FILTERS
construction of new bg double line from kharsia (km 0.00) to balodabazar (km 110.500) and y-connectivity from jharadih including earthwork in formation, bridges, ror (rail over rail), rob (road over bridge), rub (road under bridge), service buildings, staff quarters, p-way works (including supply of ballast, p-way material exept rail), electrification (2x25 kv ohe, psi, plc & electrical general work), and signalling & telecommunication works, along with allied and associated miscellaneous works in connection with kharsia- parmalkasa 5th & 6th new bg line project under south east central railway in the state of chhattisgarh.
View Insights
1) new broad gauge single line of railway project comprising the section commencing from paradol takeoff point (km 947.257) to nagpur road station (connecting pointkm: 964.820) and slewing of existing boridand-chirmiri line from km:946.640 to km: 947.257 in the state of chhattisgarh in the south east central railway zone in epc mode., 2) construction of new bg double line from kharsia (km 0.00) to balodabazar (km 110.500) and yconnectivity from jharadih including earthwork in formation, bridges, ror (rail over rail), rob (road over bridge), rub (road under bridge), service buildings, staff quarters p-way works (including supply of ballast, p-way material exept rail), electrification (2x25 kv ohe, psi, plc & electrical general work), and signalling & telecommunication works, along with allied and associated miscellaneous works in connection with kharsia-parmalkasa 5th & 6th new bg line project under south east central railway in the state of chhattisgarh.
composite work (civil, electrical & s&t) comprising formation, viaducts, minor/major bridges, rubs/subways, station buildings, staff quarters, platforms, passenger amenities, supply & spreading of ballast, track linking and p-way works, along with design, supply, erection, testing & commissioning of 25 kv ac ohe and supply, installation, testing & commissioning of telecom outdoor systems including trenching, laying, blowing, splicing & jointing of 48f x 2 ofc on both sides of the track, one-side quad cable, emergency communication system and other associated works between tanda road (excluding) to jamaniya (including) from km 101.29 to km 125.92 (length: 24.63 km) in connection with the chhotaudepur-dhar new broad gauge line project in vadodara division of western railway.
composite work (civil, electrical & s&t) comprising formation, viaducts, minor/major bridges, rubs/subways, station buildings, staff quarters, platforms, passenger amenities, supply & spreading of ballast, track linking and p-way works, along with design, supply, erection, testing & commissioning of 25 kv ac ohe and supply, installation, testing & commissioning of telecom outdoor systems including trenching, laying, blowing, splicing & jointing of 48f x 2 ofc on both sides of the track, one-side quad cable, emergency communication system and other associated works between jamaniya (excluding) to tirla (excluding) from km 125.92 to km 147 (21.08 km) in connection with the chhotaudepur-dhar new broad gauge line project in vadodara division of western railway.
engineering, procurement and construction (epc) contract for quadrupling (laying of new 3rd & 4th lines) of tracks between sulehali west and kurugunta (kqt) stations including electricfication and signalling &telecommunication works in connection with wadi-secunderabad quadrupling project in the state of karnataka.
corrigendum : jeypore-malkangiri new bg railway line: design & construction of new bg railway line from km 69.60 to km 125.18 involving earthwork in formation , embankment/cutting, blanketing, side drains, catch water drains, minor bridges, major bridge, road under bridge (rubs), road over bridge (rob's), protection works, p.way track works with contractor's own materials(except new/sh rails) construction of platforms, station buildings, service buildings, sp/ssp buildings and residential buildings, water supply, indoor and outdoor electrification, provision of 1x25 kv conventional type ohe, provision of 2 nos. tss, 1 no sp, construction of new sub-stations, electrification of station building, circulating areas, fobs, pfs, quarters, goomties, modification/conversion to underground for overhaed electrical ht/lt power line crossings etc. on epc basis in rayagada division of east coast railway.
engineering, procurement and construction (epc) tender for"construction of doubling work including earth work, blanketing, minor bridges, major bridges, utility shifting, station & other buildings, platform work, circulating area, lc work and other miscellaneous works for 25t indian railway standard loading from raxaul (excl.) to narkatiaganj (excl.) (i.e. ch.189.400 to 227.200) (total- 37.80 km) in connection with doubling of raxaul - narkatiaganj section in samastipur division of east central railway"
construction of 3rd line work including earthwork, blanketing, minor bridges, major bridges, lc work and other miscellaneous works for 25.0t and dfc feeder route of indian railway standard loading, execution of indoor & outdoor s&t works, execution of general electrical works, installation and commissioning of 2x25 kv overhead equipment (ohe) for traction and power supply in connection with the 3rd line work of chandil- madhukunda section in adra division of south eastern railway on engineering, procurement & construction (epc) mode.
engineering procurement and construction (epc) for "construction of doubling work including earthwork, blanketing, minor bridges, major bridges, lhs/rubs, track works, platform work, station building, fobs, other buildings, associated s&t and electrical utility shifting works and associated miscellaneous works for 25t indian railway standard loading from karnauti station(including-ch. 2.844 km) to bihar sharif station(excluding-ch 29.350 km), from ch. 1.900 km to 28.192 km (total- 26.292 km) in connection with the doubling of the bakhtiyarpur-rajgir - tilaiya section"
jeypore - nabarangpur new bg railway line project: design & construction of new bg railway line between ambaguda(excluding) (13.60 km) to nabarangpur(including) (43.996km) involving earthwork in formation in embankment/cutting, blanketing, side drains, catch water drains, minor bridges, major bridges(excluding bridge no. 85 at km. 37.080 i.e. indravati bridge), road over bridges (robs), road under bridges (rubs), protection works, p.way track works with contractor's own material supplies including supply of track ballast, new wide based psc sleepers, special psc sleepers (for turnouts, improvised sejs, guard rails etc), points (thick web switches) & wcms crossings, glued joints, h-beam/composite sleepers over girder bridges, improvised sejs, all p-way fittings, 2x25 kv ac ohe works, 2x25 kv tss with sp/ssp works along with scada, modification/conversion to underground for overhead electrical ht/lt power line crossings, electrical general services, construction of platforms, station buildings, service buildings, sp/ssp buildings, trd depot building with tower wagon shed, residential buildings, water supply, indoor and outdoor electrification etc. on epc basis in rgda division of east coast railway"
mahagama - pirpainti new rail line: execution of civil, p-way, electrification, signal and telecom works for construction of new rail line between mahagama station (excluding) and pirpainti station (excluding) from km 60.000 to km 92.100 in connection with pirpainti-jasidih new bg rail line project of eastern railway.
corrigendum : chandanpur- shaktigarh 4th line: execution of civil, p-way, electrification, signal and telecom works for construction of 4th rail line between chandanpur station (incl.) and pallahroad (incl.) from km 40.220 to km 78.120 in connection with chandanpur- shaktigarh 4th line rail project of eastern railway
corrigendum : execution of earthwork in formation, minor bridges, major bridges, station buildings, service buildings, p-way linking work, ballast supply, platform work , pf shelter, drain work, camping facilities, protection works, tunnel between ch: 116.205 km to ch: 116.415 km, and other allied works between barkote(ex) (ch: 98.325 km) - mahuldiha(ex) (ch: 117.525 km) including ambagaon yard in connection with talcher - bimalagarh new bg rail link project.
request for proposal (rfp) for providing project general management services for new line, multitracking, gauge conversion, electrification and other important works etc. in construction organization under cao/c/adi of western railway for a period of 60 months.
provision of infrastructure development works (earthwork in embankment, bridge extension, retaining wall cum boundary wall, road works, etc.) in connection with development of land for proposed poh cum new emu maintenance depot with emu stabling sidings at vangaon (km 112/1 to km 115/1, west side of existing railway tracks between vangaon & dahanu road stations) under mutp iii & mutp iiia.
engineering, procurement and construction (epc) for "signalling & telecom works in connection with the 3rd and 4th line between chirailapothu to paharpur and koderma to pradhankhunta (exclusive) (total- 242 km approx) of east central railway
earthwork in formation, construction of major & minor bridges, retaining wall, drains, supply of ballast, p. way materials & track linking works, construction of building and allied works from ch 9/190 km (take-off) to ch 15/342 km (de) in connection with proposed siding for the work of rail connectivity for proposed phase-ii silo (02 nos. -20mty) at lakhanpur area of mcl at jharsuguda, odisha. pkg-ii
mcl lakhanpur phase ii - earthwork in formation, construction of major minor bridges, retaining wall, drains, supply of ballast, p. way materials track linking works, construction of building and allied works from ch 9/190 km takeoff to ch 15/342 km de in connection
corrigendum : "execution of third line bg track between ranaghat jn. (excl.) and krishnanagar jn. (excl.) from km 75.210 (from sealdah) to km 97.585 (from sealdah) including electrification & signalling works" on epc mode.
south coast railway (scor) (construction organization) - engineering, procurement and construction (epc) contract for proposed double lines with rail over rail (ror) between new erragudi & existing gooty fort stations, excl. gooty yard, from km.0 to km.7.70 and from km.9.40 to km.12.00 (length - 10.30 km), in guntakal division of south coast railway (scor) in the state of andhra pradesh.
rate contract for e-check of cil make engine kta 50l of 1400 hp demu
palanpur- samakhiali- gandhidham section- elimination of level crossings no. 79, 90, 107, 108, 115, 116, 201, 212 & 220 by providing road under bridges between under jurisdiction of sr.den (nw)-adi. (09 nos.)
corrigendum : execution of ballast less track works from shivalingapuram station km. 45.483 to borraguhalu station km. 72.550 in connection with kottavalasa koraput doubling project of rayagada division, east coast railway on epc mode
through sleeper renewal (p) by agency's track laying (pqrs/sqrs/qrs/tle) portal and material (except rail) complete at purulia jn. - chandil jn. - tsr(p) (dn)- 20.281 tkm., purulia jn. - chandil jn. - tsr(p) ( up) - 16.289 tkm, kharagpur - bhadrak (up & dn) - tsr(p) - 49.619 tkm, (kgp & adra division) total tsr(p) =86.189 tkm. in ser
corrigendum : design, supply, installation, testing and commissioning of interoperable signalling system for lajpat nagar - saket g-block corridor (line-11) of delhi metro phase-iv mrts.
comprehensive annual maintenance contract for axle mounted disc brake system of lhb coaches ( ftrtil make).
s&t works comprising trenching, laying of cables, construction of foundations, erection of location boxes, signals and other outdoor equipment, associated wiring in connection with the yard remodeling of 05 stations (talodhi, rajoli, mul-maroda, kelzar and chandafort), including design, supply, installation, testing and commissioning of new ei, msdac, ips, lc gate etc., subsequent modifications to ei systems and associated indoor and outdoor s&t works in station yards and block sections, and s&t works in facilitation of engineering works, in connection with the doubling work of the gondia-chandafort section.
corrigendum : provision of ballastless track in the main line in the various stations of kharagpur division and ranchi division.
additional work for completion of devgarh madariya - nathdwara gc section including protection works, rob/rub approaches, platforms, platform shelters,rub covering shed, circulating area, drain, retaining wall, quarter works and other ancillary works connection with devgarh madariya - nathdwara gauge conversion project under ajmer division of north western railway.
annual maintenance contract for m/s. faiveley make axle mounted disc brake system fitted in lhb coaches at carriage workshop, lallaguda, secunderabad.
complete track renewal (p) 60 kg = 31.475 tkm and through sleeper renewal(p)=11.444 tkm. total=43.019 tkm by using any track laying equipment (tle) in sdah division of eastern railway
scr construction organization- nanded division- proposed yard arrangements at dinegaon yard from km. 167.500 to 170.200 (2.70kms) and jalna yard at km. 174.975 to 177.450 (2.475kms) (total:5.175kms) in connection with proposed doubling of track from chhatrapati sambhaji nagar to parbhani stations and as a part of jalna- jalgaon newline: execution of earth work in formation, construction of minor bridges, fob, station building, rbg rooms, goompties, staff quarters, high level platform, collection of ballast, transportation of p.way materials, laying and linking of track and other connected miscellaneous works etc
1) construction of 05 nos. limited height subway ka-59 between piardoba- bishnupur, ka-79 between ondagram-bankura,ka-132 between indrabil-adra, br- 23 between chhandar-brindabanpur, br-29 between brindabanpur-srirampur under den/east/adra. 2) execution of balance work such as construction of shed, drain etc. at subway br-37 & br-42 between hamirhati and sonamukhi section. 3) cess repair under the jurisdiction of den/east/adra.
work for survey, design, supply, installation, testing & commissioning of automatic block signaling work using multi section digital axle counter for continuous track circuiting along with provision of addtional hardware of medha make ei in connection to commissining of 3rd line birectional abs in gdk-buw section of lucknow division of north eastern railway.
design, supply, installation, testing and commissioning of multi section digital axle counter at stations of virar-surat section of mumbai division, western railway.
corrigendum : manufacturing and supply of 3105 mt head hardened rails uic 60/60 e-1(class-a), 1080 grade, irs-t-12-2009, including loading, unloading and transportation upto patna store for patna metro rail project.
manufacturing & supply of 3105 mt head hardened rails uic 60/60 e-1 (class-a), 1080 grade, irs-t-12-2009, including loading, unloading & transportation upto patna store for patna metro rail project.
construction of service building, s&t rooms, gate lodge at level crossing, rail/ high level passenger platforms, fencing, extension of minor bridges etc. provision of station name board, including dismantling of existing building structure & fencing, up gradation/ extension of level crossing, construction of limited height subway/ road under bridge in lieu of lc by pushing method of precast box segments under running traffic condition including construction of approaches, provision of height gauges at lhs and l-xings etc. and linking of bg track & turnouts, provision of glued joints & sejs, dismantling of existing track & turnouts, handling, lifting, loading, leading, unloading and spreading of ballast, handling of p.way material including working in bni/ ni period and other allied works at dalel nagar, chodiala, aghwanpur station on lucknow-moradabad-saharanapur section in c/with "longer loops in both direction at dalel nagar & chodiala" and "extension of siding to accommodate full train load" in the jurisdiction of dy ce/c/mb unit on moradabad division
makholi-mathura section-tsr(p)-98.755 kms by pqrs with contractor's portal 87.569 kms & manual-11.186 kms including subsidiary work with bcm.
comprehensive annual maintenance contract for 3phase emu rakes with oem m/s medha
s&t work in connections with enhancing the system redundancy by provision of digital axle counters in parallel with track circuits at stations yard in section of kte-sgrl on jabalpur division of west central railway (signalling work).
customized amccmc for pre-owned products - frauscher make rdso approved msdac system; frauscher; comprehensive maintenance contract (cmc); as specified in bid document; yes
design, supply, installation, testing and commissioning of electronicinterlocking (e.i) system along with other indoor and outdoor signalling works at sanjan, dungri ,amalsad, bhilad, and bililmora stations of mumbai division,western railway.
bilaspur division: tsr(p)-20.294tkm (champa - gevra road section), tsr(p) - 31.677 tkm (bilaspur - anuppur section), tsr(p) -23.428 tkm (anuppur-katni section) & tsr(p)-9.511 tkm (anuppur-ambikapur section), total 84.91 tkm, by contractor's pqrs portal.
subwork-1: utility shifting of signalling & telecommunication (s&t) assets in connection with jru-bay doubling, hpt-bay quadrupling, and other locations under cn/ubl.subwork-2: laying of 2 x 48-core optical fibre cable (ofc) and 6- quad cable suitable for jru-bay doubling and hpt-bay quadrupling projects and other locations under cn/ubl.
provision of ballast less track at line no. 01 & 03 of patna saheeb station and line no. 02 & 03 of fatuha station under jurisdiction of sr.den/track/dnr of danapur division
1. provision of dual msdac in place of dc track circuits at vskp-gpt auto-section of visakhapatnam division. 2. provision of dual msdac for redundancy between gpt-dvd auto-section of visakhapatnam division. 3. provision of dual msdac for redundancy at oec yard & ryd yard in marshalling yard of visakhapatnam division.
development of a crossing station between tata and haludpukur with provision of an additional full length goods line and two coaching stabling line.
name of the work: hyderabad division: signal & telecom arrangements (1) reliability improvement of gwd-pasr & pasr-rc section block circuits and provision of multi section digital axle counter (msdac) complete system in dual detection to existing track circuits at pasr station yard, (2) modification of circuits to suit kavach at 4 stations i.e, bmo, fm, ur & dtp as per new policy, 3) provision of path redundancy and media redundancy for signalling systems i.e, electronic interlocking, automatic signalling, msdac and data logger in automatic signalling section of med-bmo and fm-ur sections, 4) extension of existing rcc abs hut (relay room & battery room) in connection with the work of "replacement of track circuit with multi section digital axle counter (msdac) on stpd 'a'-kcg-fm and stpd 'b'-mjf-cvb-bmo auto sections", 5) extension of existing rcc abs hut (relay room & battery room) in connection with the work of" replacement of analog axle counter on loop lines with msdac on entire station at vdi, gwd, kqq, wpr, mqn & bdhn stations" & 6) proposed construction of gate hut (relay room & battery room) in connectio with "interlocking of level crossing gate nos. 57, 95, 174, 231, 235 & 238".
provision of ei based automatic signalling in lieu of relay based interlocking with dual detection by msdac and other associated works along with suitable indoor alterations in stations enroute agc-rkm, bfp-rnka & rnka-kxm automatic sections of agra division of north central railway.