FILTERS
corrigendum : construction of sarkhej-dholera semi high-speed double railway line, including spur lines to lothal nmhc and dholera airport terminal; comprising civil works, which includes formation & viaduct, bridges, station buildings, & associated works; track system (ballasted & blt), overhead traction system including electrical general services; signalling & telecommunication system, operating control centre, integration of all systems complete in all respect including testing & commissioning and all appurtenant works under jurisdiction of western railway
View Insights
corrigendum : nhidcl/meghalaya/ hsc/package-03/2026 - development, maintenance, management and operation of greenfield high-speed corridor from mawlyngkhung (near shillong) in meghalaya to panchgram (near silchar) in assam by 4-laning with paved shoulders on hybrid annuity basis. (package-3)
corrigendum : construction of the new integrated high court complex on plot bearing ct.s. no. 629/1234/a/1 at bandra government colony bandra (e)mumbai. epc (engineering, procurement and construction)
engineering procurement and construction (epc) of construction of viaducts, ror/rfo, major bridges, minor bridges, animal underpass, rub/lhs, tunnel/cut- cover, earthwork, blanketing, trolley refuge, turfing, buildings, retaining wall, toe wall etc. and other associated worksfor construction of new double line track for dfcc loading from ch.158.00 to ch.184 in koderma detour section in sonnagar- andal 3rd and 4th line project on epc mode in dhanbad division of east central railway.
development of high-speed access controlled greenfield corridor from shamli-gorakhpur from ch. 510.700 to ch.579.950 in the state of uttar pradesh on ham mode (package-10) (design length 69.25 km.)
construction of elevated corridor from yeshwanthapura (methikere cross) to old madras road (tin factory junction kr puram) via iisc - mekri circle - jayamahal - st. john church road - ulsoor lake (3 lane x 2 flyover) in bengaluru city on boot (toll) mode - dynamic duration
development of greenfield high-speed access controlled corridor from shamli-gorakhpur from ch.143.100 to ch.212.600 in the state of uttar pradesh on ham mode (package-3)
development of greenfield high-speed access controlled corridor from shamli gorakhpur from ch. 274.000 to ch. 348.039 in the state of uttar pradesh on ham mode (package-6)
corrigendum : development of link connector corridor between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg2 from km7.926-km18.560 (tl 26.039km mcw fob loop ramp) in up on ham
corrigendum : development of link / connector corridor between national highway-19 (nh-19) and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city package 1 from km 0+000 to km 7+926 (total length is 20.000 km including mcw /loop/ramp/link road) in the state of uttar pradesh on hybrid annuity mode
development of greenfield high-speed access controlled corridor from shamli gorakhpur from ch. 212.600 to ch. 274.000 in the state of uttar pradesh on ham mode (package-5)
development of greenfield high speed access controlled corridor from shamli gorakhpur from ch. 84.500 to ch. 143.100 in the state of uttar pradesh on ham mode (package 2)
development of greenfield high-speed access controlled corridor from shamli gorakhpur from ch. 348.453 to ch. 422.500 in the state of uttar pradesh on ham mode (package7)
corrigendum : 55262-002-ind jharkhand action for generating responsive and inclusive transformations in health infrastructure (jagriti) - jagriti/rims2/cw/01 construction of 2,800 bedded phase-i (1400 beds)multi specialty teaching hospital cum medical college at ranchi (jharkhand), india (design and build contract)
construction of elevated corridor from marenahalli main road (ragigudda junction) to kanakapura main road via bwssb pipeline road (thalaghattapura junction) in bengaluru city on boot (toll) mode dynamic duration
corrigendum : construction of civil works of barrage and stilling basin, u/s plastic cutoff trench, power intake structures, tunnel, outfall structure, associated hm works including adit plug, etc and associated works of link-3 project in himachal pradesh
corrigendum : const. of 4l gf corridor ghazipur zamania saiyad raja of nh24 old nh97 with extens. up to varanasi ranchi kolkata corridor km 0.000 to km 51.850 tl 51.850 km in uttar pradesh on ham mode pkg ii
corrigendum : development of high-speed access controlled greenfield corridor from shamli gorakhpur from ch. 422.500 to ch.466.000 in the state of uttar pradesh on ham mode (package8) (design length 43.500 km.).
corrigendum : rfp for development of a link / connector corridor connecting the national highway31 (nh-31) & varanasi ring road, along the river varuna for decongestion of varanasi city package 2 from km 11+744 to km 19+420 (total length is 14.720 km including mcw/loop/ramp) in the state of uttar pradesh on hybrid annuity mode.
composite work (civil, electrical & s&t) comprising formation, viaducts, minor/major bridges, rubs/subways, station buildings, staff quarters, platforms, passenger amenities, supply & spreading of ballast, track linking and p-way works, along with design, supply, erection, testing & commissioning of 25 kv ac ohe and supply, installation, testing & commissioning of telecom outdoor systems including trenching, laying, blowing, splicing & jointing of 48f x 2 ofc on both sides of the track, one-side quad cable, emergency communication system and other associated works between tanda road (excluding) to jamaniya (including) from km 101.29 to km 125.92 (length: 24.63 km) in connection with the chhotaudepur-dhar new broad gauge line project in vadodara division of western railway.
corrigendum : jeypore-malkangiri new bg railway line: design & construction of new bg railway line from km 41.50 to km 69.60 (including nunkhari station) involving earthwork in formation, embankment/cutting, blanketing, side drains, catch water drains, minor bridges, major bridge, road under bridge (rubs), viaducts, tunnels, protection works, blt works, p.way track works with contractor's own materials (except new/sh rails), construction of platforms, station buildings, service buildings, sp/ssp buildings and residential buildings, water supply, indoor and outdoor electrification, provision of 1x25 kv conventional type ohe, tunnel ohe with rocs, tunnel lighting, tss, sp, general power supply arrangements modifications/conversion to underground for overhead electrical ht/lt power line crossings etc on epc basis in waltair division of east coast railway.
construction of 10 nos. elevated metro stations and viaduct, from baranagar metro station (excluding) to mangal pandey metro station (ch: 4.68 km to ch: 16.98 km approx.) in connection with baranagar- barrackpore metro corridor of kolkata metro railway line.
package- bbvs: "construction of 10 nos. elevated metro stations and viaduct from baranagar metro station (excluding) to mangal pandey metro station (ch: 4.68 km to ch: 16.98 km approx.) in connection with baranagar- barrackpore metro corridor of kolkata metro railway line, west bengal, india".
corrigendum : construction of doubledecker structures of approx. 6.652 km from ch.11.734 km to ch.16.746 km in c1 and from ch.4.620 km to ch.6.260 km in c2 and stations.vinayaka layout,papareddypalya,bda complex nagarbhavi in c1 at sunkadakatte in c2 of bmrcl,ph3.
corrigendum : construction of double decker structures for a length of 5.408 km from ch.6.326 km to ch.11.734 km and 4 nos of doubledecker metro stations, hoskerehalli, dwaraka nagar, mysore road and nagarbhavi circle of bmrcl, ph3.
corrigendum : construction of doubledecker structures for a length of 6.521 km excluding jp nagar 4th ph station from ch-0.330 km to ch.6.326 km and 4 nos of elevated double decker metro stations jp nagar 5th ph,jp nagar,kadirenahalli and kamakya jn. of bmrcl ph3.
1) design and construction of elevated viaduct and 11 elevated stations (including architectural finishing) viz. b2 bypass circle, durgapura, gopalpura, gandhinagar, nehru place, ram bagh circle, narayan circle, sms hospital, ashok marg, government hostel and khasa kothi (phase-ii), architectural finishing works of 10 stations viz. prahladpura, manpura, bilwa kalan, bilwa, goner mod, sitapura, jecc, kumbha marg, haldighati gate and pinjrapole gaushala; modification of part operational corridor of phase-1 and constructing khasa kothi (phase-1) station under jaipur metro phase- ii mrts, 2) design and construction of elevated viaduct and 12 elevated stations (including architectural finishing) viz. collectorate, panipech, ambabari, chomu puliya, vidhya nagar sec-2, vidhya nagar, vki road no 5, vki road no 9, vki road no. 14, harmada, harmada ghati & todi mod under jaipur metro phase- ii mrts.
construction of new railway bg line in km 28/970 to 42/040 in between kulthana including and rajpura stations including earthwork, minor bridges (03 nos) and major bridges (07 nos), station buildings, tunnels (7 nos) and mega bridge ( 03 nos) in connection with ratlam mhow khandwa gauge conversion in the state of madhya pradesh
pre-bid assistance for preparation of priced boq for the tender- construction of new railway bg line in km 28.970 to 42.040 in between kulthana station (including) and rajpura station (including) earthwork, minor bridges (03 nos) and major bridges (07 nos), station buildings, tunnels (7 nos) and mega bridge (03 nos) including electrification in connection with ratlam mhow khandwa gauge conversion in the state of madhya pradesh
construction of gpra at amaravati, the new capital city of andhra pradesh. sh: planning, designing and construction of 1504 residential quarters comprising 600 type-ii quarters in 3 towers ( g plus 24 each), 600 type-iii quarters in 3 towers ( g plus 24 each), 228 type-iv quarters in 3 tower ( g plus 18 each), 56 type-v quarters in 1 tower ( g plus 13) and 20 type-vi quarters in 1 tower ( g plus 9), with a common double basement, ancillary building ( g plus 4), boundary wall, entrance gate complex, electrical substations, underground water sump with pump room, sewage treatment plant and all associated civil, electrical, mechanical, horticulture and development works and services, complete on engineering, procurement and construction (epc) mode-i. subwork/packages: package
corrigendum : construction of 6-lane elevated corridor from maduravoyal junction (chainage km 13.965) chennai outer ring road (chainage km 22.100) including junction improvements at km. 22.368 of nh-48 (old nh4) in tamil nadu on hybrid annuity mode (project length-8.135 kms
corrigendum : jeypore-malkangiri new bg railway line: design & construction of new bg railway line from km 69.60 to km 125.18 involving earthwork in formation , embankment/cutting, blanketing, side drains, catch water drains, minor bridges, major bridge, road under bridge (rubs), road over bridge (rob's), protection works, p.way track works with contractor's own materials(except new/sh rails) construction of platforms, station buildings, service buildings, sp/ssp buildings and residential buildings, water supply, indoor and outdoor electrification, provision of 1x25 kv conventional type ohe, provision of 2 nos. tss, 1 no sp, construction of new sub-stations, electrification of station building, circulating areas, fobs, pfs, quarters, goomties, modification/conversion to underground for overhaed electrical ht/lt power line crossings etc. on epc basis in rayagada division of east coast railway.
development of satellite township phase-l, package 3 (group housing 02) including allied works at rakh gund aksha, bemina, srinagar (j and k) on design, engineering, procurement and construction (epc) basis with operation and maintenance of 2 years.
corrigendum : development of satellite township phase-l, package 3 (group housing 02) including allied works at rakh gund aksha, bemina, srinagar (j and k) on design, engineering, procurement and construction (epc) basis with operation and maintenance of 2 years
corrigendum : construction of ratan tata udyog bhavan midc (hq) along with printing press building for maharashtra industrial development corporation on engineering procurement and construction (epc) mode.
construction of 4.97 km elevated viaduct from koteshwar road dead end to start of ramp of underground section, including 4 nos. elevated stations viz. ashram road, koteshwar prachin mandir, sabarmati river, sardar nagar and design, construction and completion of 1.01 km of underground section comprising of twin cut & cover tunnel between ramp to dead end, including ramp and 01 no. underground metro station for ahmedabad metro rail project, phase-2a
supply of piling, civil, structural and sheeting work for ancillary buildings and plant bop facilities
corrigendum : gunupur-theruvali new bg line project : design and construction of new bg railway line from km 122.750 to km 141.940 (excluding rcc box, rob br. no 388 from km 137.725 to 137.925 but including p way & ohe works) involving 08 nos of tunnels (t-2 to t-9) & from km 110.02 to km 113.12 involving 1 no tunnel(t-1), blt works & its approaches and earthwork in formation in embankment/cutting, blanketing, side drains, catch water drains, minor bridges, major bridge, road over bridge (robs), road under bridge (rubs), protection works, p.way track works with contractor's own material supplies including supply of track ballast, new wide based psc sleeper, special psc sleepers (for turnouts, improvised sejs, guard rails etc), point (thick web switches & wcms crossing, glued joints, h- beam/ composite sleepers over girder bridges, improvised sejs, all p-way fittings, ohe foundations, supply and erection of ohe masts, provision of 1x25 kv conventional type ohe (ohe-22.660tkm) including 2.86 km rocs in tunnel, provision of one feeding post (tss) modifications/conversion to underground for overhead electrical ht/lt power line crossings, construction of platforms, station buildings, fob, service buildings, sp/ssp buildings and residential buildings, water supply, indoor and outdoor electrification works etc in waltair division of east coast railway.
engineering, procurement and construction (epc) tender for"construction of doubling work including earth work, blanketing, minor bridges, major bridges, utility shifting, station & other buildings, platform work, circulating area, lc work and other miscellaneous works for 25t indian railway standard loading from raxaul (excl.) to narkatiaganj (excl.) (i.e. ch.189.400 to 227.200) (total- 37.80 km) in connection with doubling of raxaul - narkatiaganj section in samastipur division of east central railway"
corrigendum : development of the bus terminal alongwith commercial facilities at karnal (balari bye-pass)
corrigendum : development of satellite township phase-l, package 2 (group housing 01) including allied works at rakh gund aksha, bemina, srinagar (j and k) on design, engineering, procurement and construction basis with operation and maintenance of 2 years
request for qualification (rfq) for development of international branch campus (ibc) building project at 24e in sez area of gift city.
engineering procurement and construction (epc) for "construction of doubling work including earthwork, blanketing, minor bridges, major bridges, lhs/rubs, track works, platform work, station building, fobs, other buildings, associated s&t and electrical utility shifting works and associated miscellaneous works for 25t indian railway standard loading from karnauti station(including-ch. 2.844 km) to bihar sharif station(excluding-ch 29.350 km), from ch. 1.900 km to 28.192 km (total- 26.292 km) in connection with the doubling of the bakhtiyarpur-rajgir - tilaiya section"
corrigendum : selection of associate contract partner (acp) for undertaking development of 100 bedded super specialty hospital in suva republic of fiji
corrigendum : oot/circle/133/drydock/2023 - development of ship docking and repair infrastructure in pathfinder creek at vadinar
development of ship docking and repair infrastructure in pathfinder creek at vadinar
corrigendum : c/o new boys and girls hostels in maulana azad medical college, new delhi on epc mode
corrigendum : construction of medical college (100 admissions) and hospital at agia, goalpara district, assam
corrigendum : contruction of industrial buildings and other infrastruture at bhabha atomic research centre, dodda ullarthi challekere taluk, chitradurga district karnataka. sh construction of various precast rcc buildings and peb buildings including other ancillary buildings such as canteen, gas bank , project house , entry portal in zone-i(gate complex with security gate), entry portal in zone -ii (gate complex with security gate), guard houses,fire pump house, pump room for rain water harvesting sewage treatment plant , site development works, specialised works, local body approvals, and other miscellnious works including internal water supply, sanitory installations drainnage and comprehensive electrical and mechanical services comprasing substation equipment, dg sets, internal electrical installaitons and fans lt panels cabling lighting protection system, fire alarm and public addresss system.........and other specialised e&m services (package-ii)
detail design procurement construction testing and commissioning of extension to vidhan bhavan at nagpur construction of new adjoining administrative building part 1 at civil lines nagpur on epc basis