FILTERS
construction of balance irrigation network by providing irrigation facilities to culturable command area (cca) of 3382.10 ha. through the construction of a pipe distribution network under a gravity irrigation system on saoli minor no. 9 at river distance (rd) 19800 m, saoli minor no. 10 at river distance (rd) 20280 m, saoli.
View Insights
corrigendum : construction of 1200 seater girls hostel with five hostel blocks (g plus 4) (blocks a,b,c,d & e) and one dining block (g plus 3) (block f) including water supply, sanitary installation, internal electric installations, fire fighting, fire alarm system, lifts, cctv, dg set, ups system, hvac, solar and development works at bhu, varanasi (sh: balance work).
creation of balance irrigation potential 910 ha. by providing irrigation facilities to ica 1598 ha. by construction of pipe distribution network for yergaon distributory offtaking at km 38.270 on asolamendha main canal of gosikhurd project
comprehensive operation and maintenance, routine repairs and special repairs of i.) rural piped water supply scheme (pws-6 nos.), ii.) single village piped water supply schemes (svs-0), iii.) ward level piped water supply schemes in quality affected wards (wls_quality-54 nos.) and iv.) ward level piped water supply schemes in non quality affected wards (wls_non quality-369 nos.) based on item rates; constructed by the public health engineering department including payment to the pump operators, electricity bills for five years.
corrigendum : (3rd call) godavari pushkaralu 2027 tier-1 irrigation department works at various pushkar ghats for construction of 1)asta tirthams(pakshi tirtham vyasa tirtham sangama tirtham chitsuka tirtham extension of brahma tirtham with bharathi platforms narasimha tirtham hanuma tirtha subramanya ghat and gravel road from pakshi tirtham to sironcha bridge) 2)mandapas(temples mandapas aparkarma bhavan pinda pradana mandapam toilet block) and 3) asta tirtham services (internal electrical works internal water supply and plumbing works electrical works site landscape works and site amenities at kaleshwaram(v). mahadevpur(m) jayashankar bhupalpally(d)
comprehensive operation and maintenance and special repair of 54 nos ward level piped water supply schemes (quality), 369 nos ward level piped water supply schemes (non quality) & 6 nos pws scheme based on item rates; constructed by the public health engineering department including payment to the pump operators, electricity bill for five years.
survey, design & construction of works consisting of 6 . 5 0 mld water treatment plant, over head tanks, building works, laying of pipeline, road reinstatement works & sitc of pumping plants, automation works and all other appurtenant works including civil & electro-mechanical works with 05 years o&m including supply of all materials, labour, t&p etc. required for proper completion of kaulagarah water supply scheme under amrut 2.0 programme.
canal water based water supply project for construction of 12.0 mld water treatment plant and other related works including operation and maintenance for a period of 5 years at rampura phul district bathinda, punjab under amrut 2.0 scheme.
corrigendum : 09/2026-2027/se/swc/01 - jack pushing work along railway land for laying 1400 mm dia(approx 515 m) and 1000 mm dia (approx 515 m) ms casing pipe and 1000 mm dia (approx 515 m) and 700 mm dia (approx 515 m) carrier pipe through it ...of sankrail piped water based w/s scheme
jack pushing work along railway land for laying 1400 mm dia(approx 515 m) & 1000 mm dia (approx 515 m) ms casing pipe and 1000 mm dia (approx 515 m) & 700 mm dia (approx 515 m) carrier pipe through it in between km post - 15/13x - 15/29 and laying of 1000 mm dia (approx 1325 m) ms casing pipe and 800 mm dia (approx 1325 m) carrier pipe through it in between railway ohe mast no km - 15/15x & 15/
corrigendum : construction of bus stand, workshop ,and e-bus depot nadaun, tehsil nadaun district hamirpur, h.p - part-i-civil work of bus stand , workshop, and e-bus depot i/c bus charging bay and covered parking i.e. building portion i/c ws, si , site development, boundary wall, rain water harvesting tank, septic tank, c/o pavement work, c/o approach road,
epc contract for providing, laying, jointing, testing and commissioning of ms pipeline from existing diyodarlakhani main pipeline from ch. 17.50 km (sec-2 ips to jerda) to existing ramsan sump of tspl pipeline project, taluka: deesa, district: banaskantha
corrigendum : detailed nit for balance work of retrofitting works of rwss of 97 villages and dhanies of nawa tehsil under jjm in rural area of nawa tehsil with ten years operation and maintenance (up to vtc) excluding one year dlp - as per td
development work of remaining roads, drains, sewerline, waterline and parks in pocket c, madhuban bapudham (part-d)
survey, investigation, design, supply, installation, testing and commissioning of tank filling scheme head works consisting of construction of forebay, jack well cum pump house, vertical turbine pumps coupled to motors, pump house electrical works, necessary valves, delivery pipe, manifold system, electrical panel, soft starter,capacitors,11kv transformer,11/0.433 kv sub-station,11 kv power line and 11 kv terminal bay, rising main, pressure distribution for filling up of 9 nos of mi/zp tanks by lifting water from malaprabha right bank canal at ch 129.000 km near savadi village in ron taluk, gadag district including operation and maintenance for a period of 5 years after successful completion of work for ron tank filling scheme on turn-key basis
development work of remaining roads, drains, sewerlines, waterlines and parks in pocket c, madhuban bapudham (part-c)
construction of national institute of open schooling (nios) at sector-40,atal nagar,village uparwara,naya raipur (c.g.) (1 no office block b plus g plus 2),1 no guest house g plus 1 & 1 no type v quarter g plus 1 icluding water supply,sanitary installation, drainage development and electrical installations.
(i) pardhade: provision of high-level platform at pardhade station of length (375x3.75mx2) (pf 1&2) (pid: 01.01.53.25.3.50.026), (ii)sirsoli- raising of platform from rail level to high level at sirsoli railway station, dn rl pf: 360 m x 4m) & up rl pf : (360m x 4m) (pid : 01.01.53.25.3.50.027), (iii)mahaswad- raising of platform from rail level/medium level (220mx 9.10m) & (144mx9.10m) to high level dn loop pf (240mx7m). (pid : 01.01.53.25.3.50.028), (iv)waghoda : raising and extension of platforms from rail level to high-level platform (555mm x6mm,) including toilet, sitting arrangement, drinking water and drainage arrangement etc. at waghoda railway station. (pid: 01.01.53.25.3.50.030), (v)dongargaon : raising and extension of platform from rail level to high level up (360m x 8m) & dn (380m x 8m), including toilet, sitting arrangement, drinking water and drainage arrangement etc at dongargaon station. (pid : 01.01.53.25.3.50.031), (vi)provision for divyangjan amenities at asirgarh, bagmar, mandwa & duskheda on railway stations.(nsg-6) (pid : 01.01.53.25.3.50.029).
package no-3 design, build, operate and transfer (dbot) of interception and diversion works in nipani, mugalakoda, naaganura, sadalga, sankeshwar, saundatti-yellamma, shedbaala and examba ulbs of belagavi district with 5 years operation and maintenance(including 2 year defect liability period) under swachh bharat mission (urban)2.0 fund
development work of remaining roads, drains, sewerline, waterline and parks in pocket c madhuban bapudham (part b)
construction of english medium college at old central jail premises, agartala, tripura, during the year 2026-27 sh balance portion building portion including internal water supply, sanitary installation, sewage and drainage works. 2nd call
development work of remaining roads, drains, sewerline, waterline and parks in pocket c madhuban bapudham (part-e)
providing drinking water supply to proposed textile park (under pm mitra scheme) near nadisinoor village from proposed barrage across bhima river near madri village under dc works including operation & maintenance for a period of 5 years (including 1 year dlp) through design, build operation and transfer (dbot) mode lumpsum - no variation
corrigendum : operation maintenance and security of water supply scheme of industrial area pithampur district dhar
1. beautification of parks in sector-2 as part of the canal front beautification project for the greater bareilly residential scheme. 2. beautification of parks in sector-1 as part of the canal front beautification project for the greater bareilly residential scheme. 3. construction of a shopping/commercial complex (block-a) in sector-07 of the greater bareilly residential scheme. 4. construction of a shopping/commercial complex (block-b) in sector-07 of the greater bareilly residential scheme. 5. canal front development work on both sides of the canal passing between sectors 1 and 2 of the greater bareilly residential scheme. 6. construction of sewer lines, water lines, rcc drains, electric trenches, park boundary walls, and roads. 7. construction of the 'vishwanath dwar' (gateway) at the entry point to bareilly city on pilibhit road (bada bypass). 8. construction of the 'somnath dwar' (gateway) at the entry point to bareilly city on nainital road (bilwa). 9. maintenance work involving sewer and drain cleaning, verge cleaning, and repairs to drains and sewers in the ramganga nagar residential scheme. 10. installation and fixing of demarcation pillars for the pilibhit residential scheme, bareilly. (hindi document)
comprehensive operation and maintenance, routine repairs and special repairs of i.) rural piped water supply 16 scheme (pws), ii) ward level piped water supply schemes in non quality affected 157 wards (wls_non quality) based on item rates; constructed by the public health engineering department including payment to the pump operators, electricity bills for five years.
12/proc./mpjnm/2026-27 - balance work of lump sum contract for engineering procurement construction testing commissioning trial run and operation and maintenance for 10 years of sada multi village drinking water supply scheme district gwalior
internal development works in sector-07 of greater bareilly residential scheme, including sewer line, water line, rcc drain, electrical trench, park, boundary wall, and road construction.
development work of remaining roads, drains, sewerlines, waterlines and parks in pocket c, madhuban bapudham scheme (part-a)
package no-01 design, build, operate and transfer (dbot) of interception and diversion works in badami, belagali, jamkhandi, kamatagi, mahalingpur, mudhol, rabkavi banhatti and shiruru ulbs of bagalkote district with 5 years operation and maintenance (including 2 year defect liability period) under swachh bharat mission (urban) 2.0 fund
1. construction of knowledge center at t.p. scheme no. 04, seedar, f.p. no. 48 in kaliyabid-seedar-awadiya ward in bhavnagar city., 2. construction of a building for traffic in t.p. scheme no. 2, awadiya (first), f.p. no. 48/3 in awadiya-sakkar-awadiya ward in bhavnagar city., 3. construction of r.c.c. road and compound wall in savaripura ward, ghorad smshan., 4. construction of a park in bhavnagar city, nagzadi, t.p. scheme no. 3, f.p. no. 103, airport road., 5. work of laying 800 mm diameter di pipeline in hillpark area of seedar. ( gujarati image)
chikhaldara water supply scheme, taluka chikhaldara, district amravati (under msjnm).
comprehensive operation and maintenance, routine repairs and special repairs of i.) rural piped water supply 16 scheme (pws), ii) ward level piped water supply schemes in non quality affected 110wards (wls_non quality) based on item rates; constructed by the public health engineering department including payment to the pump operators, electricity bills for five years.
intercepting sewer line, gravity main, treated effluent main, 10.00 mld sewage treatment plant at nagar palika parishad mahoba, district mahoba.
construction of 75.00 mtr wide peripheral road and sewer line between sector-5 and sector-6, yeida. wc-3
construction of 75.00 mtr wide peripheral road and sewer line between sector-09 and airport yeida wc-03
work for water rejuvenation project including ghat redevelopment, riverfront development and allied infrastructure along the kshipra river in ujjain package 2
(1) provision of waiting hall with halt agent room, toilet, drinking water facility & divyangjan facilities at (i) morda tanda & (ii) mohadi railway station.(pid: 01.01.53.25.3.50.040).(2) mordad tanda: -provision of high-level platform of 410 m x6 m at mordad tanda station. (pid: 01.01.53.25.3.50.028).(3)naydongri provision of high-level island platform (300m x 9.20m) at nayadongri railway station. (pid: 01.01.53.25.3.50.028).(4)mohadi :- proposed high-level platform of (410 m x6 m) with station building and minimum essential amenities including divyangjan facilities. (pid: 01.01.53.25.3.50.031)(5)galan - provision of high-level platform up & dn (410mx6m) at galan railway station. (pid: 01.01.53.25.3.50.031)(6) hirapur: proposed raising of rail level pf to high level platform pf no 1 & 2/3 (island) at hirapur railway station (300.00m x9.00m) (pid: 01.01.53.25.3.50.027).(7) provision of divyangjan amenities at nagardevla railway stations (nsg-6) (pid : 01.01.53.25.3.50.029)
package no-12 design, build, operate and transfer (dbot) of interception and diversion works in bankapura, hanagal, hirekerur and savanur ulbs of haveri district with 5 years operation and maintenance(including 2 year defect liability period) under swachh bharat mission (urban)2.0 fund
improvement of imphal planning area water supply system at chinga wtp and singjamei chanam pukhri mapal
corrigendum : canal water based water supply project for construction of 5.00 mld water treatment plant wtp and other related works including 5 years o and m part 2 at samrala town district ludhiana punjab under amrut 2 scheme
design, construction, successful testing and commissioning of water supply scheme pulwama town under urban development sector-capex budget on epc mode for an amount of rs. 1786.23 lacs. - same as above
package no-18 design, build, operate and transfer (dbot) of interception and diversion works in babaleshwar, devarahipparagi, indi, manuguli, muddebihal, sindgi and thikota ulbs of vijayapura district with 5 years operation and maintenance(including 2 year defect liability period) under swachh bharat mission (urban)2.0 fund
package no-10 design, build, operate and transfer (dbot) of interception and diversion works in ron, nargund, gajendragadh, lakshmeshwara, naregal and mundaragi ulbs of gadag district with 5 years operation and maintenance(including 2 year defect liability period) under swachh bharat mission (urban)2.0 fund
corrigendum : jind city- construction of... - various size of sewer line and construction of 1 no. 10 mld stp
corrigendum : providing and laying of sewer network for ahmed nagar pandach illahi bag 90 feet road right side rangpora zakura and gulab bagh
package no-20 design, build, operate and transfer (dbot) of interception and diversion works in hunsagi, kakkera and kembavi ulbs of yadagiri district with 5 years operation and maintenance(including 2 year defect liability period) under swachh bharat mission (urban)2.0 fund
dnit for providing, laying,... - laying of master sewer line in sector 26 to 35
construction of goods circulating area, goods office, merchant room, labour room with drinking water facility at dtc.(two packet system)