 37.80 km) in connection with doubling of raxaul - narkatiaganj section in samastipur division of east central railway"
corrigendum : work for construction of water treatment plants cwrs and cwphs near wtps clear water transmission main from wtp various ipss laying of rising mains to different esrs construction of esrs distribution system in villages providing fhtcs including
jeypore - nabarangpur new bg railway line project: design & construction of new bg railway line between ambaguda(excluding) (13.60 km) to nabarangpur(including) (43.996km) involving earthwork in formation in embankment/cutting, blanketing, side drains, catch water drains, minor bridges, major bridges(excluding bridge no. 85 at km. 37.080 i.e. indravati bridge), road over bridges (robs), road under bridges (rubs), protection works, p.way track works with contractor's own material supplies including supply of track ballast, new wide based psc sleepers, special psc sleepers (for turnouts, improvised sejs, guard rails etc), points (thick web switches) & wcms crossings, glued joints, h-beam/composite sleepers over girder bridges, improvised sejs, all p-way fittings, 2x25 kv ac ohe works, 2x25 kv tss with sp/ssp works along with scada, modification/conversion to underground for overhead electrical ht/lt power line crossings, electrical general services, construction of platforms, station buildings, service buildings, sp/ssp buildings, trd depot building with tower wagon shed, residential buildings, water supply, indoor and outdoor electrification etc. on epc basis in rgda division of east coast railway"
mahagama - pirpainti new rail line: execution of civil, p-way, electrification, signal and telecom works for construction of new rail line between mahagama station (excluding) and pirpainti station (excluding) from km 60.000 to km 92.100 in connection with pirpainti-jasidih new bg rail line project of eastern railway.
corrigendum : development of ecocity 3, new chandigarh, s.a.s nagar (civil, public health and electrical works)
corrigendum : carrying out slope protection works from km 27.410 to km 27.540 and other associated works including construction of approach road, box culvert etc. at melli yard in connection with construction of sivok rangpo new bg railway line project
corrigendum : execution of balance works for major redevelopment of jodhpur railway station of north western railways on engineering procurement & construction (epc)
corrigendum : contruction of industrial buildings and other infrastruture at bhabha atomic research centre, dodda ullarthi challekere taluk, chitradurga district karnataka. sh construction of various precast rcc buildings and peb buildings including other ancillary buildings such as canteen, gas bank , project house , entry portal in zone-i(gate complex with security gate), entry portal in zone -ii (gate complex with security gate), guard houses,fire pump house, pump room for rain water harvesting sewage treatment plant , site development works, specialised works, local body approvals, and other miscellnious works including internal water supply, sanitory installations drainnage and comprehensive electrical and mechanical services comprasing substation equipment, dg sets, internal electrical installaitons and fans lt panels cabling lighting protection system, fire alarm and public addresss system.........and other specialised e&m services (package-ii)
providing facade works like glass, cladding, crown, atrium, canopy skylight, column cladding, pv panel and bmu works in integrated andhra pradesh state secretariat and hod offices (gad tower) in amaravati government complex, andhra pradesh on lump sum contract (percentage tender)
corrigendum : chandanpur- shaktigarh 4th line: execution of civil, p-way, electrification, signal and telecom works for construction of 4th rail line between chandanpur station (incl.) and pallahroad (incl.) from km 40.220 to km 78.120 in connection with chandanpur- shaktigarh 4th line rail project of eastern railway
corrigendum : execution of earthwork in formation, minor bridges, major bridges, station buildings, service buildings, p-way linking work, ballast supply, platform work , pf shelter, drain work, camping facilities, protection works, tunnel between ch: 116.205 km to ch: 116.415 km, and other allied works between barkote(ex) (ch: 98.325 km) - mahuldiha(ex) (ch: 117.525 km) including ambagaon yard in connection with talcher - bimalagarh new bg rail link project.
construction of residential towers at bacheli complex under capacity expansion of bailadila iron ore deposit-10/11a, nmdc bacheli, chhattisgarh comprising 5 nos. type-iii residential towers (s+10), 1 no. type-iv residential tower (s+10), 2 nos. staff hostels (s+10), 2 nos. executive studio apartments(s+10), 3 nos. transit and apprentice hostels(s+10), 1 no. shopping complex and guest house (g+1), 2 mld stp, site development (civil, water supply and firefighting works), external electrical works and demolishing works on epc mode
corrigendum : request for proposal for development of container and coal berths on dbfot basis through ppp mode at balagarh, west bengal on design, build, finance, operate and transfer basis through public partnership mode.
provision of infrastructure development works (earthwork in embankment, bridge extension, retaining wall cum boundary wall, road works, etc.) in connection with development of land for proposed poh cum new emu maintenance depot with emu stabling sidings at vangaon (km 112/1 to km 115/1, west side of existing railway tracks between vangaon & dahanu road stations) under mutp iii & mutp iiia.
corrigendum : mrvc/w/401 - provision of infrastructure development works (earthwork in embankment, bridge extension, retaining wall cum boundary wall, road works, etc.) in connection with development of land for proposed poh cum new emu maintenance depot at vangaon
corrigendum : request for proposal (rfp) for the development of 53,000 sq. m. land, being a part of mog lines land parcel-2, situated near mhow naka, indore, in accordance with the sdcr and master plan, on design-build-finance-operate-sustain (dbfos) mode.
selection of bus operator for procurement, supply, operation and maintenance of 50 fully built pure electric double decker ac buses and development of allied electric and civil infrastructure on gross cost contracting (gcc) on hop-on hop-off basis.
corrigendum : construction of maski bypass starts at existing km 144.220 and ends at existing km 151.760 and sindhanur bypass starts at existing km 168.370 and ends at existing km 180.800 on nh 150a in the state of karnataka
corrigendum : public health rajamahendravaram circle - hybrid annuity model (ham) - execution of roads with drains, central medians, street lighting, parks and other development works in 4 urban local bodies of ph rajamahendravaram circle - rjy package -ii covering urban local bodies of east godavari district
public health circle, nellore - urban infrastructure - providing of roads, central medians, street lighting, parks, construction of integrated market complex and other development works in 6 nos urban local bodies of nellore public health circle under hybrid annuity model (ham) in package - 2
corrigendum : selection of agency for establishment, operation and maintenance of 41 tpd integrated solid waste management (iswm) project in kathua cluster (kathua, lakhanpur, parole and hiranagar), ut of jk, on dbfot basis under ppp mode
corrigendum : special repair works/ capital works related to electrical, mechanical and civil works as and when required basis for the advanced weapons and equipment india limited (aweil) on fixed percentage service charge basis - special repair works/ capital works related to electrical, mechanical and civil works as and when required basis for the advanced weapons and equipment india limited (aweil) on fixed percentage service charge basis.
civil work- 1. central store (03 works); 2. health & medical survey (02 works); 3. east zone (02 works); 4. building project (03 works); 5. west zone (01 work); 6. fire and emergency services department (15 works); 7. west zone (02 works); 8. affordable housing scheme (01 work). ( gujarati image)